HomeMy WebLinkAboutNCC243072_Site Plan or Location Map_20241009 • — --...111114111111111Willir
. —__ ' T____.m..ligainew---..wimm
, , ,
,,,fr 4.0/ A� apillii.1111111111111.1
itifipti
, , , , , / , , i i ,
4,
, , / / ll / / / / / / /
..,__
�, n SITE ' / / / / / / / / / / / / II /
ill�;���...' ,` �� \ j' CONS MITSTION � / / / / /i 2 'O�� OPEN 1 Lot Plan Lot Plan 5 •Lot Plan • /*A1 ,
N „D,&„E„ „D„ E„ D ,E„ IU21II /
ITION /\ LIMITS 10'UTILI EASEMENT •
illi EASE NT I�6 /
Rough''rigs Trail Rol
401
•
q� M•ILdg�Trai] / / (
SODDING KIOSK A
A EA Imo /
a.aaa.aa..,aFa,B ` I OPEN \s\\ / 66oB,laAa.AccaaaopaSPAC 49 / F8C
I •/ I In
\
1 \IPIPA \wig MArp"apw�a 1. Iw '� 64 ` 1 4 i / /
m
I )
�\\51 Er U - I\ , iw 69\ I \ 21 \= _ / /
o
\ l 60
\ I (' ( ( ( 2 /
� 22
2� 'a F. 70
'il;oni I 41 \ I Ill,
tl All VIk \ I ( ( I \ lilw ��
�wPaalA l.,o RroAaemBar. NIGX,zI,Baa.w,.,la
oaa.wAraB all Mo wBea aaaa Y�
W.T.9011-M�arAm AeO. Ae a pp s w rs a arvp as \ I \ \ It
\\ I / l I W\ 23 NM I \ \\APPEARANCE OF GOOD SODIm I \ \
1 \ \ PARCEL.ID 1A, I — / Glassmine Trai] I z1 ( \ \
I 000548 0 r NIMI1
ial'eur ,», o" I �C 18,SLID 664 O�EN I
oE.sEmo.�.. I II \ SP'CE I 1uTy�As11ii
/
.....
I 4ii 40 1 / /� �_ _ J
General Erosion Control Notes / Q�.SP I ® N _ _ J //
L Only the areasshown shall be disturbed Q / /I �/ / / / / / ///2.All disturbed areasshall be grassed and ) / / —� el ��/ O r 31,c( / \ / /
mulched as s OS possible d s intninsd N
until pemanent cover Is established. \� l il
41
_„.0. ____ ,,c",,,c:,-"--______ _ ,,, ____ ( Vt.f
( 7
/ \ / op./ / A0�
/ / / spare / 1
I.
s„
\ ,I / , 1 ,,,
N
I I \ \ \ \\
GROUND STABILIZATION N ) \
SITE AREA STABILIZATION EXCEPTIONS I (� \� �� as6� �� �'
DESCRIPTION TIME FRAME \ \
PERIMETER 7 DAYS NONE 1 \1f
DIKES, SWALES, \ \\ \ \\\ \ \ \ `\ I I 11/1
\ \ \ \ I \\ I /
DITCHES & •
SLOPES V //
HIGH QUALITY 7 DAYS NONE /I
WATER ZONES \\ \ \ \ ) // ) i I \ I \ / / / I
HOW) //
SLOPES STEEPER 7 DAYS IF SLOPES ARE THAN 3d 10' DR LESS IN ��LENGTH AND ARE \ \ \\ I / / � \\ \ \ I /
NOT STEEPER / \ I / I I
( (
THAN WE 14 / \ / / \ \ \ I ' ( \ \\ \
DAYS ARE \
ALLOWED
SLOPES 3'1 DR 14 DAYS 7 DAYS FOR \ \
FLATTER SLOPES GREATER / \ / TtiTi
\ \ \ \
THAN 50' IN I
LENGTH / \ \ // ' \ ♦ \ \ALL OTHER 14 DAYS NONE (EXCEPT \ \ —�
AREAS WITH FOR PERIMETERS / / \ ( —� 11W\
\ \SLOPES FLATTER AND HQW ZONES) I \ \\ \ \ `THAN 4.1 / 1 \ \ \
DATE: E: I/ \ \ 1 \ \ \ N
Mry _� rvaa •
PAGE 1 of 2
+ Illlll vllllllllvlllllll 11 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION T❑TAL DISTURBED ACREAGE 0,74 ACRES
--`c LOT ER❑SI❑N CONTROL PLAN
General-All measures will be inspected and corrections made after mnoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be LOTS 1 - 3
rRsIVN eu11
relocated on the lotto insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing covet IN
s - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all RF T F C,T■ PINES
17.7 Objectionable materials spilled,washed,or tracked onto public roadways.WIRE FENCE I
+�+�1�L r-�+� + 11,L t✓
ouncWvas CLOTH FRONT VIEW Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure & FOR
� Y WIRE FENCE,
FILTE that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. CAV I N E S S CAT E S BUILDING
wnsrveosrorve _ FENCE STEEL L crone i5 nersve Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth
zsT� caourvo wr osouo cl"aourvo AND HARDWARE and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. AND DEVELOPMENT C O.
NOTES:
1.Hardware cloth and gravelshouMovedaythesilifenceatleastl2 SANDHILLS TOWNSHIP MOORE COUNTY
' _re� inches. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly. Any bare areas should be
8`l7�� 2.Stone outlets should be placed on low elevation areas of silt fence repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
and based on field conditions. SCALE: 1"=100' SEPTEMBER 2024
MAINTENANCE: Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed GRAPHIC SCALE
BURY WIRE FENCE AND B RV V OF UPPER EDGE OF 1.Per NCG-01,inspect outlet at lest once a week and after each 1 Inch or sediment shall be deposited within the project in such a waythat the sediment is not subject to erosion b wind or water.
HARDWARE CLOTH FILTER FABRIC IN-FRENCH greeter rainfall event.Complete any required repairs lmmedlately. p p t 1 y 100 0 50 100 200 Soo
2.Freshen stone when sediment accumulation exceeds 6 inches.
6.Keep mesh free of debris to provide adequate now. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take cam to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all
SECTION vi. 4.Remove sediment when half of stone outer is covered. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized.
5.Replace stone as needed to facilitate de-watering. ( IN FEET )
nc
SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.i115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106
LAST SAib23/2024 11.SieSAABL07 :r/2024 3:34 F9[®TTED EaYnn,s GilbeM,LENAM£.{STAFF\DENNIS\DENNIS WORK F/LES\PRO✓ECTS\EC NEW PRO✓ECT\EC—EMPTY GONE—BETHESDAP/NES\BETHESDAEC—LOTSI-3.OWG