HomeMy WebLinkAboutNCC243092_ESC Approval Submitted_20241009 FUQU4`(\/4R ! N4
north carotin°
Town of Fuquay-Varina Erosion Control Plan Approval Letter
4/3/2024
Calvary Baptist Church of Raleigh Inc.
7900 Ten Ten Road
Raleigh, NC 27603
Re: Calvary Baptist Temple Church Expansion Erosion Control Plan Approval
Erosion Control Number: EC-2024-07 Project Number:SP-2023-19
Disturbed Acreage:2.8 Plan Date/Revision Date:4/3/2024
Wake County PIN:0689877378 Lat/Long:35.665771/-78.701162
Plan Review Fee: $750.00 Paid Permit Fee: $750.00 Unpaid
To Whom it May Concern,
The Town of Fuquay-Varina Staff has approved the above-referenced erosion control plan. This approval is only
for erosion control and does not constitute approval of site improvements as defined in the Town of Fuquay-Varina
Land Development Ordinance. An approved erosion and sedimentation control plan is valid for one(1)calendar year
from the date of approval. If a land disturbance permit has not been obtained within the one(1)year period,the erosion
control and sedimentation plan approval becomes null and void.
By acceptance of these approved plans,the owner,owner's agents, heirs,successors and assigns,agree to be bound
to and comply with the Town of Fuquay-Varina's Code of Ordinances and the Town's Standard Specifications and
Construction Details as promulgated and amended by the Town.
The owner/developer or their representative must meet the following obligations as part of this approval:
• A pre-construction meeting is required prior to commencement of any construction. Approval of site
improvements is required prior to scheduling a pre-construction meeting. A fee sheet for required permit fees
will be provided with site improvement approval.
• Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to
completion of an approved compliance inspection.
• EC plan approval shall be prominently displayed until all construction is complete, all permanent
sedimentation and erosion control measures are installed, and the site has been stabilized. A copy of the
approved plan shall be kept on file at the job site.
• Agents,officials, or other qualified persons authorized by the Town, have the right to periodically inspect land
disturbing activities to ensure compliance and to determine whether the measures required in the plan are
effective in controlling erosion and sedimentation resulting from land disturbing activity.
Town of Fuquay-Varina E 134 N. Main Street, Fuquay-Varina, NC 27526 E (919)552-1400 E fuquay-varina.org
1
FUQU4`(\/4R ! N4
north carotin°
• As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice
of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the applicable annual permit fee. After the fee is processed,you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOl form and fee details may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future,the new responsible
party must obtain a new COC.
• Title 15A NCAC 4B.0118(a)and the NCG01 permit require that the following documentation be kept on file at
the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC,once it is received.
3. Records of inspections made during the previous 30 days.
The Town of Fuquay-Varina is not responsible for subject approvals of other Local, State or Federal Agencies. The
subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements,
Division of Water Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of
Engineers under Article 404/401 (Wetlands/Streams)jurisdiction/requirements, any provisions of the North Carolina
State Building Code or any structural design plans as conducted by the Fuquay-Varina Inspections Department,and/or
any Federal,State, County and Local municipal regulations or permit requirements. These permits and approvals are
separate from this approval and the owner, owner's agents, heirs, successors and assigns are responsible for
investigating the need,and obtaining these other permits if required.
Approval of these plans does not supersede, in any manner, the Town of Fuquay-Varina's Code of Ordinances or the
Town's Standard Specifications and Construction Details.All construction shall be implemented in accordance with
the Code of Ordinances and the Standard Specifications and Construction Details as now promulgated and as
hereafter amended by the Town of Fuquay-Varina. Any deviations from the Town's Code of Ordinances and Standard
Specifications and Construction Details shall be called to the attention of the Town before such deviations are
implemented.
To the extent these approved plans vary or conflict with the Town of Fuquay-Varina's Code of Ordinances and/or the
Town's Standard Specifications and Construction Details, said Code and Standard Specifications and Construction
Details shall control irrespective of approval of subject plans.The owner,owner agents,heirs,successors and assigns,
agree the Town shall not be responsible for any claims, damages, losses, costs, engineering fees, attorney's fees or
other professional fees whatsoever, incurred by the owner or the owner's agents occasioned by relying upon the
subject plans approved by the Town in the event that the subject plans are inconsistent or in conflict with the Town's
Code of Ordinances or the Town's Standard Specifications and Construction Details.
If you have any questions regarding this approval, please do not hesitate to contact me at(919)-567-3925.
Sincerely,
C15-
/
,.1-`me en s6o
Cody Simonson, El
Staff Engineer, Engineering Department
cc: Matt Poling, PE,CFM, Engineering Director
Town of Fuquay-Varina E 134 N. Main Street, Fuquay-Varina, NC 27526 E (919)552-1400 E fuquay-varina.org
2