HomeMy WebLinkAboutSW6240904_Plansheet - Grading/Drainage Plan_20241007 Docusign Envelope ID:4CF1 F6F3-DE58-4BD7-82EE-9DCC82BO9CA7
A CAR
�0
0
z
W
1723
44
W N SITE ss
1g 09F 16 33. .
RFLE< �.�
9/9'2024
U �O
O
W •0
b
GOON ACT W rn Q
QUO O,Q 3
VICINITY MAP J �ZN o
(NTS) ��� �o�
�S2/30N(1 m Q
�Td o
U �
T
C
O
n N
7
O
O
N
O
O
c
a�
:F
N N O CO
7 7 O
^O O 6 I 1 U c
MA09 0 O o
o-im O
O N
"_0 CO *it
�
a
�M
N Q) p N Q w v >
�� _
U I m m m TEMPORARY SKIMMER BASIN 1 W BAFFLES SHADED AREA m Q0 `°
u O (� E 0-^ D.A.=1.4 AC. 0 o
1= to o
TOTAL DRAINAGE AREA=5.9 AC. > � 00 N
' a
cn 0 Q10=(0.3)(7.21N/HR)(5.9AC.)=12.7CFS Z w } � m r o
I J p1 ❑ (D Lu
m a (z 101) 9 l 6—9 0 0 Z# d ID w VOL. REQ'D=1,800CF/AC=(1.4AC)=2520CF
Q w W O ^ SURFACE AREA REQ'D=325SF/CFS*(12.7CFS)=4128SFLn
Q 0 Z l 6 d `0 6 L 8 Q (2:1 SIDE SLOPES - 7 DAY STABILIZATION TIME FRAME TYP.) = Z Z [ V
x qj N � a s '.I(' `.I O u l w u 9A9}S �_ SURFACE AREA PROVE ED=4250SF Z � O Q � z Z a
I/ N VOL 0 WEIR WIDTHE6=7463CF O 0 cr 0
0 .V O v m SKIMMER ORIFICE DIAMETER=1.0 Q z > Z a Q Z Z Q
I-Il 3 Q) o DEWATERING TIME: 3.1 DAYS � Q o J
IN/ N O o w Lq NOTE:CLEAN BASIN WHEN 50% FULL DURING CONSTRUCTION. WHEN UPSTREAM AREAS �7 S �n Z o
z Q (n -� O � ARE STABLE AGAINST EROSION AND PERMISSION HAS BEEN OBTAINED FROM NCDEQ,INI N (0 IL c
0 Li — REMOVE TEMP. BASIN, INSTALL PERMANENT GRADES, AND SEED ALL DISTURBED AREAS a
O I k Q) O N W �� \ \ � N PER SEED SPECS.
c\j LE
NEW 2" BLOVSO Z Z CO /
O ROADSIDE DITCH X X O
NI (n SLOPES IN THIS AREA J O
} L I O MAY NEED TO BE ASSEMBLY �'_ �� 2
Q) X ROADSIDE SWALE 1 TEMP. SILT
_ W O REVISED (STEEPER) IN AC ENCE AS
I + O ORDER TO ALLEVIATE DA=Q10o 158CFS SHOWN s �� 1 195 4' \
N O - DISTURBANCE OF
'L + EXISTING TREE R xca S 0 1 ®2 3 5 4
(FIELD DETERM D - x
_ �x� 7nr��1C..- .*��v
TEMP. CONSTRt1CTI0N 0
ENTRANCE o o 2. 4k: :::: : ::::: :::: ::::::....:::...
0 0 0 o — 245.77 w
o — —
0 — — —� CD : ::
LO
J
NEW 12"X2" TAPPING I SK ~ 0
SLEEVE & VsASE r x Q /�
V
rn L�J L_L_J \ o
D p --�) D uLUIILL�G.F11�ldF�LL D D D `� / PERMANENT RIP RAP / I o
ROADSIDE DITCHES TO l ROADSIDE LE 2 /-
U / (� BE USED AS TEMP. I I tl 1 /
NEW 3 4° WATER \ DA=5.4 AC TRANSITION "T" r-
DIVERSION BERMS `\ IN ROADSIDE DITCH �_ L_ ZJ -� Q
I SERVICE & METER DURING CONSTRUCTION Q10=19.4 WIDE - 10 EACH
-Q N O TYP. AS SHOWN I �� X D ) o
:3 N l__ \ b D50=6" (.0
'___1DEPTH=18"
/ O TE SILT (INSTALL FILTER CL
F CE BENEATH RIP RAP) LO
(D N Q SH N I O \ M
I — LLJ
_ [ �]
! I > \ LL_ J
z
N I
Q
I 5� � o
/ M 00
x c 2 t)
Lu
w w
M
DRAINAGE AREA TO \ iL \ '�2 5 z V
�C.4\ � � �� SKIMMER BASIN Oz z
5.9 AC. �^ In LO I—I L'�Ic
3HO� I Q10=21.2CFS <9�� W i� 0' w
-3HO ,_ \ v
3H � z = m ❑
31p 3H 3H \ O ❑I I �3H�3H�3H 3H \ � �
I I 3H�3H�� \ J z ❑ a? w
INI \ �
INI 3H�3H Ud
/L LL Lij
W V 3H��3H � � �
iH 3H�3H J \ O 3H.,� .L 3H � ,� V .
3H O 3H� 3H 3H o
H 3H��3H� H� � � �I 3H�3H�3HO_�3H 3 3H..�3H
I3H 3 71u e 3H 311,L -❑ 00
I I O 3 ..�3H 3H 3H 3H O 3H�� —3HO L' '0 z
u�
3H 3H—3H N Q w
O 3H in 01
1 z
I / N � ~ � H"�3H�3H�3H�3H� � �
I I W s= I H 3H 3H 3H0�� LO
J
— _ L
I 1 � c mu
I I �Z6'26 3«92�Z� 0 N ao p o
- -
�
(` \ 0
N N �Z 1 O IDrI
00 W LLI O
VJ
l-V2 9P!IS ` l# od �" z /�W �_ N N
uOsug0F 991 P-J[)M C3-)CONSTRUCTION SEQUENCE �J O o a
— � � — � � - - - - - - - - - - - - - � � — SOIL TYPE DELINEATION 0-) m �
N uosuHor Inpd Hd9sor
1) INSTALL THE TEMPORARY CONSTRUCTION ENTRANCE. ��
> > > > > TEMPORARY DIVERSION BERM (TDB 2) INSTALL EROSION CONTROL MEASURES AS SHOWN ON Q) I z CD
Q (7 DAY STABILIZATION TIME FRAME PLANS. (f) w w o
O —•—•—•—•- -•—•—•— TEMPORARY SILT FENCE (TSF) 3) COMPLETE INSTALLATION OF SITE DRAINAGE NETWORKS T— I a z W
(�J cl
LIMITS OF DISTURBED AREA AND SITE SWALES WITH ASSOCIATED EROSION CONTROL o
TOTAL DISTURBED AREA=1.5 ACRES PROTECTION BEFORE BEGINNING SITE GRADING. I Q O
too o
4) STRIP TOPSOIL. r 1 O
— — — — — — — — — — _ EXISTING CONTOUR 5) GRADE SITE. `J
10o FINISH GRADE CONTOUR 6) GRASS AREAS THAT WILL NOT BE DISTURBED. I =
7 INSTALL UTILITIES. V
SKIMMER BASIN DRAINAGE AREA 7) PLACE BASE-COURSE. LLJ o
— — — — — — — —a® TEMP. ROCK CHECK DAM (TRCD) 8) SEED AND MULCH ALL AREAS TO PROVIDE PERMANENT I Z — DC
J ROADSIDE DITCH DRAINAGE AREAS GROUNDCOVER WITHIN 7 OR 14 WORKING DAYS FOLLOWING (y Q -o Q
COMPLETION OF ANY PHASE OF GRADING, AND WITHIN 90 z
n CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION 00I GRAPHIC SCALE -
HIGH I NOTE: ADDITIONAL EROSION CONTROL PLANS OR DEVELOPMENT. e— O Q Li
9 MAINTAIN ALL TEMPORARY MEASURES UNTIL Of Q E
so 0 25 so 100 200
&APPROVALS WILL BE REQUIRED FOR PERMANENT GROUND COVER IS ESTABLISHED. � II----�� w r r-1 Ln J
INDIVIDUAL LOTS PRIOR TO LOT DISTURBANCE 10) NO SEDIMENT OR EROSION CONTROL MEASURES ARE _j < _0
TO BE REMOVED WITHOUT THE APPROVAL OF AN NCDEQ z J
INSPECTOR. ~
( T>\ FTTT j v
1 inch 50 fl. w zz
z >