Loading...
HomeMy WebLinkAboutSW6200502_Stormwater Narrative_20241003 • • s � 5410 Trinity Road P 919.866.4516 • • Suite 102 F 919.859.5663 T I M M O N S GROUP Raleigh, NC 27607 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. August 12, 2024 NC Dept of Enviro. Quality Raleigh Regional Office Attn: Brianna Holland 512 N. Salisbury Street Office 625 Y Raleigh, NC 27604 Subject: Stormwater Narrative and Construction Sequence Project Name: Winder Station at Vass (SW6200502)— Major Modification County: Moore City: Vass Dear Ms. Holland, The proposed 72 lot single family subdivision, Winder Station at Vass, will be constructed as one project with (3) three proposed Wet Pond SCM. The site is zoned R-1 and will be served by public water and sanitary sewer systems. SCM #1, #2, and #3 will be constructed to reduce the pre- to post-development peak flows conditions for the 10-, 25-year, 24-hour storm event of the proposed development. Additionally, this project will propose an 85% Total Suspend Solids removal and will treat the required Water Quality Volume per NCDEQ requirements. A pre-development and post-development hydrologic analysis was completed for the site using the NRCS (SCS) method. A hydraulic analysis was completed using Hydraflow modeling software to route the 1, 2, and 10 year storm events through the proposed detention and outlet structures. This Major Modification to SW6200502 proposes 2 additional lots (north of existing lot 60) and open space will be constructed as one project and will drain to SCM 3. The increase in BUA was analyzed as part on the stormwater impact analysis and SCM 3 was found to still be adequate to handle the increase. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES