Loading...
HomeMy WebLinkAboutSW4240902_Soils/Geotechnical Report_20241004 ' ail I I., ,+��f..iT' *'7r+ if ' :4; ,fi. .. ft_ \i''\ ..14 . i .01-1 - ;•• • .;,..:. .._ --- - . --- - - . . A 0,, —A"-- 'v .- ECS Southeast, LLP Geotechnical Engineering Report Hege Road Site 765 Hege Road Lexington, North Carolina ECS Project Number 09:28353 July 16, 2018 I I I I I I E CS SOUTH EAST, "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities July 16,2018 Mr. Buddy Lyons LeoTerra Development, Inc. 3608 West Friendly Avenue Suite 202 Greensboro, NC 27410 ECS Project No.09:28356 Reference: Geotechnical Engineering Report Hege Road Site 765 Hege Road Lexington,Davidson County, North Carolina Dear Mr.Lyons: ECS Southeast, LLP (ECS) has completed the subsurface exploration, laboratory testing, and geotechnical engineering analyses for the above-referenced project. Our services were performed in general accordance with our Proposal No. 09:26120, dated May 31, 2018. This report presents our understanding of the geotechnical aspects of the project, the results of the field exploration and laboratory testing conducted, and our geotechnical design and construction recommendations for the project. ECS appreciates the opportunity to be of service to you during this phase of the project. If you or any members of the project team have any questions or comments after reviewing this report, please contact us. We welcome the opportunity to assist with the project through its design and construction phases. Respectfully submitted, EG55otttheast, UP ��,��ltCaRp°,. :�d F S5 o-•`iti 47S SEAL 19331 7aot °. %C fitiGfNEE¢' 2- P oann'VallabManager Parer m Schiipal pnorelt,P. E. 04,44 4, 4 SCH eNe ject DVallabhaneniPecslimitedcom tschipporeit@ecslim!ted.com 4511 Koger tsivo.,breensooro,rvL. 4U1 • T:33b.856.7150 • F:336.856.7160 • ecslimited,com EC5 Capitol Services,PLLC • ECS Florida,LLC • ECS Mid-Atlantic,LLC • ECS Midwest,LLC • ECS Southeast,LLP • ECS Southwest,LIP Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 1 TABLE OF CONTENTS EXECUTIVE SUMMARY 2 1.0 INTRODUCTION 3 1.1 General 3 1.2 Scope of Services 3 1.3 Authorization 3 2.0 PROJECT INFORMATION 4 2.1 Project Location 4 2.2 Past Site History/Current Slte conditions 4 2.3 Proposed Construction 4 3.0 FIELD EXPLORATION 5 3.1 Field Exploration Program 5 4.0 LABORATORY SERVICES 5 4.0 SUBSURFACE CONDITIONS 6 4.1 Regional/Site Geology 6 4.2 Subsurface Characterization 6 4.3 Groundwater Observations 7 5.0 DESIGN RECOMMENDATIONS 8 5.1 Building Design 8 5.1.1 Foundations 8 5.1.2 Floor Slabs 9 6.0 SITE CONSTRUCTION RECOMMENDATIONS 10 6.1 Subgrade Preparation 10 6.1.1 Stripping and Razing 10 6.1.2 Proofrolling 10 6.2 Earthwork Operations 10 6.2.1 Excavation Considerations 10 6.2.2 Structural Fill Materials 11 6.2.4 Compaction 12 6.3 Foundation and Slab Observations 13 6.5 General Construction Considerations 14 7.0 CLOSING 16 APPENDICES Appendix A—Drawings&Reports Site Location Map Boring Location Diagram Appendix B—Field Operations Reference Notes for Boring Logs Boring Logs Appendix C—Laboratory Test Summary Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 2 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering study for the planned single-family residential development in Lexington, Davidson County, North Carolina. • All borings encountered a surface layer of topsoil with an approximate thickness of 2- to 3-inches. Beneath the topsoil at Boring B-10, fill material consisting of SAND (SP) was encountered to a depth of approximately 3 feet below the ground surface. Below the fill material, very week residual material with N value of Weight of Hammer (WOH) was encountered till a depth of approximately 6 feet. Below the topsoil and fill materials, residual materials were encountered to boring termination to depths ranging from about 20 to 25 feet.The residual material consisted of SILTS(ML), ELASTIC SILTS(MH), Silty SAND (SM), and Clayey SAND (SC). The cohesive soils (ML) and (MH) had consistencies of soft to stiff and the cohesionless soils (SM) had consistencies of very loose to medium dense. A lower N value of 4 was encountered in the upper 3 feet at Borings B-15 and B-16, this suggests that isolated softer pockets exist at this site. • Groundwater was encountered at borings B-15 and B-16 at depths of 10.5 feet and 7 feet, respectively. • The proposed residential buildings can be supported on conventional shallow foundations bearing on low plasticity undisturbed residual soils or engineered fill with a net allowable bearing pressure of 2,000 psf provided the recommendations discussed in this report are implemented. Some undercutting of localized very soft to soft or very loose soils may be required. Specific information regarding the subsurface exploration procedures, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report but should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Furthermore, ECS should review our findings and recommendations in their entirety once the final project criteria have been established. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 3 1.0 INTRODUCTION 1.1 GENERAL The project site is located at 765 Hege Road in Lexington, North Carolina. We understand the property is currently used as agricultural land and is mostly open farm fields. Development plans have not been finalized. We assume the project will consist of the development of a single-family residential subdivision. 1.2 SCOPE OF SERVICES To obtain the necessary geotechnical information required for design of the proposed buildings and pavements, ECS performed twenty two (22) soil borings at locations. A laboratory-testing program was also implemented to characterize the physical and engineering properties of the subsurface soils. 1.3 AUTHORIZATION Our services were provided in accordance with our Proposal No. 09:26120 dated May 31, 2018 and includes the Terms and Conditions of Service outlined with our Proposal. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 4 2.0 PROJECT INFORMATION 2.1 PROJECT LOCATION The site is located at 765 Hege Road in Lexington, North Carolina included in Figure 1 in the Appendix.The property is further identified by the Davidson County Online GIS Database as Parcel Identification Number 6821-03-20-3882 (180.25 acres). The overall project site comprises two parcels that are separated by Hege Road. 2.2 PAST SITE HISTORY/CURRENT SITE CONDITIONS We understand the property is currently used as agricultural land and is mostly open farm fields. There is a two-story wood-framed residential structure and several outbuildings (barns, sheds, silos, etc.) on the site. Site features generally consist of rolling topography that slopes downward from the north and southeast to a central creek and two ponds that bisect the central portion of the site from northeast to southwest. For the western parcel, the topography generally ranges from Elevation 830 feet in the north down to Elevation 730 feet in the south. For the eastern parcel, the topography generally ranges from Elevation 840 feet in the north down Elevation 800 feet in the south 2.3 PROPOSED CONSTRUCTION Development plans have not been finalized. We assume the project will consist of the development of a single-family residential subdivision. We assume the proposed buildings will be up to 2-story, wood-framed structures with slabs-on-grade. Design foundation loads have not been provided to us, but we assume they will be relatively light (column loads up to 50 kips and wall loads up to 2 kips per foot). Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page S 3.0 FIELD EXPLORATION 3.1 FIELD EXPLORATION PROGRAM The field exploration was planned with the objective of characterizing the project site in general geotechnical and geological terms and to evaluate subsequent field and laboratory data to assist in the determination of geotechnical recommendations. The subsurface conditions were explored by drilling twenty two (22) soil borings. A truck-mounted Mobile B-57 drill rig was utilized to drill the soil borings. Borings were advanced to depths of approximately 20 to 25 feet below the current ground surface. Boring locations were identified in the field by ECS personnel using existing landmarks as reference prior to mobilization of our drilling equipment. The approximate as-drilled boring locations are shown on the Boring Location Plan in Appendix A. Standard penetration tests (SPTs) were conducted in the borings at regular intervals in general accordance with ASTM D 1586. Small representative samples were obtained during these tests and were used to classify the soils encountered. The standard penetration resistances obtained provide a general indication of soil shear strength and compressibility. 4.0 LABORATORY SERVICES The laboratory testing performed by ECS for this project consisted of selected tests performed on samples obtained during our field exploration operations.The following paragraphs briefly discuss the results of the completed laboratory testing program. Classification and index property tests were performed on representative soil samples obtained from the test borings in order to aid in classifying soils according to the Unified Soil Classification System and to quantify and correlate engineering properties. A geotechnical staff professional visually classified each soil sample from the test borings on the basis of texture and plasticity in accordance with the Unified Soil Classification System (USCS) and ASTM D-2488 (Description and Identification of Soils-Visual/Manual Procedures). After classification, the staff professional then grouped the various soil types into the major zones noted on the boring logs in Appendix B. The group symbols for each soil type are indicated in parentheses following the soil descriptions on the boring logs. The stratification lines designating the interfaces between earth materials on the boring logs are approximate; in situ, the transitions may be gradual. In addition to visual classification, ECS performed four natural moisture content tests, four Atterberg limit tests, and four percent passing number 200 sieve tests. The laboratory testing was performed in general accordance with the applicable ASTM standards. The results of the laboratory testing are presented on the respective Boring Logs. At the time of this report the (2) two standard proctor tests and (2) two CBR tests have not been performed. An addendum report with the test results and recommendations if needed will be sent at a later date. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 6 4.0 SUBSURFACE CONDITIONS 4.1 REGIONAL/SITE GEOLOGY The site is located in the Piedmont Physiographic Province of North Carolina. The native soils in the Piedmont Province consist mainly of residuum with underlying saprolites weathered from the parent bedrock, which can be found in both weathered and unweathered states. Although the surficial materials normally retain the structure of the original parent bedrock, they typically have a much lower density and exhibit strengths and other engineering properties typical of soil. In a mature weathering profile of the Piedmont Province, the soils are generally found to be finer grained at the surface where more extensive weathering has occurred. The particle size of the soils generally becomes more granular with increasing depth and gradually changes first to weathered and finally to unweathered parent bedrock. The mineral composition of the parent rock and the environment in which weathering occurs largely control the resulting soil's engineering characteristics. The residual soils are the product of the weathering of the parent bedrock. The Geologic Map of North Carolina indicates that the site is underlain by Metamorphosed Granite Rock-foliated to massive rock of the Cambrian/Late Proterozoic age. In the vicinity of Borings B-10, it was apparent that the natural geology within the site has been modified in the past by grading that included the placement of possible fill materials. The quality of man-made fills can vary significantly, and it is often difficult to assess the engineering properties of existing fills. Furthermore, there is no specific correlation between N-values from standard penetration tests performed in soil test borings and the degree of compaction of existing fill soils; however, a qualitative assessment of existing fills can sometimes be made based on the N-values obtained and observations of the materials sampled in the test borings. 4.2 SUBSURFACE CHARACTERIZATION The subsurface conditions at the site, as indicated by the borings, generally consisted of natural soils to the depths explored. The generalized subsurface conditions are described below. For soil stratification at a particular test location, the respective boring log found in the Appendix should be reviewed. Topsoil was encountered at the ground surface in the borings to a depth of 2 to 3 inches. The surficial material depths provided in this report and on the individual boring logs are based on driller observations and should be considered approximate. The natural soil encountered below the surficial materials generally consisted of Silty SAND (SM) and CLAYEY SAND (SC) exhibiting SPT N-values ranging from 2 to 30 blows per foot (bpf) indicating a relative density varying between very loose to medium dense. These soils were typically loose with N-values between 5 and 10, and extended to the typical boring termination depth of 20 feet. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 7 Some variations to this typical subsurface profile were encountered. Boring B-10 encountered existing fill to a depth of 3 feet, which classified as SAND (SP) with an N-value of 6 bpf. Very loose alluvial Silty SAND (SM) was encountered in B-10 below the fill to a depth of 6 feet. Boring B-22 encountered stiff ELASTIC SILT(MH) and soft to firm Sandy SILT(ML) below a depth of 6 feet. 4.3 GROUNDWATER OBSERVATIONS Groundwater measurements were attempted at the termination of drilling and prior to demobilization from the site. Groundwater was encountered at the boring locations B-15 and B- 16 at depths of 10.5 feet and 7 feet, respectively. Cave-in depths observed in the borings ranged from approximately 11 to 15.8 feet. Cave-in of a soil boring can be caused by groundwater hydrostatic pressure, weak soil layers, and/or drilling activities (i.e. drilling fluid circulation or advancement of bit). Fluctuations in the groundwater elevation should be expected depending on precipitation, run- off, utility leaks, and other factors not evident at the time of our evaluation. Normally, highest groundwater levels occur in late winter and spring and the lowest levels occur in late summer and fall. Depending on time of construction, groundwater may be encountered at shallower depths and locations not explored during this study. If encountered during construction, engineering personnel from our office should be notified immediately. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 8 5.0 DESIGN RECOMMENDATIONS 5.1 BUILDING DESIGN The following sections provide recommendations for foundation design and soil supported slabs. 5.1.1 Foundations Provided subgrades and structural fills are prepared as discussed herein, the proposed structures can be supported by conventional shallow foundations. The design of the foundation shall utilize the following parameters: Foundation Design Design Parameter Commercial Structure Net Allowable Bearing Pressure' 2,000 psf Acceptable Bearing Soil Material Low Plasticity Soils(SC,SM, ML). Firm and stable undisturbed or properly compacted structural fill. Minimum Footing Width 24 inches(Isolated Spread Footings) 18 inches(Continuous Footings) Minimum Footing Embedment Depth (below slab or finished grade) 18 inches Estimated Total Settlement Less than 1 inch Estimated Differential Settlement Less than%inch 1. Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation. A grading plans has not been provided at this time. We recommend a low plasticity fill material to reach planned grades, as discussed in the following sections Residual high plasticity soils consisting of ELASTIC SILT (MH) were encountered at Boring B-22 at approximate depths ranging from 6 to 8 feet. ECS does not recommend foundations bearing on these soils without some form of remediation (See Section 6.3). High plasticity residual soils encountered within proposed structural areas should be undercut and replaced with low plasticity engineered fill to a minimum depth of 2 feet below the planned foundation bottom subgrade. Fill materials were encountered in the upper 3 feet of Boring B-10. In regard to the existing fill materials, they could be encountered in areas between our borings. If encountered within a building footprint, there is a risk of excessive and/or non-uniform settlement caused by extensive zones or pockets of soft, loose, or uncompacted material not disclosed by our borings. The risk could be reduced with documentation supporting acceptable fill placement methods and compaction. However in the absence of this documentation, we recommend that where existing fill soils are encountered in foundation excavations, these soils should be excavated and replaced with low plasticity soils (or other approved backfill material) or the foundations should extend through these fill soils to the depth of residual soils. Very loose, weak, compressible alluvial soils with an N value of Weight of Hammer (WOH) were encountered in B-10 from depths ranging from 3 to 6 feet. ECS does not recommend foundations bearing on these soils without some form of remediation (See Section 6.3). These very loose, weak, compressible soils encountered within proposed structural areas should be undercut and Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 9 replaced with low plasticity engineered fill to a minimum depth of 2 feet below the planned foundation bottom subgrade. We recommend upon addressing these foundation concerns, the site soils should be suitable for the proposed structure and recommended bearing pressure. 5.1.2 Floor Slabs As previously mentioned in the foundation section, Boring B-10 encountered fill materials in the upper 3 feet and alluvial soil ranging from 3 to 6 feet. Fill could be present between our borings. If fill materials are present within a building footprint, there is a risk of excessive and/or non- uniform settlement caused by extensive zones or pockets of soft, loose, or uncompacted material. The risk could be reduced with documentation supporting acceptable fill placement methods and compaction. However in the absence of this documentation, we recommend that where existing undocumented fill soils are encountered at floor slab subgrades, these soils should be excavated and replaced with low plasticity soils. Existing fill soils without deleterious materials may be moisture conditioned and reused as new fill materials. Residual high plasticity soils consisting of ELASTIC SILT (MH) were encountered at Boring B-22 at approximate depths ranging from 6 to 8 feet. ECS does not recommend floor slabs bearing on these soils without some form of remediation (See Section 6.3). High plasticity residual soils encountered within proposed structural areas should be undercut and replaced with low plasticity engineered fill to a minimum depth of 2 feet below the planned foundation bottom subgrade. The on-site low plasticity residual soils are considered suitable for support of the floor slabs, although moisture control during earthwork operations, including the use of discing or appropriate drying equipment, may be necessary. This material is likely suitable for the support of a slab-on-grade, however, there may be areas of soft or yielding soils that should be removed and replaced with compacted structural fill in accordance with the recommendations included in this report. The following graphic depicts our soil-supported slab recommendations: Vapor Barrier Concrete Slab 0000 0o0 00 0000 000 0 00 0 0 0 o °o 0 00 ° o 0 ° ° o o O o ° 0 0 0 o Granular Capillary Break/Drainage Layer V Compacted Subgrade Figure 5.1.2.1 1. Drainage Layer Thickness: 4 inches 2. Drainage Layer Material: GRAVEL(GP,GW),SAND(SP,SW) 3. Subgrade compacted to 95%maximum dry density per ASTM D698,upper foot compacted to 98%. Subgrade Modulus: Provided the placement of Structural Fill and Granular Drainage Layer per the recommendations discussed herein, the slab may be designed assuming a modulus of subgrade Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 10 reaction, kl of 100 pci (lbs/cu. inch). The modulus of subgrade reaction value is based on a 1 ft by 1 ft plate load test basis. Slab Isolation: Ground-supported slabs should be isolated from the foundations and foundation- supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration prevents the use of a free-floating slab, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab. 6.0 SITE CONSTRUCTION RECOMMENDATIONS 6.1 SUBGRADE PREPARATION 6.1.1 Stripping and Razing The subgrade preparation should consist of stripping vegetation, topsoil, and other soft or unsuitable materials from the 10-foot expanded buildings and 5-foot expanded pavement limits and to 5 feet beyond the toe of structural fills. Borings generally encountered topsoil across the site. ECS should be called on to document that unsuitable surficial materials have been removed prior to the placement of Structural Fill. 6.1.2 Proofrolling After removing unsuitable materials, cutting to the proposed grade, and prior to the placement of structural fill or other construction materials, the exposed subgrade should be observed by the ECS personnel. The exposed subgrade should be proofrolled with previously approved construction equipment having a minimum axle load of 10 tons (e.g. fully loaded tandem-axle dump truck). The areas subject to proofrolling should be traversed by the equipment in two perpendicular (orthogonal) directions with overlapping passes of the vehicle under the observation of ECS personnel. This procedure is intended to assist in identifying localized yielding materials. In the event that unstable or "pumping" subgrade is identified by the proofrolling, those areas should be marked for repair prior to the placement of subsequent structural fill or other construction materials. Methods of repair of unstable subgrade, such as undercutting or moisture conditioning or chemical stabilization, should be discussed with ECS to determine the appropriate procedure with regard to the existing conditions causing the instability. A test pit(s) may be excavated to explore the shallow subsurface materials in the area of the instability to help in determined the cause of the observed unstable materials and to assist in the evaluation of the appropriate remedial action to stabilize the subgrade. 6.2 EARTHWORK OPERATIONS 6.2.1 Excavation Considerations Excavation Safety: Excavations and slopes should be made and maintained in accordance with OSHA excavation safety standards. The contractor is solely responsible for designing and constructing stable, temporary excavations and slopes and should shore, slope, or bench the sides of the excavations and slopes as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 11 soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. Construction Dewatering: Based on the borings, our experience with groundwater fluctuations on similar sites, and anticipated grades, most of the temporary excavations are unlikely to encounter groundwater. However, the contractor should be prepared to remove any precipitation or groundwater that may seep into temporary construction excavations using open pumping. Open pumping utilizes submersible sump pumps in pits or trenches dug below the bottom of the excavation and backfilled with No. 57 stone. Excavatibility: Based on the assumed excavations depths for mass grading, footings and utilities, we anticipate that the majority of the materials to be excavated will be residual soils, which can be removed with conventional earth excavation equipment such as track-mounted backhoes, loaders, or bulldozers. As noted in the Regional/Site Geology section of this report, however, the weathering process in the Piedmont can be erratic and significant variations of the depths of the more dense materials can occur in relatively short distances. In some cases, isolated boulders or thin rock seams may be present in the soil matrix. 6.2.2 Structural Fill Materials Product Submittals: Prior to placement of Structural Fill, representative bulk samples (about 50 pounds) of on-site and off-site borrow should be submitted to ECS for laboratory testing, which will include Atterberg limits, natural moisture content, grain-size distribution, and moisture- density relationships for compaction. Import materials should be tested prior to being hauled to the site to determine if they meet project specifications. Satisfactory Structural Fill Materials: Materials satisfactory for use as Structural Fill should consist of inorganic soils classified as CL, ML, SM, SC, SW, SP, GW, GP, GM and GC, or a combination of these group symbols, per ASTM D 2487. The materials should be free of organic matter, debris, and should contain no particle sizes greater than 4 inches in the largest dimension. Open graded materials, such as Gravels (GW and GP), which contain void space in their mass should not be used in structural fills unless properly encapsulated with filter fabric. Suitable Structural Fill material should have the index properties shown in the following table: Structural Fill Index Properties Location LL PI Building Areas 50 max 30 max Pavement Areas 50 max 30 max Unsatisfactory Materials: Unsatisfactory fill materials include materials which do not satisfy the requirements for suitable materials, as well as topsoil and organic materials (OH, OL), Elastic Silt (MH) (with a PI greater than 30), and high plasticity Clay (CH). The owner can consider allowing Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 12 soils with a maximum Liquid Limit of 65 and Plasticity Index of 30 to be used as Structural Fill at depths greater than 4 feet below pavement subgrades outside the expanded structural limits and within non-structural areas. 6.2.4 Compaction Structural Fill Compaction: Structural Fill within the building footprints, pavement, and embankment limits should be placed in maximum 8-inch loose lifts, moisture conditioned as necessary to within -2 and +3 % of the soil's optimum moisture content, and be compacted with suitable equipment to a dry density of at least 95 percent of the Standard Proctor maximum dry density (ASTM D698) except within 12 inches of finished soil subgrade elevation beneath slab-on- grade and pavements. Within the top 12 inches of finished soil subgrade elevation beneath slab on grade and pavements, the approved project fill should be compacted to at least 98 percent of its standard Proctor maximum dry density. ECS should be called on to document that proper fill compaction has been achieved. Fill Compaction Control: The expanded limits of the proposed construction areas should be well defined, including the limits of the fill zones for buildings, pavements, and slopes, etc., at the time of fill placement. Grade controls should be maintained throughout the filling operations. Filling operations should be observed on a full-time basis by ECS personnel to document that the minimum compaction requirements are being achieved. Field density testing of fills should be performed at the frequencies shown below, but not less than 1 test per lift. Frequency of Compaction Tests in Fill Areas Location Frequency of Tests Expanded Building Limits 1 test per 2,500 sq.ft. per lift Pavement Areas 1 test per 10,000 sq.ft. per lift Utility Trenches 1 test per 200 linear ft. per lift Outparcels/SWM Facilities 1 test per 5,000 sq.ft. per lift All Other Non-Critical Areas 1 test per 10,000 sq.ft. per lift Compaction Equipment: Compaction equipment suitable to the soil type being compacted should be used to compact the subgrades and fill materials. Sheepsfoot compaction equipment should be suitable for the fine-grained soils (Clays and Silts). A vibratory steel drum roller should be used for compaction of coarse-grained soils (Sands) as well as for sealing compacted surfaces. Fill Placement Considerations: Fill materials should not be placed on frozen soils, on frost-heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and all frozen or frost-heaved soils should be removed prior to placement of Structural Fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned. At the end of each work day, fill areas should be graded to facilitate drainage of precipitation and the surface should be sealed by use of a smooth-drum roller to limit infiltration of surface water. During placement and compaction of new fill at the beginning of each workday, the Contractor may Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 13 need to scarify existing subgrades to a depth on the order of 4 inches so that a weak plane will not be formed between the new fill and the existing subgrade soils. Drying and compaction of wet soils is typically difficult during the cold, winter months. Accordingly, earthwork should be performed during the warmer, drier times of the year, if practical. Proper drainage should be maintained during the earthwork phases of construction to prevent ponding of water which has a tendency to degrade subgrade soils. Alternatively, if these soils cannot be stabilized by conventional methods as previously discussed, additional modifications to the subgrade soils such as lime or cement stabilization may be utilized to adjust the moisture content. If lime or cement are utilized to control moisture contents and/or for stabilization, Quick Lime, Calciment® or regular Type 1 cement can be used. The construction testing laboratory should evaluate proposed lime or cement soil modification procedures, such as quantity of additive and mixing and curing procedures, before implementation. The contractor should be required to minimize dusting or implement dust control measures, as required. Where fill materials will be placed to widen existing embankment fills, or placed up against sloping ground, the soil subgrade should be scarified and the new fill benched or keyed into the existing material. Fill material should be placed in horizontal lifts. In confined areas such as utility trenches, portable compaction equipment and thin lifts of 3 inches to 4 inches may be required to achieve specified degrees of compaction. We recommend that the grading contractor have equipment on site during earthwork for both drying and wetting fill soils. We do not anticipate significant problems in controlling moisture within the fill during dry weather, but moisture control may be difficult during winter months or extended periods of rain. The control of moisture content of higher plasticity soils is difficult when these soils become wet. Further, such soils are easily degraded by construction traffic when the moisture content is elevated. 6.3 FOUNDATION AND SLAB OBSERVATIONS Protection of Foundation Excavations: Exposure to the environment may weaken the soils at the footing bearing level if the foundation excavations remain open for too long a time. Therefore, foundation concrete should be placed the same day that excavations are made. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if rainfall becomes imminent while the bearing soils are exposed, a 1 to 3-inch thick "mud mat" of "lean" concrete should be placed on the bearing soils before the placement of reinforcing steel. Footing Subgrade Observations: Most of the soils at the foundation bearing elevation are anticipated to be suitable for support of the proposed structure. The high plasticity residual soils encountered at Boring B-2 within the proposed structural area should be undercut and replaced with low plasticity engineered fill to a minimum depth of 2 feet below the planned foundation bottom subgrade. It will be important to have ECS observe the foundation subgrade prior to placing foundation concrete, to document that the bearing soils are what was anticipated. If soft or unsuitable soils are observed at the footing bearing elevations, the unsuitable soils should be undercut and removed. The undercut zone should be backfilled with lean concrete (f'c> 1,000 psi Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 14 at 28 days) up to the original design bottom of footing elevation; the original footing shall be constructed on top of the hardened lean concrete. Slab Subgrade Verification: ECS personnel should be called on to observe exposed subgrades within the expanded building limits prior to Structural Fill Placement to document that adequate subgrade preparation has been achieved. A proofrolling using a drum roller or loaded dump truck should be performed in their presence at that time. Once subgrades have been prepared to the satisfaction of ECS, subgrades should be properly compacted and new Structural Fill can be placed. Existing subgrades to a depth of at least 10 inches and Structural Fill should be moisture conditioned to within -2/+3 percentage points of optimum moisture content then be compacted to the required density. If there will be a significant time lag between the site grading work and final grading of concrete slab areas prior to the placement of the subbase stone and concrete, ECS personnel should be called on to document the condition of the prepared subgrade. Prior to final slab construction, the subgrade may require scarification, moisture conditioning, and re- compaction to restore stable conditions. 6.5 GENERAL CONSTRUCTION CONSIDERATIONS Moisture Conditioning: During the cooler and wetter periods of the year, delays and additional costs should be anticipated. At these times, reduction of soil moisture may need to be accomplished by a combination of mechanical manipulation and the use of chemical additives, such as lime or cement, in order to lower moisture contents to levels appropriate for compaction. Alternatively, during the drier times of the year, such as the summer months, moisture may need to be added to the soil to provide adequate moisture for successful compaction according to the project requirements. Subgrade Protection: Measures should also be taken to limit site disturbance, especially from rubber-tired heavy construction equipment, and to control and remove surface water from development areas, including structural and pavement areas. It would be advisable to designate a haul road and construction staging area to limit the areas of disturbance and to prevent construction traffic from excessively degrading sensitive subgrade soils and existing pavement areas. Haul roads and construction staging areas could be covered with excess depths of aggregate to protect those subgrades. The aggregate can later be removed and used in pavement areas. Surface Drainage: Surface drainage conditions should be properly maintained. Surface water should be directed away from the construction area, and the work area should be sloped away from the construction area at a gradient of 1 percent or greater to reduce the potential of ponding water and the subsequent saturation of the surface soils. At the end of each work day, the subgrade soils should be sealed by rolling the surface with a smooth drum roller to minimize infiltration of surface water. Excavation Safety: Cuts or excavations associated with utility excavations may require forming or bracing, slope flattening, or other physical measures to control sloughing and/or prevent slope failures. Contractors should be familiar with applicable OSHA codes to ensure that adequate protection of the excavations and trench walls is provided. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 15 Erosion Control: The surface soils may be erodible. Therefore, the Contractor should provide and maintain good site drainage during earthwork operations to maintain the integrity of the surface soils. Erosion and sedimentation controls should be in accordance with sound engineering practices and local requirements. Hege Road-Greensboro July 16,2018 ECS Project No.09:28353 Page 16 7.0 CLOSING ECS has prepared this report of findings, evaluations, and recommendations to guide geotechnical-related design and construction aspects of the project. The description of the proposed project is based on information provided to ECS. If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately in order that we can review the report in light of the changes and provide additional or alternate recommendations as may be required to reflect the proposed construction. We recommend that ECS be allowed to review the project's plans and specifications pertaining to our work so that we may ascertain consistency of those plans/specifications with the intent of the geotechnical report. Field observations, monitoring, and quality assurance testing during earthwork and foundation installation are an extension of and integral to the geotechnical design recommendation. We recommend that the owner retain these quality assurance services and that ECS be allowed to continue our involvement throughout these critical phases of construction to provide general consultation as issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report. APPENDIX A— Drawings & Reports Site Location Map Boring Location Diagram r ... r / .1 's/• `_ 6 �;_,, �1 ,5 4• a i / i. '211;i. , _ v • *,`'-4 'w a q t� Lmin ray e SITE `°S * ..i.. bra4 ' .* 0*(:( ,e e 1. -, , I./ K ��cf`� _v.4 ti Cash For Junk Cars ip r i \11 i `' P�Q� ,'.. �' `� rl. 111����� , Greenbrier 0 _t • �fl �h C Or A♦I.- r p Ar k o feg 0 • • t ,r� F 3 y. `` 1 —t. ., - - - e9e'Rd _ _ } Asrwri d! t N 8 I I FIGURE 1 SCALE 1" =700' REFERENCE: SITE LOCATION MAP 2018 DigitalGlobe, GeoEye, 350 700 U.S. Geological Survey, I I 765 HEGE ROAD U.S.D.A. Farm Service Agency, LEXINGTON, NORTH CAROLINA I 2018 Google 700 0 I I DRAWN BY/DATE PROJECT NO. HME/07-06-18 09-28353 - • f' # Olt'i 1. '' 6 t:11 i AI/., ' r ►r - -: • . 1I 1 B-1 B-2 B-3 '`-``" ' 1 O O O B-4 y 4 i O ' B-17 O B-5 O B_6 B-7' O •- ,,� ,- B-18 O B-9 B-19 B-8 O B-10 ,��_ O O O ik • 41k4':. B-11 B-12 i 44 Cash F. O O ' 8-13 1 .' `k '` .1' 4y B-14 64& -- O �, ,. Y' ; ./ B-21 B-15 O ' , . , 1.. .._ , .,‘ 4 B-16 B 22 SCALE (IN FEET) 2„ 500 5(l`-' 500 ' 6 � Googly REFERENCE: I FIGURE 2 2018 DigitalGlobe, GeoEye, I BORING LOCATION PLAN U.S. Geological Survey, I I HEGE ROAD U.S.D.A. Farm Service Agency, LEXINGTON,NORTH CAROLINA 2018 Google I I ECS PROJECT 09.28353 APPENDIX B — Field Operations Reference Notes for Boring Logs Boring Logs �.. REFERENCE NOTES FOR BORING LOGS MATERIAL1'2 DRILLING SAMPLING SYMBOLS&ABBREVIATIONS MI ASPHALT SS Split Spoon Sampler PM Pressuremeter Test ST Shelby Tube Sampler RD Rock Bit Drilling ., ���3 � CONCRETE WS Wash Sample RC Rock Core, NX, BX,AX � `K.:.' ik BS Bulk Sample of Cuttings REC Rock Sample Recovery% a GRAVEL � PA Power Auger(no sample) RQD Rock Quality Designation C HSA Hollow Stem Auger i' ' < t- ',� TOPSOIL �a:� ^ PARTICLE SIZE IDENTIFICATION VOID DESIGNATION PARTICLE SIZES I I I BRICK Boulders 12 inches(300 mm)or larger I � Cobbles 3 inches to 12 inches(75 mm to 300 mm) Da AGGREGATE BASE COURSE Gravel: Coarse 3/4 inch to 3 inches(19 mm to 75 mm) Q®e? Fine 4.75 mm to 19 mm(No.4 sieve to 3/4 inch) rN FILLS MAN-PLACED SOILS Sand: Coarse 2.00 mm to 4.75 mm(No. 10 to No.4 sieve) 14'`,,: Medium 0.425 mm to 2.00 mm (No.40 to No. 10 sieve) GW WELL-GRADED GRAVEL Fine 0.074 mm to 0.425 mm(No.200 to No.40 sieve) 10 gravel-sand mixtures,little or no fines Silt&Clay("Fines") <0.074 mm(smaller than a No.200 sieve) *6hitaiGP POORLY-GRADED GRAVEL f.r gravel-sand mixtures,little or no fines - KV; GM SILTY GRAVEL COHESIVE SILTS&CLAYS COARSE FINE 4110. gravel-sand-silt mixtures UNCONFINED RELATIVE GRAINED GRAINED GC CLAYEY GRAVEL COMPRESSIVE SPT5 CONSISTENCY AMOUNT (%)8 (%)8 r°' gravel-sand-clay mixtures STRENGTH,Qp4 (BPF) (COHESIVE) Trace <5 <5 SW WELL-GRADED SAND <0.25 <3 Very Soft Dual Symbol 10 10 .,,, gravelly sand,little or no fines 0.25-<0.50 3-4 Soft (ex:SW-SM) SP POORLY-GRADED SAND 0.50-<1.00 5-8 Firm ®-°- ,.1 gravelly sand,little or no fines With 15 20 15 25 1.00-<2.00 9-15 Stiff Adjective >25 >30 g SM SILTY SAND 16 30 VeryStiff (ex:"Silty") sand-silt mixtures 2.00-<4.00 Mb• SC CLAYEY SAND 4.00-8.00 31 -50 Hard „' sand-clay mixtures >8.00 >50 Very Hard WATER LEVELS6 ML SILT v WL Water Level(WS)(WD) non-plastic to medium plasticity GRAVELS,SANDS&NON-COHESIVE SILTS (WS)While Sampling I I I I I MH ELASTIChighplasticity SILT SPT5 DENSITY (WD)While Drilling <5 Very Loose ! SHW Seasonal High WT VI °,,:` r' CL LEAN CLAY ♦ ACR After CasingRemoval �." E low to medium plasticity 5-10 Loose CH FAT CLAY 11 -30 Medium Dense v SWT Stabilized Water Table Vi high plasticity 31 -50 Dense DCI Dry Cave-In ` ' OL ORGANIC SILT or CLAY >50 Very Dense WCI Wet Cave-In non-plastic to low plasticity OH ORGANIC SILT or CLAY high plasticity ' , PT PEAT highly organic soils 1Classifications and symbols per ASTM D 2488-09(Visual-Manual Procedure)unless noted otherwise. 2To be consistent with general practice, "POORLY GRADED"has been removed from GP, GP-GM, GP-GC,SP,SP-SM,SP-SC soil types on the boring logs. 3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol[Ex:(SM-FILL)]. 4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot(tsf). 5Standard Penetration Test(SPT)refers to the number of hammer blows(blow count)of a 140 lb.hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches(ASTM D 1586). "N-value"is another term for"blow count"and is expressed in blows per foot(bpf). 6The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids,in granular soils. In clay and cohesive silts,the determination of water levels may require several days for the water level to stabilize. In such cases,additional methods of measurement are generally employed. 7Minor deviation from ASTM D 2488-09 Note 16. 8Percentages are estimated to the nearest 5%per ASTM D 2488-09. Reference Notes for Boring Logs(03-22-2017) ©2017 ECS Corporate Services,LLC. All Rights Reserved CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-1 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.97210833 -80.27948611 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z • LIMIT% CONTENT% LIMIT% a w X • A E z p BOTTOM OF CASING M LOSS OF CIRCULATION " w O - J ¶5 a 2 f g Ov SURFACE ELEVATION 815 ft w > 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w ¢ BLOWS;FT co co co ce3 w m 0 — \Topsoil Depth[2.00"] / ` 815 • (SM)Residuum,SILTY SAND,contains mica, — 3 S-1 SS 18 18 orangish-brown to tan-brown,moist,loose 4 10 ►e 6 3 _- S-2 SS 18 18 3 7 .� 5— - 810 4 2 _ S-3 SS 18 14 2 ►:� 3 2 _ S-4 SS 18 18 3 7 ►:� 10 - 805 4 2 S-5 SS 18 18 3 7 ►.� 15— 800 4 2 S-6 SS 18 18 3 7 .� 20 _ END OF BORING @ 20.00' _ 4 - 795 25— —790 30— —785 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD E BORING STARTED 06/25/18 CAVE IN DEPTH @ 12.33' • WL(SHW) WL(ACR) BORING COMPLETED 06/25/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET LeoTerra Development, Inc. 09:28353 B-2 1 OF 1 rime% PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% ——— REC% 35.97200833 -80.27711111 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z LIMIT% CONTENT% LIMIT% a w X • A E z p BOTTOM OF CASING M LOSS OF CIRCULATION " w O - J a g Ov SURFACE ELEVATION 822 ft W > 3 (8) STANDARD PENETRATION C coco co c 3 w coBLOWSIFT 0 — \Topsoil Depth[2.00"] / (SM)Residuum,SILTY SAND,trace clay, — 3 S-1 SS 18 14 contains mica,orangish brown,dry to moist, 820 5 12 0 medium dense 7 4 _- S-2 SS 18 18 7 16 �0 5— 9 (SM)SILTY SAND,contains mica, tannish orange to tan-white,moist,medium dense 4 — S-3 SS 18 18 815 6 12 6 3 _ S-4 SS 18 16 5 11 �0 10 6 —810 4 S-5 SS 18 18 6 13 15 805 5 _ S-6 SS 18 18 _ 6 14 20 8 END OF BORING @ 20' — —800 25— 795 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD E BORING STARTED 06/25/18 CAVE IN DEPTH @ 11.50' • WL(SHW) WL(ACR) BORING COMPLETED 06/25/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-3 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.97210556 -80.27478889 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z • LIMIT% CONTENT% LIMIT% a w X • A E z p BOTTOM OF CASING M LOSS OF CIRCULATION MD O - J ¶5 o_ g 8 SURFACE ELEVATION 821 ft w > 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w ¢ BLOWS;FT co co co ce3 w m 0 — \Topsoil Depth[2.25"] • (SM)Residuum,SILTY SAND,contains mica, —820 3 S-1 SS 18 16 orangish brown to tan-white,moist,loose 4 10 ►e 6 3 S-2 SS 18 18 4 • ►:� 5— 5 815 3 S-3 SS 18 18 4 8 .� 4 2 _ S-4 SS 18 18 4 8 ►e 10 4 810 2 S-5 SS 18 18 4 8 ►.� 15— 4 805 3 S-6 SS 18 18 4 8 ►e 20 4 END OF BORING @ 20' 800 25- - —795 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD E BORING STARTED 06/25/18 CAVE IN DEPTH @ 12' • WL(SHW) WL(ACR) BORING COMPLETED 06/25/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-4 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.97181389 -80.272625 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w Z co p LIMIT% CONTENT% LIMIT% a w X • A E z r p BOTTOM OF CASING MLOSS OF CIRCULATION " L., O - J t0 a 1 f g Ov SURFACE ELEVATION 822 ft w > 3 (3) STANDARD PENETRATION w < ¢ < w ¢ _i _i BLOWS;FT o co co co c 3 w co 0 — 'Topsoil Depth[3.00"] ' x,- -1111 (SM)Residuum,SILTY SAND,contains mica, — 3 S-1 SS 18 16 orangish brown to tannish orange to tan-white, 820 s 10 moist,loose s _ 3 _ S-2 SS 18 18 5 10 i 5— 5 .1111 2 — S-3 SS 18 16 815 4 8 4 _ 3 _ S-4 SS 18 18 4 8 ►e 10 4 — — —810 _ 3 S-5 SS 18 18 3 8 ►.� 15— — 5 — 805 2 _ S-6 SS 18 18 3 7 .� 20 4 END OF BORING @ 20' — —800 25— 795 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD® BORING STARTED 06/26/18 CAVE IN DEPTH @ 11.83' g WL(SHW) 1 WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-5 1 OF 1Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.97049167 -80.27953056 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w Z co p LIMIT% CONTENT% LIMIT% a v w "3 X • A E z r p BOTTOM OF CASING M LOSS OF CIRCULATION w O - J t0 a g SURFACE ELEVATION 803 ft w > 3 ® STANDARD PENETRATION Li, ¢ ¢ ¢ w -, _i _i BLOWS'FT o co co co c 3 w co 0 1Topsoil Depth[2.001 / • -1111 (SC)Residuum,CLAYEY SAND,trace silt, 3 5-1 SS 18 16 contains slight mica,brown,dry,loose 4 10 — '� • 6 (SM)SILTY SAND,trace clay,contains mica, 300 _- S-2 SS 18 18 orangish-brown,moist,loose — 5 10 i 5— 5 .1111 3 S-3 SS 18 18 4 8 ►:� 4 (SM)SILTY SAND,contains mica, tannish -795 _ S-4 SS 18 18 orange to tan-black,moist,loose 2 6 .� 10 3 790 2 S-5 SS 18 18 3 6 ►.� 15— 3 — 785 2 _ S-6 SS 18 18 4 8 ►e 20 4 END OF BORING @ 20' — —780 25- - —775 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD E BORING STARTED 06/26/18 CAVE IN DEPTH @ 12.75' g WL(SHW) 1 WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET LeoTerra Development, Inc. 09:28353 B-6 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.97070278 -80.27630833 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z • LIMIT% CONTENT% LIMIT% a v " w X • A E z p BOTTOM OF CASING M LOSS OF CIRCULATION w O - J a 2 f g Ov SURFACE ELEVATION 799 ft w > 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w BLOWS TT o m CO CO C 3 w m 0 -\Topsoil Depth[3.00"] / P�.. - (SC)Residuum,CLAYEY SAND,trace silt, .• 4 S-1 SS 18 16 contains slight mica,brown,dry,medium dense . 7 15 ►.� — 8 (SM)SILTY SAND,contains mica, orangish 3 S-2 SS 18 18 brown to tannish orange to tan-black,moist, —795 6 14 ►e medium dense to loose 8 5— 4 S-3 SS 18 18 4 • ►:� 5 2 _ S-4 SS 18 18 —790 3 7 ►:� 4 10 3 - S-5 SS 18 18 785 4 8 ►.� 15— 4 3 _ S-6 SS 18 18 780 3 7 .� 20 4 END OF BORING @ 20' - 775 25— 770 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD E BORING STARTED 06/26/18 CAVE IN DEPTH @ 11.67' • WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-7 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.97031389 -80.27317222 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w Z co p LIMIT% CONTENT% LIMIT% a v W X • A E z r p BOTTOM OF CASING]♦ LOSS OF CIRCULATION ") L., O - J t0 a 1 f g Ov SURFACE ELEVATION 800 ft w > 3 (3) STANDARD PENETRATION w < < < w ¢ _i BLOWS'FT o co co co c 3 w co 0 — 'Topsoil Depth[3.00"] , ? 800 (SP-SM)Residuum,SAND WITH SILT,orange, ••l'.— 4 S-1 SS 18 15 dry to moist,medium dense to loose . ••.` 6 16 j ..' 10 — ;: ':L_ _ • 3 S-2 SS 18 18 . `'•: 5 10 ►) 5 :.1: ' 795 5 (SM)SILTY SAND,contains mica, tan, moist, .1111 loose — 3 S-3 SS 18 14 4 8 ►:� 4 _ 3 _ S-4 SS 18 16 3 8 10 - 790 5 _ 3 S-5 SS 18 18 4 8 ►.� 15— —785 4 2 S-6 SS 18 18 3 7 .� 20 END OF BORING @ 20' _ — 4 - 780 25— —775 30— —770 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WDE BORING STARTED 06/27/18 CAVE IN DEPTH p@ 12' g WL(SHW) 1 WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-8 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96878333 -80.27968333 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% a w X • A E z r p BOTTOM OF CASING M LOSS OF CIRCULATION la w O - J a Ov SURFACE ELEVATION 778 ft w > 3 (3) STANDARD PENETRATION w < ¢ < w ¢ BLOWS;FT co co co ce3 w m 0 — 'Topsoil Depth[3.00"] / Nxi,c\x -1111 (SM)Residuum,SILTY SAND,contains mica, — 3 S-1 SS 18 16 orangish brown to tannish orange to tan,moist, — 5 13 ►e medium dense to loose _ 8 775 3 _- S-2 SS 18 18 4 8 ►:� 5— 4 .1111 2 _ S-3 SS 18 15 3 6 3 770 2 _ S-4 SS 18 18 3 76� 10 4 765 3 S-5 SS 18 18 3 7 g� 15— — 4 760 3 _ S-6 SS 18 18 4 • ►D 20 s END OF BORING @ 20' —755 25— —750 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WDE BORING STARTED 06/26/18 CAVE IN DEPTH @ 12.25' • WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-9 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96939722 -80.27723889 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z • LIMIT% CONTENT% LIMIT% a w X • A E z p BOTTOM OF CASING M LOSS OF CIRCULATION la w O - J ¶5 a Ov SURFACE ELEVATION 784 ft w > 3 (3) STANDARD PENETRATION w ¢ ¢ ¢ w ¢ BLOWS;FT co co co c 3 w m 0 — \Topsoil Depth[2.001 (SM)Residuum,SILTY SAND,contains mica, — 3 S-1 SS 18 18 tannish-orange to tan-black,moist,medium 5 11 ►e dense to loose 6 2 _- S-2 SS 18 18 780 3 6 .' 3 5— 2 S-3 SS 18 16 2 ►:� 3 2 _ S-4 SS 18 16 —775 3 6 .' 3 10 3 - S-5 SS 18 18 770 3 7 ►:4 15— 4 3 _ S-6 SS 18 18 765 4 8 ►:� 20 4 END OF BORING @ 20' 760 25— 755 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD E BORING STARTED 06/26/18 CAVE IN DEPTH @ 11.75' • WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-10 1 OF 1 _Eris, PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.96905 -80.27534444 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • Z co p LIMIT% CONTENT% LIMIT% a w X • A E z p E2 BOTTOM OF CASING MLOSS OF CIRCULATION " L., O - J Zip a 1118 SURFACE ELEVATION 774 ft w > 3 ® STANDARD PENETRATION w < ¢ < w ¢ _i _i BLOWS;FT C CO CO CO C 3 w CO 0 - 'Topsoil Depth[3.00") / NX/T L -1111 (SP FILL)FILL,SAND,trace silt,trace clay, .� 7 — S-1 SS 18 15 contains slight roots,light tan,dry,loose — 4 6 i :: :_ z ;! ;i ; (SM)Alluvium,SILTY SAND,greenish tan, wet, NP S-2 SS 18 15 very loose —770 WO NP • 5 WOH 12.4 .1111 (SC)Residuum,CLAYEY SAND,contains slight 2 — S-3 SS 18 18 mica,grayish tan to gray,moist,loose to 5 12 medium dense _ 3 S-4 SS 18 18 765 6 13 ►:� 10 %l7 5 _ S-5 SS 18 18 760 0 17 ►D 15— y'�. . . ..? S-6 SS 18 16 d.••./._.•. 755 2 6 ►:� 20 4 END OF BORING @ 20' 750 25— 745 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WDE BORING STARTED 06/27/18 CAVE IN DEPTH p@ 12' g WL(SHW) 1 WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET LeoTerra Development, Inc. 09:28353 B-11 1 OF 1Eil PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96701111 -80.27941389 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% a v " w X E z E E2 BOTTOM OF CASING]♦ LOSS OF CIRCULATION w O - J o_ LU f g 8 SURFACE ELEVATION 748 ft w > 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w BLOWS'FT o co co co c 3 w m 0 1Topsoil Depth[2.001 / 're -1111 (SC)Residuum,CLAYEY SAND,red-brown to 3 S-1 SS 18 16 tan-gray,moist,loose 3 • ►.� 6 745 2 _ •.. S-2 SS 18 15 4 8 ►:� 5— Y 4 (SM)SILTY SAND,trace clay,contains mica, 5 — S-3 SS 18 15 orangish tan to dark gray, moist to wet,loose to 3 8 e very loose 740 WOH _ S-4 SS 18 16 1 2 10 1 735 woh - S-5 SS 18 13 1 ►D 3 15— 2 730 2 _ S-6 SS 18 14 3 8 ►D 20 5 END OF BORING @ 20' — —725 25— —720 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD® BORING STARTED 06/26/18 CAVE IN DEPTH @ 11.33' WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-12 1 OF 1Eis, PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96723056 -80.27663611 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w Z co LIMIT% CONTENT% LIMIT% a 1- v w X • A E z p BOTTOM OF CASING]♦ LOSS OF CIRCULATION " w O - J zo P — a 2 f g Ov SURFACE ELEVATION 795 ft w > 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w ¢ _i _i BLOWS TT o co co co c 3 w co 0 1Topsoil Depth[2.001 / 795 (SC)Residuum,CLAYEY SAND,red-brown, ,r 4 S-1 SS 18 16 moist,medium dense 6 14 .� 8 (SM)SILTY SAND,contains mica,orange-tan, _- S-2 SS 18 18 moist,loose 4 8 ►�� 5— 790 4 3 S-3 SS 18 18 4 8 4 (SM)SILTY SAND,trace clay,contains mica, _ S-4 SS 18 18 dark gray,moist,loose 3 7 d� 10 - - 785 4 _ 3 S-5 SS 18 18 3 8 ►.� 15— 780 5 3 S-6 SS 18 18 4 • ►.� 5 20 - 775 END OF BORING @ 20' — — 25— —770 30— —- 765 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD E BORING STARTED 06/27/18 CAVE IN DEPTH @ 11.92' g WL(SHW) 1 WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-13 1 OF 1Eis, PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96657222 -80.274175 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w Z • LIMIT% CONTENT% LIMIT% a 0) w X • A z p E E BOTTOM OF CASING MLOSS OF CIRCULATION " w O - J ¶5 a g SURFACE ELEVATION 781 ft w > 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w ¢ _i _i BLOWSFT o co co co c 3 w co 0 — \Topsoil Depth[2.00"] / (SM)Residuum,SILTY SAND,contains mica, —- 780 5 • S-1 SS 18 14 brown-black,dry,loose 4 10 ►e 6 _ 5 _ S-2 SS 18 16 3 7 .� 5— 4 (SM)SILTY SAND,trace clay,contains mica, 775 4 — S-3 SS 18 16 dark gray,moist,loose 3 7 ►'� a _ 3 _ S-4 SS 18 18 3 6 .� 10 3 — — 770 _ 3 S-5 SS 18 18 4 8 ►.� 15— 4 - 765 3 _ S-6 SS 18 16 4 • ►.� 20 5 END OF BORING @ 20' 760 25- - —755 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WD E BORING STARTED 06/27/18 CAVE IN DEPTH @ 11.33' XI WL(SHW) 1 WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-14 1 OF 1Eil PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96601944 -80.27814444 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% w X • A E z p E2 BOTTOM OF CASING MLOSS OF CIRCULATION la O - J ¶5 a g SURFACE ELEVATION 768 ft w >Li, 3 (3) STANDARD PENETRATION w ¢ ¢ ¢ w ¢ BLOWS;FT co co co c 3 w co 0 — \Topsoil Depth[2.00"] - -11111 (SM)Residuum,SILTY SAND,orange red- — 4 S-1 SS 18 14 brown,dry to moist,medium dense 5 13 ►e 8 765 4 _- S-2 SS 18 18 5 12 .� 5— 7 .1111 (SM)SILTY SAND,trace clay,contains mica, — 3 — S-3 SS 18 18 dark gray,moist,loose 3 8 .� 5 760 3 _ S-4 SS 18 18 4 8 10 4 755 2 - S-5 SS 18 18 4 • ►:� 15— 5 750 3 _ S-6 SS 18 18 5 10 ►D 20 5 END OF BORING @ 20' — —745 25— —740 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD E BORING STARTED 06/27/18 CAVE IN DEPTH @ 11.42' • WL(SHW) WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-15 1 OF 1 Eil PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96456111 -80.27970278 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% w X • A E z r p BOTTOM OF CASING MLOSS OF CIRCULATION " w O - J ¶5 a Ov SURFACE ELEVATION 752 ft w > 3 (3) STANDARD PENETRATION w < ¢ < w ¢ BLOWS TT co co co c 3 w co 0 — 'Topsoil Depth[3.00"] / 'x``-\x -11111 (SM)Residuum,SILTY SAND,red-brown,dry, — 2 S-1 SS 18 15 very loose - 750 2 ►e 4 2 (SM)SILTY SAND,tan brown-tan white, moist, S-2 SS 18 16 loose to medium dense 3 6 I 38 iK Q 65 5_ 3 25.8 .1111 — S-3 SS 18 8 745 2 ►.� 3 3 _ S-4 SS 18 15 4 10 ►D 10 6 740 _ — 7 S-5 SS 18 16 8 21 15 13 - 735 8 _ S-6 SS 18 16 14 30 ►e 20 - 16 END OF BORING @ 20' —- 730 25— 725 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL 13.50 WS❑ WD E BORING STARTED 06/27/18 CAVE IN DEPTH p@ 11.00' • WL(SHW) WL(ACR) 10.50 BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-16 1 OF 1Eil is, PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.96275833 -80.27997778 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w Z co p LIMIT% CONTENT% LIMIT% a v W X • A E z r p BOTTOM OF CASING]♦ LOSS OF CIRCULATION " L., O - J t0 a g SURFACE ELEVATION 726 ft w > 3 (3) STANDARD PENETRATION Li, ¢ ¢ ¢ w ¢ _i _i BLOWS'FT o co co co c 3 w co 0 1Topsoil Depth[2.00"] / ::. -11111 (SC)Residuum,CLAYEY SAND,tan-brown to 1 ; 725 i S-1 SS 18 16 tan,moist,very loose to medium dense 2 4 2 3 _ S-2 SS 18 18 1. 5 127 .� 5— .1111 Fj'/-. 720 3 — S-3 SS 18 13 4 8 .� 4 ..../ _ 1 S-4 SS 18 16 2 4 10 ;;:t 2 - :7— 715 (SM)SILTY SAND,tan,wet,loose to medium _ 1 S-5 SS 18 12 dense 2 • ►�� 15— 710 5 _ S-6 SS 18 8 7 13 ►:� 20 6 END OF BORING @ 20' 705 25- - —700 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL 8.33 WS❑ WD® BORING STARTED 06/27/18 CAVE IN DEPTH @ 12.33' XI WL(SHW) 1 WL(ACR) 7.00 BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-17 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.97153611 -80.26913611 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% w X • A E z r p BOTTOM OF CASING MLOSS OF CIRCULATION la w O - J ¶5 a Ov SURFACE ELEVATION 843 ft w > 3 (3) STANDARD PENETRATION w < ¢ ¢ w ¢ BLOWS;FT co co co c 3 w m 0 — 'Topsoil Depth[3.001 / Nxi,c\x -1111 (SM)Residuum,SILTY SAND,contains mica, — 2 5-1 SS 18 16 orange-brown to orange-tan to tan-gray,moist, — 3 8 ►.� loose _ 5 840 2 _- S-2 SS 18 18 3 7 .� 5— 4 .1111 2 _ S-3 SS 18 18 3 6 3 835 2 _ S-4 SS 18 18 3 76� 10 4 830 2 S-5 SS 18 18 3 7 ►.� 15— 4 825 3 _ S-6 SS 18 18 4 8 ►e 20 4 END OF BORING @ 20' —820 25— —815 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WDE BORING STARTED 06/26/18 CAVE IN DEPTH p@ 12.42' • WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-18 1 OF 1Eil PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.97031111 -80.27047222 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% w X • A E z r p BOTTOM OF CASING MLOSS OF CIRCULATION MD O - J ¶5 o_ g 8 SURFACE ELEVATION 820 ft w >Li, 3 ® STANDARD PENETRATION w ¢ ¢ ¢ w ¢ BLOWSFT co co co c 3 w co 0 — \Topsoil Depth[2.00"] / 820 -11111 (SM)Residuum,SILTY SAND,contains mica, — 3 S-1 SS 18 18 orange-brown to tannish gray,moist,loose 4 • ►.� 5 2 _- S-2 SS 18 18 4 8 ►:� 5— - 815 4 .1111 2 _ S-3 SS 18 18 3 6 3 2 _ S-4 SS 18 18 3 7d'� 10 - 810 4 3 S-5 SS 18 18 4 8 ►.� 15— —805 4 3 S-6 SS 18 18 4 • ►.� 5 20 - 800_ END OF BORING @ 20' _ 25— —795 30— —- 790 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. g WL WS❑ WDE BORING STARTED 06/26/18 CAVE IN DEPTH p@ 12' • WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET LeoTerra Development, Inc. 09:28353 B-19 1 OF 1 Eilis, PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96903333 -80.27139722 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% a v w " X • A E z r p BOTTOM OF CASING]♦ LOSS OF CIRCULATION w O - J a Ov SURFACE ELEVATION 813 ft w > 3 (3) STANDARD PENETRATION w < < < w BLOWS'FT o co co co ce3 w m 0 — 'Topsoil Depth[3.00"] / P�.:..— -11111 (SC)Residuum,CLAYEY SAND,tan-brown, 2 S-1 SS 18 15 moist,loose 3 8 ►.� 5 (SM)SILTY SAND,contains mica,orange- 810 brown to tan to tannish gray,moist,medium 3 S-2 SS 18 18 5 11 dense to loose 6 5— .1111 3 _ S-3 SS 18 16 4 • ►:� 5 805 2 _ S-4 SS 18 18 3 6 .� 10 3 800 3 - S-5 SS 18 18 3 6 ►.� 15— 3 795 2 _ S-6 SS 18 16 4 8 ►e 20 4 END OF BORING @ 20' —790 25— —785 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD E BORING STARTED 06/26/18 CAVE IN DEPTH @ 12.17' • WL(SHW) WL(ACR) BORING COMPLETED 06/26/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET LeoTerra Development, Inc. 09:28353 B-20 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% - —- REC% 35.96571944 -80.273175 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z p LIMIT% CONTENT% LIMIT% a v w " X • A E z r p BOTTOM OF CASING]♦ LOSS OF CIRCULATION w O - J a Ov SURFACE ELEVATION 762 ft w > 3 (3) STANDARD PENETRATION w < < < w BLOWS'FT o co co co ce3 w m 0 1Topsoil Depth[2.001 / -1111 (SC)Residuum,CLAYEY SAND,tan-brown, •' 3 S-1 SS 18 18 moist,loosed 760 43 7 .► (SM)SILTY SAND,contains mica,orange- 3 S-2 SS 18 18 brown to tannish gray-white,moist,medium — 6 11 dense to loose 6 5— .1111 3 — S-3 SS 18 12 755 3 8 5 2 _ S-4 SS 18 18 3 7 6� 10 4 750 2 S-5 SS 18 16 3 6 ►.� 15— 3 2 S-6 SS 18 16 3 7 ►:� -411 745 4 20 END OF BORING @ 20' —740 25— 735 30 — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD E BORING STARTED 06/27/18 CAVE IN DEPTH @ 12.33' WL(SHW) WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-21 1 OF 1 Er PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96493889 -80.27437222 DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • z • LIMIT% CONTENT% LIMIT% a w X • A E z p BOTTOM OF CASING M LOSS OF CIRCULATION MD O - J ¶5 a Ov SURFACE ELEVATION 762 ft w > 3 (3) STANDARD PENETRATION w < ¢ ¢ w ¢ BLOWS TT co co co ce3 w m 0 — \Topsoil Depth[2.001 — (SM)Residuum,SILTY SAND,orange-brown, — 3 S-1 SS 18 16 moist,loose to medium dense 760 5 13 ►e a 3 S-2 SS 18 18 5 10 ►:4 5— 5 3 — S-3 SS 18 18 755 6 13 ►:� 3 _ S-4 SS 18 18 5 11 ►D 10 6 750 (SM)SILTY SAND,tan brown,moist,loose 3 S-5 SS 18 18 5 10 ►D 15— 5 745 4 _ S-6 SS 18 18 4 • ►.� 20 5 END OF BORING @ 20' — —740 25— 735 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WD E BORING STARTED 06/27/18 CAVE IN DEPTH @ 12.25' WL(SHW) WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN M.Hartley DRILLING METHOD HSA CLIENT Job#: BORING# SHEET 0 LeoTerra Development, Inc. 09:28353 B-22 1 OF 1 Eis, PROJECT NAME ARCHITECT-ENGINEER Hege Road Site SITE LOCATION 765 Hege Road -0-CALIBRATED PENETROMETER TONS/FT2 Lexington, Davidson County, North Carolina NORTHING EASTING STATION ROCK QUALITY DESIGNATION&RECOVERY RQD% — —— REC% 35.96279167 -80.27636944 Z DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTIC WATER LIQUID w • Z co LIMIT% CONTENT% LIMIT% a — " W X • A E z E BOTTOM OF CASING M LOSS OF CIRCULATION L., O - J t0 a 1118 SURFACE ELEVATION 741 ft w > 3 ® STANDARD PENETRATION w < < < w ¢ _i _i BLOWS TT o m CO CO C 3 w CO 0 -\Topsoil Depth[3.00"] / f3 (SC)Residuum,CLAYEY SAND,tannish 740 4 S-1 SS 18 16 orange-gray,moist,medium dense 5 11 ►e 6 lr / ' 4 _- S-2 SS 18 18 / 5 12 .� 5— "`..'` 735 (MH)ELASTIC SILT,contains slight mica, tan 3 _ S-3 SS 18 18 gray,moist,stiff 6 14 ►:4 28.4♦ X54 g y' 8 33 (SM)SILTY SAND,orange-white and black to _ S-4 SS 18 18 light orange,moist,medium dense. — 16 24 ►�� 10 13 — 730 (ML)SANDY SILT,light orange, moist, soft to _ 1 S-5 SS 18 18 firm — 1 j►.► 3 NP 36.2♦ 15— — 2 NP 725 _ 1 _ S-6 SS 18 18 1 ►D 4 20' — 3 720 2 _ S-7 SS 18 18 2 ►� 25 3 END OF BORING @ 25' — —715 30— — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WDE BORING STARTED 06/27/18 CAVE IN DEPTH @ 15.81' XI WL(SHW) 1 WL(ACR) BORING COMPLETED 06/27/18 HAMMER TYPE Auto WL RIG Truck FOREMAN Matt Hartley DRILLING METHOD HSA APPENDIX C - LABORATORY TESTING SUMMARY Laboratory Testing Summary Page 1 of 1 Atterberg Limits3 Percent Moisture-Density(Corr.)5 Sample Sample Depth MCI Soil Passing Maximum Optimum CBR Other Source Number (feet) (%) Type2 LL PL PI No. 200 Density Moisture Value6 Sieve4 (pcf) (%) B-10 S-2 3.50 -5.00 12.4 SM NP NP NP 28.4 B-15 8-2 3.50 -5.00 25.8 SM 65 38 27 47.5 B-22 S-3 6.00 -7.50 28.4 MH 54 33 21 76.4 S-5 13.50 -15.00 36.2 ML NP NP NP 55.1 Notes: 1.ASTM D 2216,2.ASTM D 2487,3.ASTM D 4318,4.ASTM D 1140,5.See test reports for test method,6.See test reports for test method Definitions: MC:Moisture Content,Soil Type:USCS(Unified Soil Classification System),LL:Liquid Limit,PL:Plastic Limit,PI:Plasticity Index,CBR:California Bearing Ratio,OC:Organic Content(ASTM D 2974) Project No. 09:28353 Project Name: Hege Road Site I ECS SOUTHEAST, LLP IWI 4811 Koger Boulevard PM: Dharani Vallabhaneni Greensboro,NC 27407 PE: David C.Boger iS, Phone:(336)856-7150 g err Fax:(336)856-7160 Printed On: Friday,July 13,2018