HomeMy WebLinkAboutSW4240902_Supplement-EZ Form_20241004 SUPPLEMENT-EZ COVER PAGE
• FORMS LOADED
PROJECT INFORMATION
1 Project Name Bryson Park 1-3
2 Project Area(ac) 125.51
3 Coastal Wetland Area(ac) 0
4 Surface Water Area(as) 0
5 Is this project High or Low Density? Low
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Wdth of vegetated setbacks provided(feet) See Narrative Provided
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is.ro•osed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
r 11 Infiltration System
12 Bioretention Cell
13 Wet Pond
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DISC
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
_._
27IName and Title: Robert L.Frost,PE Principal Engineer #--
28 'Organization: NC Design Solutions,Inc.
29 Street address: 6701 Carmel Road,Suite 205
30 City,State,Zip: Charlotte,NC 28226
31 Phone number(s): 704-614-8359
32 Email: rfrost@ncdesignsolutions.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that
the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. RE C C I'r p
Designer C C
\\\,,,SCAR Ili AUG 3 01024
�\pe'�F •s s; ���'� Wt.,- ` MLR-STORMWATER PROGRAM
0..•2
SE _ Signature of Designer
71 Robert L. Frost, PE - Principal Engineer
•
%f-0 �'G 1 N E,tipOco'''��
if0/ j. ,\\ August 29, 2024
8.29.2024 Date
DRAINAGE AREAS
1 Is this a high density project? No
2 If so,number of drainage areas/SCMs
3 Does this project have low density areas? Yes
4 If so,number of low density drainage areas 1
Is all/part of this project subject to previous rule
5 versions? No
CLICK TO LOAD FORM
LOW DENSITY
DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003 _
1 Is project below density thresholds set forth in the applicable stormwater rule? Yes
2 ;Does project maximize dispersed flow and minimize channelization of flow? Yes
3 Has the use of piping been minimized per.1003(2)(c)? Yes
4 Side slopes of the vegetated conveyances(H:V) sf f
5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5.02�`—3:1
6 Are curb outlet swales proposed? No Max. velocity from
7 Maximum longitudinal slope of curb outlet swale(s)(%)
8 Bottom width of curb outlet swale(s)(feet) table on Sheet 37
9 Maximum side slope of curb outlet swale(s)(H:V) of the approved
10 Minimum length of curb outlet swale(s)(feet)
11 Are treatment swales used instead of curb outlet swales? Yes construction
t 12 Is stormwater released at the edge of the setback as dispersed flow? Yes drawings
m13 Have stormwater outlets been designed to prevent downslope erosion? Yes
14 Are variations to rule.1003 proposed? No
ADDITIONAL INFORMATION
15 Please use this space to provide any additional information about this low density project:
See swale calculations on Sheet 37 of
approved construction drawings.
Drainage ' Pervious
Swale BUA Q Slope V,i�,,, V.,.,..: Flow depth
Area area C
# (ac) (ac) (ac) (cfs) (%) (fps) (fps) (ft)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30