Loading...
HomeMy WebLinkAboutNC0032191_Compliance Inspection_20241007United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCO032191 111 121 24/09/23 I17 18 I C I 19 Ls_] 201 I 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I n, I 71 I 74 79 I I I I I I I80 701 I 71 I LL J I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 10:OOAM 24/09/23 23/09/01 Hebron Colony & Grace Home WWTP 356 Old Tpke Rd Exit Time/Date Permit Expiration Date Boone NC 28607 11:05AM 24/09/23 27/09/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Brandon K Hughes/ORC// Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Jadd Wesley Brewer,PO Box 1167 Banner Elk NC 286041167//828-898-6255/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Michael Gearren DWR/WSRO WQ/336-776-9800/ October 7, 2024 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: 10/7/2024 '---OD2D3CE3F1B7456.- EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO032191 I11 12I 24/09/23 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) September 23, 2024 — Inspection Summary On September 23, 2024, Division of Water Resources staff, Michael Gearren, conducted a scheduled routine compliance inspection of the Hebron Colony & Grace Home WWTP, NPDES Permit #NC0032191. Brandon Hughes, Operator in Responsible Charge (ORC), was present for the inspection. A review of records, data, treatment components, and structures was completed. This inspection reflected non-compliance with the subject permit. Violations, items of concern, and other observations made during the inspection are documented as follows: The following violation was noted: An emergency generator is located on site, but no records of maintenance or testing were available during the inspection. At the time of the inspection, Mr. Hughes was unable to start the emergency generator and was unable to verify that the generator is operational or that it would power automatically when necessary. Part II. Section C. 7. Power Failures requires that "the Permittee is responsible for maintaining adequate safeguards (as required by 15A NCAC 02H .0124) to prevent the discharge of untreated or inadequately treated wastes during electrical power failures either by means of alternate power sources, standby generators or retention of inadequately treated effluent." The following items of concern were noted: • The current NPDES permit was not available for review during the inspection. • There is no gate or access restrictions to the WWTP. Other observations: • Facility appears well maintained and clean. • Facility uses Water Quality Labs Inc. located in Banner Elk, Certification # 544. All samples are grab and are collected by the ORC. • Sludge removal is contracted with Triple T Pumping Inc out of Boone. • ORC, Brandon Hughes, holds a WW Grade III, Certification # - 1012103. Back up ORC is Paul Isenhour, who holds a WW Grade IV, Certification # - 13154. • ORC Log Book records time on site each day and daily maintenance or repairs. Larger repairs are normally accomplished by Hebron Colony maintenance personnel. • Bar Screen has very few screenings, according to Mr. Hughes. • Equalization basin is aerated but it was not in use at time of inspection. Mr. Hughes indicated that dissolved oxygen levels get too high when EQ aeration is used. • Flow enters anoxic zone from splitter box and then flows to dual aeration basins. Only one basin was in use at the time of the inspection. • Effluent flow meter is located before UV disinfection and was last calibrated on 7/9/2024. • Chlorine tablets are used as back-up disinfection. Chlor Away (Sodium sulfite tablets) are used for dechlorination. • Effluent was clear and odor free at time of inspection. Page# Permit: NCO032191 Inspection Date: 09/23/2024 Owner -Facility: Hebron Colony & Grace Home WWTP Inspection Type: Compliance Evaluation Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: There is no pate or access restrictions to access the Hebron Colony WWTP. Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Yes No NA NE ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: Any minor maintnance performed by ORC is documented on ORC Log Sheets. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? ■ ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ■ ❑ ❑ ❑ Dates, times and location of sampling ■ Name of individual performing the sampling ■ Results of analysis and calibration ■ Dates of analysis ■ Name of person performing analyses ■ Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ■ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ ■ ❑ operator on each shift? Is the ORC visitation log available and current? ■ ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ■ ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility ■ ❑ ❑ ❑ classification? Page# 3 Permit: NCO032191 Owner -Facility: Inspection Date: 09/23/2024 Inspection Type: Hebron Colony & Grace Home WWTP Compliance Evaluation Record Keeping Yes No NA NE Is a copy of the current NPDES permit available on site? ❑ 0 ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: Facility did not have a copy of current permit, current copy was give to ORC. All other labs and paperwork in compliance. Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? ■ ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? 0 ❑ ❑ ❑ Comment: Bar screens in good working order. Equalization Basins Yes No NA NE Is the basin aerated? 0 ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? 0 ❑ ❑ ❑ Is the basin free of excessive grease? ■ ❑ ❑ ❑ Are all pumps present? ■ ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Are audible and visual alarms operable? 0 ❑ ❑ ❑ # Is basin size/volume adequate? 0 ❑ ❑ ❑ Comment: EQ basins have capability for aeration but currently not in use, ORC states Disolved Oxygen levels too high when EQ basin is aerated. Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ ■ ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Page# 4 Permit: NCO032191 Inspection Date: 09/23/2024 Owner -Facility: Hebron Colony & Grace Home WWTP Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/I) ❑ ❑ 0 ❑ Comment: After Equalization Basin, flow enters splitter box where only one of the two aeration basins is in use. Then flow goes into an "anexoc zone" before going into aeration basin that is in use. Aeration basin's disolved oxygen levels are from 3.0 to 3.5. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: Sludge blanket is between 3 to 4 feet. Depth of clarifier() us 12 feet. Disinfection - UV Are extra UV bulbs available on site? Are UV bulbs clean? Is UV intensity adequate? Is transmittance at or above designed level? Is there a backup system on site? Is effluent clear and free of solids? Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: Back-up disinfection system uses Chlorine tablets and "Chlor-Away" tablets (Sodium Sulfite) is used for de -chlorination. Pumps-RAS-WAS Yes No NA NE Are pumps in place? ■ ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Page# 5 Permit: NCO032191 Owner -Facility: Hebron Colony & Grace Home WWTP Inspection Date: 09/23/2024 Inspection Type: Compliance Evaluation Pumps-RAS-WAS Yes No NA NE Are there adequate spare parts and supplies on site? ❑ ❑ ❑ Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ ❑ 0 ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? ■ ❑ ❑ ❑ Is the tubing clean? ❑ ❑ 0 ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 ❑ ❑ 0 ❑ degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ ❑ representative)? Comment: Effluent flow meter located before UV Disinfection and effluent weir. Effluent flow meeter calibrated 7/9/2024. Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, 0 ❑ ❑ ❑ and sampling location)? Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? M ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: Effluent pipe clear and path well maintained Standby Power Yes No NA NE Is automatically activated standby power available? ❑ 0 ❑ ❑ Is the generator tested by interrupting primary power source? ❑ 0 ❑ ❑ Is the generator tested under load? ❑ 0 ❑ ❑ Was generator tested & operational during the inspection? ❑ 0 ❑ ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up ❑ ❑ ❑ power? Is the generator fuel level monitored? ❑ ❑ ❑ Page# 6 Permit: NCO032191 Inspection Date: 09/23/2024 Standby Power Owner -Facility: Hebron Colony & Grace Home WWTP Inspection Type: Compliance Evaluation Yes No NA NE Comment: Generator is onsite, ORC states that the maintenance person for Hebron Colon performs maintenance upkeep, there are no records that show maintenance, fuel levels or load testing. At time of the inspection ORC was unable to start generator and put thru a load test. Recommend that ORC and backup ORC become familiar with the backup generator and how to use it. Recommend keeping records of generator maintenance and testing available at WWTP site. Page#