HomeMy WebLinkAboutSW6240707_Stormwater Report_20241001 • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. STORMWATER REPORT CIRCLE K — HSD ADDITION 2723051 FAYETTEVILLE, NORTH CAROLINA ♦ o oo000000000 4/ �i moo' o.OESSia�000q of qo . o o o° NG �� o� . '. , 0I N oo0". ,0o00 E �t MARCH 27, 2024 PREPARED FOR: Circle K Stores Inc 1100 Situs Ct Suite 100 Raleigh, NC 27606 PREPARED BY: Timmons Group, NC License No. 023728 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 www.tmmons.corn Circle K—HSD Addition 2723051 Fayetteville, NC Project Number: 37630.130 Table of Contents Stormwater Narrative 1 Project Background 1 Proposed Project Description 1 Proposed Stormwater Management 1 Stormwater Runoff Control 1 TSS Removal 1 Methodology for Stormwater Modeling 1 Hydrology 1 Hydraulics 2 Pre & Post Development Runoff Summary 2 Reference Material 3 NOAA Rainfall Data 3 USGS Map 3 FEMA Map 3 Soil Survey Map 3 Pre/Post Development Drainage Area Maps 3 Peak Flow Analysis 4 Hydraflow Report 4 SCM Design Calculations 5 Wet Pond Worksheet 5 Outlet Protection Calculations 5 Stormwater Supplement Forms 5 Stormwater Operations & Maintenance Agreement 6 Hydraulic Grade Line Calculations 7 Q10 Analysis 7 Q100 Analysis 7 Circle K—HSD Addition 2723051 Fayetteville, NC Project Number: 37630.130 Stormwater Narrative Project Background The Circle K— HSD Addition 2723051 project is located at 3123 Murphy Rd, Fayetteville, North Carolina. The property identification numbers (PINs) are 0468-26-5272 and 0468-36-1026. The site consists of approximately 6.27 acres and has an existing Circle K convenience store, gas canopy & parking. FIRM Panel 3720046800J indicates the site is located within a special flood hazard area (Zone AE). Proposed Project Description This project consists of expanding the existing development to include high speed diesel and associated truck parking & utilities. The proposed development will increase the onsite impervious cover from 0.94 ac to 2.17 ac (including 0.05 ac future impervious). Proposed Stormwater Management This site has a proposed wet pond to meet the NCDEQ stormwater requirements. To the maximum extent possible, the new BUA is directed toward the proposed wet pond. Stormwater Runoff Control One wet pond is proposed to improve the quantity and quality of stormwater runoff for the site in compliance with NCDEQ rules & regulations. The SCM has been designed for 85% TSS removal in accordance with the NCDEQ Minimum Design Criteria. TSS Removal The NCDEQ MDC requirement of 85% Total Suspended Solid removal requirement has been exceeded by the proposed wet pond facility. Methodology for Stormwater Modeling A pre-development and post-development hydrologic analysis was completed for the site using the SCS TR20 method. A hydraulic analysis was completed using Hydraflow modeling software to route these storm events through the proposed wet pond facility and outlet structure. Hydrology The SCS TR20 method was used to determine the peak discharge rates for the pre-development and post- development conditions, develop runoff hydrographs and size the detention storage for the SCM. Rainfall data used in the design was taken from published NOAA data. SCS runoff curve numbers were based on Table 2-2 in the TR55 manual. The Time of Concentration (Tc) values were determined using the TR55 method for sheet, shallow and concentrated flows, with a minimum Tc of 5 minutes. • • Sf TIMMONS GROUP 1 I www.timmons.com Y___.v111 VAN _IIIL'v LV [!tHV 4[I VVIt]. Circle K—HSD Addition 2723051 Fayetteville, NC Project Number: 37630.130 Hydraulics Computer simulated reservoir routing using Hydraflow modeling software was completed for the 1-year, 2-year, 10-year, 25-year, and 100-year storm events utilizing stage-storage and stage-discharge functions. Stage- storage was determined using the proposed grading contours of the detention system and stage-discharge functions were developed using the proposed outlet structures. The outlet structures were designed to attenuate the post-development discharge rates for the 1-year storm event equal to or less than pre- development levels. Pre & Post Development Runoff Summary Site Condition Storm Event (cfs) 1-year (cfs) 2-year (cfs) 10-year (cfs) 100-year (cfs) Pre-Development 5.620 8.868 20.67 44.72 Post-Development 9.130 12.68 25.00 49.25 without Detention Post Development 4.497 7.814 20.92 47.80 with Detention �••••.• • • TIMMONS GROUP 21 www.timmons.com YOUR VISION ACIIILVLO THROUGH OURS. Circle K—HSD Addition 2723051 Fayetteville, NC Project Number:37630.130 Reference Material NOAA Rainfall Data USGS Map FEMA Map Soil Survey Map Pre/Post Development Drainage Area Maps ••••s•• • TIMMONS GROUP 3 I www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. 1/24/24,9:45 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 "rt°` Location name: Eastover,North Carolina, USA* '�- ''* 1Latitude:35.0828°, Longitude:-78.7845° E nonn Elevation: 127 ft** i C *source:ESRI Map s "w '� e"T8°`' **source:USGS "'"'"`'� POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 1 Average recurrence interval(years) Duration 1 _ 2 5 10 25 50 _ 100 200 _ 500 1000 5-min 0.432 0.510 0.595 0.661 0.741 0.801 0.859 0.915 0.986 1.04 (0.392-0.479) (0.462-0.565) (0.540-0.659) (0.598-0.731) (0.667-0.818) (0.719-0.880) (0.767-0.943) (0.813-1.00) (0.868-1.08) (0.911-1.14) 10-min 0.690 0.815 0.953 1.06 1.18 1.28 1.36 1.45 1.56 1.64 (0.627-0.765) (0.739-0.903) (0.864-1.06) (0.956-1.17) (1.06-1.30) (1.14-1.40) (1.22-1.50) (1.29-1.59) (1.37-1.71) (1.44-1.80) 15-min 0.863 1.02 1 1.21 I 1.34 1.50 I 1.62 1.72 1.83 1.96 2.06 (0.783-0.956) (0.930-1.14) (1.09-1.34) (1.21-1.48) (1.35-1.65) (1.45-1.78) (1.54-1.89) (1.62-2.01) (1.73-2.15) (1.80-2.26) 30-min 1.18 1.42 1.71 1.94 2.22 2.43 2.64 2.85 I 3.12 3.33 (1.07-1.31) (1.28-1.57) (1.55-1.90) (1.75-2.14) (2.00-2.45) (2.18-2.67) (2.36-2.90) (2.53-3.12) (2.75-3.42) (2.92-3.66) 60-min 1.48 1.78 2.20 2.52 2.95 3.30 3.64 3.99 4.48 4.87 (1.34-1.63) (1.61-1.97) I (1.99-2.43) i (2.28-2.79) (2.66-3.26) 1 (2.96-3.62) 1 (3.25-4.00) (3.55-4.38) (3.95-4.91) (4.26-5.34) 2-hr 1.72 2.09 2.64 I 3.07 3.65 4.12 4.60 5.10 5.78 6.33 (1.53-1.98) (1.86-2.40) (2.34-3.02) (2.71-3.52) (3.21-4.19) (3.61-4.72) (4.01-5.27) (4.42-5.84) (4.96-6.61) (5.39-7.24) 3-hr 1.83 2.21 2.81 3.29 3.97 4.52 5.11 5.73 6.61 7.33 (1.63-2.11) (1.97-2.55) (2.49-3.23) (2.92-3.79) (3.49-4.56) (3.95-5.19) (4.44-5.86) (4.94-6.56) (5.63-7.57) (6.18-8.38) 6-hr 2.18 2.64 3.35 3.94 4.76 5.44 6.17 6.94 8.05 8.96 (1.95-2.47) (2.36-2.99) (2.99-3.79) (3.50-4.46) (4.20-5.37) (4.78-6.14) (5.37-6.94) (5.99-7.80) (6.85-9.03) (7.54-10.0) 12-hr 2.57 3.11 3.97 4.69 5.71 6.57 7.48 8.48 9.92 11.1 (2.30-2.90) (2.78-3.52) (3.54-4.49) (4.16-5.29) (5.02-6.41)_ (5.74-7.35) (6.48-8.36) (7.27-9.46) (8.38-11.1) (9.28-12.4) 24-hr 3.04 3.69 4.72 5.56 I 6.76 7.74 8.78 1 9.89 11.5 12.8 (2.82-3.30) (3.42-4.01) (4.37-5.13) (5.13-6.04) (6.20-7.33) (7.06-8.40) (7.97-9.53) (8.93-10.7) (10.3-12.5) (11.3-13.9) 2-day 3.52 4.26 5.40 6.33 7.65 8.72 9.86 11.1 12.8 14.2 (3.27-3.80) (3.96-4.60) (5.01-5.84) (5.86-6.84) (7.04-8.25) (7.99-9.41) (8.98-10.6) (10.0-12.0) (11.5-13.9) (12.6-15.4) 3-day 3.73 4.51 5.69 6.64 7.98 9.07 10.2 11.4 13.1 14.5 (3.48-4.02) (4.20-4.86) (5.28-6.12) I (6.16-7.14) I (7.36-8.58) (8.33-9.76) (9.33-11.0) I (10.4-12.3)I (11.8-14.2) (13.0-15.8) 4-day 3.95 4.76 5.97 6.95 8.31 9.42 10.6 11.8 I 13.5 14.9 (3.69-4.24) (4.45-5.12) (5.56-6.41) (6.45-7.45) (7.68-8.92) (8.67-10.1) (9.68-11.4) (10.7-12.7) (12.2-14.6) (13.4-16.2) 7-day 4.58 5.50 6.82 7.88 9.34 10.5 11.7 13.0 14.8 16.2 (4.27-4.93) (5.12-5.92) (6.34-7.35) (7.31-8.47) (8.63-10.0) (9.68-11.3) (10.8-12.6) (11.9-14.0) (13.4-16.0) (14.6-17.6) 10-day 5.24 6.27 7.65 8.73 10.2 11.4 I 12.6 13.8 15.5 16.9 (4.91-5.60) (5.87-6.70) (7.15-8.17) (8.15-9.32) (9.49-10.9) (10.6-12.2) (11.6-13.5) (12.7-14.8) (14.2-16.7) (15.3-18.2) 20-day 7.04 8.36 10.0 11.4 13.2 14.6 16.0 17.5 19.5 21.1 (6.62-7.51) (7.86-8.93) (9.42-10.7) (10.6-12.1) (12.3-14.0) (13.6-15.6) (14.9-17.1) (16.2-18.7) (17.9-20.9) (19.3-22.7) 30-day 8.78 10.4 12.3 13.7 15.6 17.1 18.6 20.1 22.1 23.6 (8.28-9.35) (9.79-11.1) (11.5-13.1) (12.9-14.6) (14.6-16.7) 1 (16.0-18.3) (17.3-19.9) (18.7-21.5) (20.4-23.7) (21.7-25.4) 45-day 11.1 13.1 15.2 16.9 19.0 20.6 22.3 23.9 26.0 27.6 (10.5-11.8) (12.4-13.9) (14.4-16.2) (15.9-17.9) (17.9-20.2) (19.4-21.9) (20.8-23.6) (22.3-25.4)I (24.1-27.7) (25.5-29.5) 60-day 13.4 15.7 18.1 19.9 22.2 23.9 25.7 27.4 29.6 31.2 (12.7-14.1) 1 (14.9-16.6) I (17.1-19.1) 1 (18.8-20.9) (21.0-23.4) I (22.6-25.3) I (24.1-27.1) (25.7-29.0) (27.6-31.4) (29.1-33.2) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0828&Ion=-78.7845&data=depth&units=english&series=pds 1/4 1/24/24,9:44 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 "rt°` Location name: Eastover,North Carolina, USA* '�� ''* Latitude:35.0828°, Longitude:-78.7845° E nonn Elevation: 127 ft**pIf i, C *source:ESRI Ma s , e"T8°`' **source:USGS •"`"ro.c. POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 5.18 6.12 7.14 7.93 8.89 9.61 10.3 11.0 11.8 12.5 (4.70-5.75) (5.54-6.78) (6.48-7.91) (7.18-8.77) (8.00-9.82) (8.63-10.6) (9.20-11.3) (9.76-12.0) (10.4-13.0) (10.9-13.7) 10-min 4.14 4.89 5.72 6.34 7.09 7.66 8.19 8.70 9.35 9.84 (3.76-4.59) (4.43-5.42) (5.18-6.34) (5.74-7.01) (6.38-7.82) (6.87-8.41) (7.31-8.99) (7.73-9.54) (8.24-10.3) (8.61-10.8) 15-min 3.45 4.10 4.82 5.35 5.99 6.46 6.90 7.32 7.85 8.24 (3.13-3.82) (3.72-4.54) (4.37-5.34) (4.84-5.92) (5.39-6.60) (5.80-7.10) (6.16-7.58) (6.50-8.02) (6.91-8.60) (7.20-9.04) 30-min 2.37 2.83 3.43 3.88 4.44 4.86 5.29 5.70 6.25 6.67 (2.15-2.62) (2.57-3.14) (3.11-3.80) (3.50-4.29) (3.99-4.89) (4.37-5.35) (4.72-5.80) (5.06-6.25) (5.50-6.84) (5.83-7.32) 60-min 1.48 1.78 2.20 2.52 2.95 3.30 3.64 3.99 4.48 4.87 (1.34-1.63) (1.61-1.97) (1.99-2.43) (2.28-2.79) (2.66-3.26) (2.96-3.62) (3.25-4.00) (3.55-4.38) (3.95-4.91) (4.26-5.34) 2-hr 0.859 1.04 1.32 1.53 1.82 2.06 2.30 2.55 2.89 3.16 (0.764-0.990) (0.928-1.20) (1.17-1.51) (1.36-1.76) (1.61-2.09) (1.81-2.36) (2.00-2.64) (2.21-2.92) (2.48-3.30)_ (2.69-3.62) 3-hr 0.608 0.736 0.934 1.10 1.32 1.51 1.70 1.91 2.20 2.44 (0.542-0.702) (0.655-0.850) (0.829-1.08) (0.971-1.26) (1.16-1.52) (1.32-1.73)_ (1.48-1.95) (1.64-2.18) (1.87-2.52) (2.06-2.79) 6-hr 0.363 0.441 0.559 0.657 0.794 0.909 1.03 1.16 1.34 1.50 (0.325-0.412) (0.394-0.499) (0.498-0.633) (0.585-0.744) (0.702-0.896) (0.797-1.02) (0.896-1.16) (0.999-1.30) (1.14-1.51) (1.26-1.68) 12-hr 0.213 0.258 0.329 0.389 0.473 0.545 0.621 0.703 0.823 0.923 (0.190-0.241) (0.230-0.291) (0.293-0.372) (0.345-0.438) (0.416-0.532) (0.476-0.610) (0.537-0.693) (0.603-0.784) (0.695-0.917) (0.769-1.02) 24-hr 0.126 0.153 0.196 0.231 0.281 0.322 0.365 0.411 0.477 0.531 (0.117-0.137) (0.142-0.167) (0.182-0.213) (0.213-0.251) (0.258-0.305) (0.294-0.349) (0.332-0.397) (0.372-0.447) (0.427-0.520) (0.472-0.580) 2-day 0.073 0.088 0.112 0.131 r 0.159 0.181 0.205 r 0.230 r 0.266 0.295 (0.068-0.079) (0.082-0.095) (0.104-0.121) (0.122-0.142)(0.146-0.171) (0.166-0.195) (0.186-0.221) (0.208-0.249) (0.238-0.288) (0.262-0.321) 3-day 0.051 0.062 0.079 0.092 0.110 0.125 0.141 0.158 0.182 0.201 (0.048-0.055) (0.058-0.067) (0.073-0.085) (0.085-0.099) (0.102-0.119) (0.115-0.135) (0.129-0.152) (0.144-0.171) (0.164-0.197) (0.180-0.219) 4-day 0.041 0.049 0.062 0.072 0.086 0.098 0.110 0.122 0.140 0.155 (0.038-0.044) (0.046-0.053) (0.057-0.066) (0.067-0.077) (0.080-0.092) (0.090-0.105) (0.100-0.118) (0.111-0.132) (0.127-0.152) (0.139-0.168) 7-day 0.027 0.032 0.040 0.046 0.055 0.062 0.069 0.077 0.088 0.096 (0.025-0.029) (0.030-0.035) (0.037-0.043) (0.043-0.050) (0.051-0.059) (0.057-0.067) (0.064-0.075) (0.070-0.083) (0.079-0.095) (0.086-0.104) 10-day 0.021 0.026 0.031 0.036 0.042 0.047 0.052 0.057 0.064 0.070 (0.020-0.023) (0.024-0.027) (0.029-0.034) (0.033-0.038) (0.039-0.045) (0.043-0.050) (0.048-0.056) (0.052-0.061) (0.059-0.069) (0.063-0.075) 20-day 0.014 0.017 0.020 0.023 0.027 0.030 0.033 0.036 0.040 0.043 (0.013-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.025) (0.025-0.029) (0.028-0.032) (0.030-0.035) (0.033-0.039) (0.037-0.043) (0.040-0.047)1 30-day 0.012 0.014 0.017 0.019 0.021 0.023 0.025 0.027 0.030 0.032 (0.011-0.012) (0.013-0.015) (0.016-0.018) (0.017-0.020) (0.020-0.023) (0.022-0.025) (0.024-0.027) (0.025-0.029) (0.028-0.032) (0.030-0.035) 45-day 0.010 0.012 0.014 0.015 0.017 0.019 0.020 0.022 0.024 0.025 (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.023) (0.022-0.025) (0.023-0.027) 60-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.020 I 0.021 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.023) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0828&Ion=-78.7845&data=intensity&units=english&series=pds 1/4 41-r' I !PP— 86 d� op ° 4 BAYWOOD ED OF�� VVV 'V ,0 0 DRAUGHON DV' 07 F • • Bus R .- _.„tM�iA"i° `H, 95 1.7""— I"i 85 ff ��# �RAyEastover `o (t) alr Reg EL4 % / 44; �; Airport '42 i 50 N i 84 -• I Brace P.ocosi, National Flood Hazard Layer FIRMette - FEMA _Legend 78°47'45"W 35°5'23"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT r Without Base Flood Elevation(BFE) I Zone A,V,A99 • r• SPECIAL FLOOD With BFE Or Depth Zone AE,AO,AH,VE,AR • , HAZARD AREAS Regulatory Floodway > le ~` • rIlli / 0.2%Annual Chance Flood Hazard,Areas �, ••• • of 1%annual chance flood with average �! depth less than one foot or with drainage • ♦ ' ..• ' areas of less than one square mile zone x Future Conditions 1%Annual 111 r ` Chance Flood Hazard zone x 41,1.. .a. illk?" �" Area with Reduced Flood Risk due to •4OTHER AREAS OF• Levee.See Notes.zonex >_. '.P- *' « 7FLOOD HAZARD ��� Area with Flood Risk due to Leveezone D _ "� NO SCREEN Area of Minimal Flood Hazard zonex ,/ + Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard ZoneD ,. AREA OF MINIMATF�^r� LOOD HAZARD - , �� Z ^ ti' GENERAL ----- Channel,Culvert,or Storm Sewer r STRUCTURES III 1 1 1 1 Levee,Dike,or Floodwall .9► V • • 0 20.2 Cross Sections with 1%Annual Chance TOWN OF• `EASTOVER Water Surface Elevation . • P TOWN + e- - - Coastal Transect Zone AEµs13 - Base Flood Elevation Line(BFE) EASTOVER Limit of Study /I itliteis 370425 r`. . . . • Jurisdiction Boundary .s --- Coastal Transect Baseline s�, tilitt • 37����� 1 , f ' r• OTHER - - Profile Baseline A40/f t i e• eff. 1� �7 I • /� FEATURES Hydrographic Feature ' •t� ` '. >>, Digital Data Available N 1• k 1 • N. FtC> No Digital Data Available • NO ft • MAP PANELS Unmapped ",. * • - �� `rit` / The pin displayed on the map is an approximate �� • ` �� c4,, / point selected by the user and does not represent 04 4 an authoritative property location. LA .* ' N. This map complies with FEMA's standards for the use of j digital flood maps if it is not void as described below. +• The basemap shown complies with FEMA's basemap fr • • accuracy standards �' 111 • ,�� • The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA.This map �V� /� was exported on 2/28/2024 at 5:32 PM and does not A \� reflect changes or amendments subsequent to this date and / , / time.The NFHL and effective information may change or (4/ tek% �� becomesupersededbynewdataovertime.41116 .1111111'1117 Q This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, 9 � / i legend,scale bar,map creation date,community identifiers, 1 1 / �c 78°47'8"W 35°4'S4"N FIRM panel number,and FIRM effective date.Map images for Feet 1.V 00o unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap Imagery Source:USGS National Map 2023 Custom Soil Resource Report m Map—Hydrologic Soil Group 701240 701280 701320 701360 701400 701440 701480 701520 701560 701600 701640 701680 35°5'13'N / _! •' A 5'13"N "4114111INStib6••...t • 1.-' i, . / , '/ii-N.',...._i / ,� ` y. 1 1 lilts IIIIIIIIIf / ",-0 ) Mb 144/Nmt, -V . • 2 r j Ts4..N.N 83? "a j' oil�Ma o)5ai-51oa bQ�aUM 1 mil ttko -3c2,aOQo 35°5'3"N ���fff . 35°5'3"N 701240 701280 701320 701360 701400 701440 701480 701520 701560 701600 701640 701680 3 3 4- Map Scale:1:2,100 if printed on A landscape(11"x 8.5")sheet. 4- Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 15 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 0 C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) CID 1:24,000. Soils D Soil Rating Polygons Warning:Soil Map may not be valid at this scale. A 0 Not rated or not available Enlargement of maps beyond the scale of mapping can cause I Water Features A/D misunderstanding of the detail of mapping and accuracy of soil 1 Streams and Canals line placement.The maps do not show the small areas of I I B Transportation contrasting soils that could have been shown at a more detailed I B/D scale. 1-FF Rails I C ^,/ Interstate Highways C/D Please rely on the bar scale on each map sheet for map ti US Routes measurements. D Major Roads Not rated or not available Source of Map: Natural Resources Conservation Service Local Roads Web Soil Survey URL: Soil Rating Lines Background Coordinate System: Web Mercator(EPSG:3857) • Ael Aerial Photography Maps from the Web Soil Survey are based on the Web Mercator . • A/D projection,which preserves direction and shape but distorts • B distance and area.A projection that preserves area,such as the Albers equal-area conic projection,should be used if more ....we B/D accurate calculations of distance or area are required. ✓ w c This product is generated from the USDA-NRCS certified data as • r C/D of the version date(s)listed below. . r D Soil Survey Area: Cumberland County,North Carolina • Not rated or not available Survey Area Data: Version 25,Sep 13,2023 Soil Rating Points A Soil map units are labeled(as space allows)for map scales 1:50,000 or larger. ▪ A/D ▪ B Date(s)aerial images were photographed: Apr 24,2022—May 9,2022 ▪ B/D The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 16 Custom Soil Resource Report Table—Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI LbB Lakeland-Urban land A 5.9 69.5% complex, 1 to 8 percent slopes Wo Woodington loamy sand A/D 2.6 30.5% Totals for Area of Interest 8.5 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff:None Specified Tie-break Rule: Higher 17 SCS Weighted Curve Numbers-Pre-Development �y DA 1.0(Analysis Point A) �_(\• O,R.- ,0 Category °CNi N(Ac) CNi xAi \- < (\> Lawns/Managed Open Space(A Soils) 68 0.50 34 �/O/\ .\� Impervious 98 0.93 91 ` �'�v 1.43 125 \N \ \ Ca- 1(C z Ai) = 88 (9 FA, DA 1.1(Analysis Point B) Category 'CNI Ai(Ac) CNi x Ai i e Lawns/Managed Open Space(A Soils) 68 0.93 63 \ \ \ Woods(A Soils) 30 0.09 3 \ \ Impervious 98 0.01 1 ry 1.03 67 i z�, it t 3 c= F(G,x Ai) = 65 a wa Z EAR sLL zry Q Q -m zW Lm c: DA 1.2(Analysis Point C) ,'n a u 1LL w Category *[Ni Ai(AC) [NizA; ,� - in 0 ' woods(A son:) 38 Ls7 47 Z/11iNiNit.„ • Woods(0 Soils) 77 1.77 136 F c a. Lawns/Managed Open Space(A Soils) 68 0.46 31 H '""li \ ` / Lawns/Managetl Open Space(D Soils) 89 0.01 1\ \ . / 3.81 216F kL \I \ FAQ � o /// \ C3lit C3, o�'L3 _ h^ - i --' > DATE /// i= ('� d `i ^� � ' .. \ 0 03/04/2024 /// /� �1.1�\ .-1TtJ _ _'--_ / /^1h1. ,I LEGEND N DRAWN By / i///// \\\\2 ' 4 E3� 332 // / e- /�// Q / i I� - - \ IMPERVIOUS AREA / ,/ / }, , ,' / / DESIGNED BY q� DA1.1-TO ANALYSIS POINT B i///'ii C �_\\" //' s •• 332 //$`��\ ' 11l11\\\ • ‘' / ' / ..V- VV0 BD ������ DRAINAGE AREA BOUNDARY /44 \ "g'! 1111 l �\„` tg :lit / \ • / ' 0� • CHECKED BY ANALYSIS POINT B- \\\ �'\ >ls3 P.BARBEAU //' \ '\ . `�\`\ / ' ,�'\, \ \ / / v- N /N m TIME OF CONCENTRATION • / .�Y',t�r. \';; o%�� ``\ WESTERN PROPERTY LINE- ' / \\\ \\`\\s \\ /a `�" I / , , " " ,� " " v- )'`fib v- ''�\' / (TC)PATH 'vs-, 1 \\\ an aue >\ ' / C ,L 1L ,L ' \ • • SCALE // // \/ ` \ \ ' \\ \`-" `-co--\ti /i////// ED1 >o/ ,_ v N N N v- N • AS SHOWN O Q- �.ryJ3 .s o'o oy \ 04 /' \ \\\ \ /, / //ii/ / , / ,� _loe. Y SOIL TYPE BOUNDARY / // (� /ll�. <, �' / I \ \ \`\�`\ \` ,ar////,//// * `(v3' /,L , 9. -� ..- ,L \ • \\ qe. j _ 7i / /9., Mw A v- y �J. "\� T • • • . 1 //'/ DA1.2-TO ANALYSIS POINT C v- v_ [\ / // 3 . qv� ,�0,N a'''''"oox ,�a,F®a.5. \ ` / ////�/// // ©-:// /v-/ v 'oaI o„op.<<s N r N ,` ,o o.TM aEOMErv.z .o v. / / • qF - ♦ / cmmnreo now \ / / /////' / / " 90 's os / y/ / -/ R s M\ \ �,. I l /// / *////,/i /, �a� / ,' El* /� v � 9. � \" . vim v- v- CL / // oz , oeNa�esr \y- ... \a .•6/ 1 / //1 iiti/i,/ / i / / v v- 9. v v- 9. F / / // / I y� „'esOz ezas.zrs 9n,i ,tt I 1 1 /// ,._ /0'k """V \c ,c \' / / v +e \ \'s.vcR 31 az c / a y ' I I -/,/i,// ' / / 1G 1c /� '< v- �\ v q1i/ / I /// vb' - ,c • v- ,t 4v3 U a`a'sds> / / / \\ 1 o. -` ����,yQ ` -I'i5+r �4ne \ I , \ /// / / ,G • ,L 1L 1L `1 , , , / ' a es sr 4111110 ` 3 I Y I ` �'� p ems. , , I °' FrORF I .• ( `E�,. / EY-,:v2c,:v-�k� " , v- � � 3 / I/ I ve \ / � -� u®aa, \ 'mod // /� 0' c N• 1L `�`�` '� z Q// 1 S• .. . -_---1 / , / '1<� +L ,� 1L' \c ,L \Lv. 1L / ® \ t o /' \ Ma qN \s \. • a�„o.,o az„� ,a. / 1c N w v_ N v_ N v_N N v. v-N re U >0 ~a' \ �, \0s ODY ,, ^ / i/ - / * � v m ANALYSIS � ' / v. � ;70j �� POINTC- z a Q o s\Ni I <, / ( N ©Nd *� EASTERN w Z_ 2 \ �t +F. �DA 1.0-TO ANALYSIS POINT A / '/ ] , 19' v_,r ''^^ r , J?s \ \t i> /I/ 3 �'� PROPERTY z v l Q m a s V ..� v v s, I % 4 O - �• _ / , 14 ,' �,//, 0,- m m' �` wt �` ,c • �` m v-m LINEL7 W z CC i \ � t //, # vi, • . F .. _117-' .4,, �/' k v-, , 1L \L 1L ,!- \L • `N \L `N 1L ,L Q Z C \ \\ , /-- \ 11J-- _ / ///' >' 1L ,�\L JL 1L`Z" 1L ,L Y- �" .�L�' 1L 1L 1L \L Z t/� W v a / L' IL LS 4s'1c \c vi ,c 1� ,� �c 1� \L 1L 1c Ic 3J IL.1 1 IY, „ „ v. \ �, «.1{g // `� �;' ,c ,c v- ,� v- , ea3 J w arc `\ \` / , '�b q6' �9� //;ry // V 1L 1L 1t,.� ,L �L �L V \L 1l. ,L �L �" °•�a, J O O a aU' Z•c4 rt.) a 0 i§ a \ \ Baia "i, < / / IL I ,� u. \c �. v- ,c y-‘2‘:\J TvTv-: o l 2j&. t ,F / jj4.,. ,/ / , tk"-pr: ,�i :: -- :�5 TC3 : 7134 - ;\:v )` �` : �c \` �c'� v :v_ --;:v--*v9:-v.v-v-v-v:v)9. v- v- vWNaq1i�Ay \ \ \ l � 4 l/ - ///< l\ � v+ V v- '� �w� ��`� soJ,�.,t,,^,,�1^C�E$ \��t'. �� � � � `� � ,��� � �,��� � ��� �� � � �`F�� V'� � � � ' OZ SAS <<r Q0,9 \ l %..� , /l/i//, I„ �, „/,_v- , ,v_1� , v'Oe v-v •v_ ," vc v"v- v• v-v. ," v- v ";� = t 1-",1111 L y i \ if \- '\ 1, \ \\ \ p:'o ae2_ANALYSIS POINT,A I` N N N`N 12 N N N N N N .•N N-N • -N 1� N N 1� - N N V.N N .-N N v_1,- ,z_ `_ V ,_ " v_ \ v_i v- v v- v-� v- v-� v-- � � ,cam � � � � ti� v cn GG \'2 • NL / / _•, K v_ Ir. V v_ Ic ,c m o • 1/. ' I t,? , '.. f, * '� 1v- ' ,L 'L`v-' V- ,v-••,L v_ , ' v-,v.v-' 1L v.v-' Ic, v- ' ,L, ' ,!-,G ' v- " v. v- ' ,L v- ' ,c v- v- ,c v- i c '^ \\\ # 1L '�' 1L '� ,c ,c ,�/ 1L 1L 1l. ,L 1c ,c IL ,t ,c Li JOB NO.vg, N o y \ \ \�. I ,`� 'L �1061 IL 1L � ,c ,c 'L�" 1L 'c 'L 'L " ,c ,L ,[ ,i Li '� >L'L ,� ,c'� 1, Ti \ s «* ) ON N y/ ,� - ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CUMBERLAND COUNTY, 37630.130= ` , sI- k ,� �10,L SHEET NO. `u 1/ *k *N v. \� �< NCDEQ,AND NCDOT STANDARDS,SPECIFICATIONS,AND DETAILS PRELIMINARY-NOT RELEASED FOR CONSTRUCTION __ S y 1 \\ =\\gi \ , \, . \ \.?k* N N N N 1L , N N " N ,L N " , N v- N • N v- N - ,- 'L ` v v-N N N N v' N 1c 1G 'L , N'c , , F E L SCS Weighted Curve Numbers-Post-Development ��P�� O\ DA 2.0(To Wet Pond) Category *CIA A(Ac) CNi x A a " `'O A'y Lawns/Managed Open Space(A Sails) 49 0.24 12 �� `-\ Impervious(Includes 0.05 ac future im pervious) 98 1.20 118 t .. �O: �v 0 \ 1.44 129 \\� E A. \ DA 2.1(Bypass to Analysis Point A) Category *CN; A(Ac) CN;x A, E Lawns/Managed Open Space(A Soils) 49 0.09 48 Impervious 98 0.95 93 \ \ D "E 1.04 98 E--, v I(GxAJ ir =3 C`= I A = 94 < y 3 u z m v v DA 2.2(To Analysis Point B) RN. O Category "CIA A,(Ac) CNl xA z ,.d_,'a', a Woods(A Soils) 30 0.09 3 -'"1. U \ a x \ \ \ Lawns/Managed Open Space(A Soils) 49 0.62 30 g g O LL w Impervious 98 0.02 2 , z-. Z \ • 0.73 35. . ''** / I A, gl.T.4 22 F a ♦ h \ , / DA 2.3(To Analysis Point C) ~ v z� 14 Category *cN, a(Ac) crrxa L4 \\\ * .TMLsrnv * \ Woods(A Soils) 30 0.85 26 y. Woods(D Soils) 77 1.67 129 0 �}� y, 'f III ®i%ex Lawns/Managed Open Space Soils) 49 _0.53 26 I- ,,<5 /�Y ,., > // Lawns/Managed Open Space(D Soils) 80 0.01 1 . '�' 1 3.06 181 \ • o oaw 4 / ti,;(2 C F(G x A) = e ir TO PATH SEW., • QI FA, 59 ANALYSIS POINT B- \ Q p C3d �• * * #** b' — > DATE WESTERN PROPERTY LINE d /^ ��\ \\ 03/04/2024 // i/-'\\ ©� _ Q,.Q / __ i \ DRAWN BY /// , / l i' _ 77011 Jy y^i V / /• /' X >A �! _, V`�A �� �/m m m ,��c '� �� CHECKED By r;:i P.BARBEAU /`.3`,Z i- /, ° \ �. / ` " 1� `V`o>,,\ / / / : < '� �c`� K \ SCALE P tiF 9 1 DA2.2-TO ANALYSIS POINT B ti • / _ A '2s� /'/ // I / , " �K // / O Q-/ • cs /�//////'i/ i� ' m N AS SHOWN /Q N' T �. ^ 's, °•F. / . ' //gym// 1 .,/vL v- q0 v- - n 'n // ///�� �l �xi o. / m " ���� ai/' 'i/ tt^" // /"i�M�y ` W "� � �`�� A T �/ l x A / /////,/i / i• 2 N N�7."Lx/b ,L b �A J. � / o s // /// co VAV l /ro �_ � x� /// /ice/ii'/ /h Q/" a x� row ac o"rs/� " �,�. ;;:.. nt OM ;;:; RY 70. 1/' • ONCENTRATION / �j, , 'z ,. / I® /,'/:// *',' v- \,(u v is is v-' v, �c ' (TC)PATH " / /�/ / , DA 2.0 TO WET POND ,'r •/ v.Y- m v.m v_v- v. Y- ' U \ / / 11 / SOIL TYPE BOUNDARY 7 P � � i lull -, // V ,,,, �/� �,� � `� ��� , \ " � , L / 1 i , \ I x / V 11 i`. ' 13 IL m ,c v_ �,\--‘.-. v- ,c''•" 'v'' /' / •.. C- v- '' v-,'"' ‘, v-''.v- v- v-\v- v-v-'''. V- 0 N Z Q o i ® A /i �\�Gz,m, ns� Ili 15 i, , s1 �, o 71 O �. ,/ �� v_ DA2.3-TO m W Q � z� �, O v ''^ I Ill//, // 1A ; v- m v- `� ANALYSIS POINT C t,, U > v W DA 2.1-TO ANALYSIS POINT Al /% "Or 11 r \N.A /� ,/' ,,- „.,/,,,,„',11 i l, , / /��v v., ""v. / . " v ..-.—m v- " "" Z . 0O Q \\ \� ? 0ir q6//•/ ,L �� ILK Z z m s. _ / 11 /// 110 ,,-t v- /�v'---or�v. v- " v�C v- ANALYSIS CZ CI) Q \\�-\ -,, O ,% i'' //, " � "v. "" " " , v "� " " POINTC- 0 Z �� �1 / �' % �� v "v wfi " " " " EASTERN Q �'' ' "/ ,‘-r-// A011111117-,../-- / / *�1� • i� �� PROPERTY J O \, � , � �/ ��� Q � 0 " " � "� ��� �� � LINE \ Q z Z Fl v — —//� s V 4. , (0, // "" ", "„� ,L� � -,, �y is is - , • m• � � ,p is m� , - s'a �J � w E orc \\ \ I - 7 N / /// 1L,- iL �L ,L v- v- 1L IL ,L ,L - , 1, O O m Cl- nU' i` / 4 • " is " " � � � ap• \ -� / ^ ' /, / 4 m " m /� " " " "m " �. 7 do � • i1 / ,ck "� v.v_ v. v., v. v_ ,� " " " v.mv. v- N ce W /1, ,c o. ,L " v- "`"• '� ,L " " "v." ""'� " " " "v. � v."" " "" v-v-- v- v- 0 N q I v �_ / � 'i , " • ,�3 " " F � a B ` \\` 15 1y " " " ,�o v�W • ,� vv." v. "'� v- " " " " ,� 4 O v. z 0 w ln 1- u M1 q 'QA \\ -114 -•^ J . / ,L v- �" • v._ " >O�_ • " ,L "• " " " " ,L " " 1 f V. ,-S',Q IS �� �/q ii ," "I" "v- v* v, v- " v. "" " " "" " " "v"" v- v• "• " " v " " "v- v. "v"" v. , 'STT, 1!► \ ANALYSIS POINT AC ,/,L w' v- v- v- tv.""" " "� v_ v.v- "'� v. ""� v.v. ' " v_" v v-"" ._ "" - v- v_ " v- t " " " � ' " E g z © C3� vg_ �m� � „k � m i v v ,v v m• y v m ,�v v mvi , , � � � , � � , 9 ` ........,,,,Aid-3 . I�\Y'� .awFy; /,L{�^`',� 1L 1L / ,G 1L 1L 1L 1L ,L v- >L ,� I� ,< E 5 \� ' Gks Nam " I YGv. "� " � ,L "� " �" " � "� "� ,� " " � �>< ,� " � ,gym 31 O " 1i„r,�0 yh V- , IL,cI" ,L 4" "v- ,,. 1L v- "• v - "v_ AIL ,L�L v " ,L v- " IL v a ,L - "v v " --' " 'v- ,L'L 'v- JOB NO. m Ti \ , sa - v- G t" "" " " 37630.130 3 ` \ \:., -.., v- cki ,L 9,,L" ",, " , ,L ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CUMBERLAND COUNTY, ' t o N \ '< " " 'v-v t < NCDEQ,AND NCDOT STANDARDS,SPECIFICATIONS,AND DETAILS PRELIMINARY-NOT RELEASED FOR CONSTRUCTION SHEETNO. §z L Circle K—HSD Addition 2723051 Fayetteville, NC Project Number: 37630.130 Peak Flow Analysis Hydraflow Report �..•••• • • • TIMMONS GROUP 4 1 www.timmons.com YOUR VISION ACHIwto THROUGH OURS. 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 c_rm1 5 EVPI 1i 14 V 15 Legend Hyd. Origin Description 1 SCS Runoff DA 1.0(Analysis Point A) 2 SCS Runoff DA 1.1 (Analysis Point B) 3 SCS Runoff DA 1.2(Analysis Point C) 5 Combine Total Pre-Development 7 SCS Runoff DA2.0(To Wet Pond) 8 Reservoir Wet Pond 9 SCS Runoff DA2.1 (Bypass to Analysis Point A) 10 Combine Analysis Point A Total 11 SCS Runoff DA2.2(To Analysis Point B) 12 SCS Runoff DA 2.3(To Analysis Point C) 14 Combine Total Post-Development 15 Combine Post-Development without Detention Project: Eastover NC - 2024-03-27.gpw Wednesday, 03/27/2024 Hydraflow Table of Contents Eastover NC-2024-03-27.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, DA 1.0 (Analysis Point A). 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, DA 1.1 (Analysis Point B) 6 Hydrograph No. 3, SCS Runoff, DA 1.2 (Analysis Point C) 7 TR-55 Tc Worksheet 8 Hydrograph No. 5, Combine, Total Pre-Development 9 Hydrograph No. 7, SCS Runoff, DA2.0 (To Wet Pond). 10 Hydrograph No. 8, Reservoir, Wet Pond 11 Hydrograph No. 9, SCS Runoff, DA2.1 (Bypass to Analysis Point A) 12 Hydrograph No. 10, Combine, Analysis Point A Total 13 Hydrograph No. 11, SCS Runoff, DA2.2 (To Analysis Point B) 14 Hydrograph No. 12, SCS Runoff, DA 2.3 ( To Analysis Point C) 15 TR-55 Tc Worksheet 16 Hydrograph No. 14, Combine, Total Post-Development 17 Hydrograph No. 15, Combine, Post-Development without Detention 18 2 - Year Summary Report 19 Hydrograph Reports 20 Hydrograph No. 1, SCS Runoff, DA 1.0 (Analysis Point A). 20 Hydrograph No. 2, SCS Runoff, DA 1.1 (Analysis Point B) 21 Hydrograph No. 3, SCS Runoff, DA 1.2 (Analysis Point C) 22 Hydrograph No. 5, Combine, Total Pre-Development 23 Hydrograph No. 7, SCS Runoff, DA2.0 (To Wet Pond). 24 Hydrograph No. 8, Reservoir, Wet Pond 25 Hydrograph No. 9, SCS Runoff, DA2.1 (Bypass to Analysis Point A). 26 Hydrograph No. 10, Combine, Analysis Point A Total 27 Hydrograph No. 11, SCS Runoff, DA2.2 (To Analysis Point B) 28 Hydrograph No. 12, SCS Runoff, DA 2.3 ( To Analysis Point C) 29 Hydrograph No. 14, Combine, Total Post-Development 30 Hydrograph No. 15, Combine, Post-Development without Detention 31 10 - Year Summary Report 32 Hydrograph Reports 33 Hydrograph No. 1, SCS Runoff, DA 1.0 (Analysis Point A) 33 Hydrograph No. 2, SCS Runoff, DA 1.1 (Analysis Point B) 34 Hydrograph No. 3, SCS Runoff, DA 1.2 (Analysis Point C) 35 Hydrograph No. 5, Combine, Total Pre-Development 36 Hydrograph No. 7, SCS Runoff, DA2.0 (To Wet Pond). 37 Hydrograph No. 8, Reservoir, Wet Pond 38 Contents continued... Eastover NC-2024-03-27.gpw Hydrograph No. 9, SCS Runoff, DA2.1 (Bypass to Analysis Point A) 39 Hydrograph No. 10, Combine, Analysis Point A Total 40 Hydrograph No. 11, SCS Runoff, DA2.2 (To Analysis Point B) 41 Hydrograph No. 12, SCS Runoff, DA 2.3 ( To Analysis Point C) 42 Hydrograph No. 14, Combine, Total Post-Development 43 Hydrograph No. 15, Combine, Post-Development without Detention 44 25 - Year Summary Report 45 Hydrograph Reports 46 Hydrograph No. 1, SCS Runoff, DA 1.0 (Analysis Point A) 46 Hydrograph No. 2, SCS Runoff, DA 1.1 (Analysis Point B) 47 Hydrograph No. 3, SCS Runoff, DA 1.2 (Analysis Point C) 48 Hydrograph No. 5, Combine, Total Pre-Development 49 Hydrograph No. 7, SCS Runoff, DA2.0 (To Wet Pond). 50 Hydrograph No. 8, Reservoir, Wet Pond 51 Hydrograph No. 9, SCS Runoff, DA2.1 (Bypass to Analysis Point A). 52 Hydrograph No. 10, Combine, Analysis Point A Total 53 Hydrograph No. 11, SCS Runoff, DA2.2 (To Analysis Point B) 54 Hydrograph No. 12, SCS Runoff, DA 2.3 ( To Analysis Point C) 55 Hydrograph No. 14, Combine, Total Post-Development 56 Hydrograph No. 15, Combine, Post-Development without Detention 57 100 - Year Summary Report 58 Hydrograph Reports 59 Hydrograph No. 1, SCS Runoff, DA 1.0 (Analysis Point A). 59 Hydrograph No. 2, SCS Runoff, DA 1.1 (Analysis Point B) 60 Hydrograph No. 3, SCS Runoff, DA 1.2 (Analysis Point C) 61 Hydrograph No. 5, Combine, Total Pre-Development 62 Hydrograph No. 7, SCS Runoff, DA2.0 (To Wet Pond). 63 Hydrograph No. 8, Reservoir, Wet Pond 64 Hydrograph No. 9, SCS Runoff, DA2.1 (Bypass to Analysis Point A). 65 Hydrograph No. 10, Combine, Analysis Point A Total 66 Hydrograph No. 11, SCS Runoff, DA2.2 (To Analysis Point B) 67 Hydrograph No. 12, SCS Runoff, DA 2.3 ( To Analysis Point C) 68 Hydrograph No. 14, Combine, Total Post-Development 69 Hydrograph No. 15, Combine, Post-Development without Detention 70 IDF Report 71 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 4.413 5.750 9.607 12.07 16.17 DA 1.0(Analysis Point A) 2 SCS Runoff 0.828 1.446 3.570 5.096 7.862 DA 1.1 (Analysis Point B) 3 SCS Runoff 0.752 2.161 8.195 12.86 21.56 DA 1.2(Analysis Point C) 5 Combine 1,2,3, 5.620 8.868 20.67 29.24 44.72 Total Pre-Development 7 SCS Runoff 4.787 6.139 10.01 12.47 16.57 DA2.0(To Wet Pond) 8 Reservoir i 7 0.690 2.044 6.211 9.930 14.42 Wet Pond 9 SCS Runoff 3.923 4.887 7.627 9.368 12.28 DA2.1 (Bypass to Analysis Point A) 10 Combine 8,9 3.947 5.785 12.86 18.11 26.15 Analysis Point A Total 11 SCS Runoff 1 0.006 0.078 0.941 1.718 3.238 DA2.2(To Analysis Point B) 12 SCS Runoff 0.927 2.250 7.389 11.29 18.48 DA 2.3(To Analysis Point C) 14 Combine 8,9, 11, 4.497 7.814 20.92 30.90 47.80 Total Post-Development 12, 15 Combine 7,9, 11, 9.130 12.68 25.00 33.72 49.25 Post-Development without Detention 12, Proj. file: Eastover NC- 2024-03-27.gpw Wednesday, 03/27/2024 Pond Report 12 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Pond No. 1 - Wet Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=110.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 110.00 3,916 0 0 1.00 111.00 4,489 4,203 4,203 2.00 112.00 5,023 4,756 8,959 3.00 113.00 5,585 5,304 14,263 4.00 114.00 6,170 5,878 20,140 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 1.00 0.00 0.00 Crest Len(ft) = 14.00 20.00 2.00 0.00 Span(in) = 24.00 1.00 0.00 0.00 Crest El.(ft) = 112.00 113.00 111.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 109.50 110.00 0.00 0.00 Weir Type = 1 Broad Rect --- Length(ft) = 50.15 0.50 0.00 0.00 Multi-Stage = Yes No Yes No Slope(%) = 1.00 1.00 0.00 n/a Riser Emergency Notch N-Value = .013 .013 .013 n/a Spillway Weir in Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Riser Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Riser Water ;ulvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control.Weir risers checked for orifice conditions(ic)and submergence(s). Barrel Quality Orifice Stage(ft) Stage/Discharge Elev(ft) 4.00 114.00 3.00 113.00 ir ____ 2.00 112.00 I 1.00 111.00 0.00 110.00 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 88.00 Total Q Discharge(cfs) 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.413 2 716 9,021 DA 1.0(Analysis Point A) 2 SCS Runoff 0.828 2 718 1,838 DA 1.1 (Analysis Point B) 3 SCS Runoff 0.752 2 722 3,567 DA 1.2(Analysis Point C) 5 Combine 5.620 2 718 14,427 1,2,3, Total Pre-Development 7 SCS Runoff 4.787 2 716 9,903 DA2.0(To Wet Pond) 8 Reservoir 0.690 2 728 9,595 7 111.21 5,216 Wet Pond 9 SCS Runoff 3.923 2 716 8,455 DA2.1 (Bypass to Analysis Point A) 10 Combine 3.947 2 716 18,049 8,9 Analysis Point A Total 11 SCS Runoff 0.006 2 798 201 DA2.2(To Analysis Point B) 12 SCS Runoff 0.927 2 722 3,515 DA 2.3(To Analysis Point C) 14 Combine 4.497 2 718 21,765 8,9, 11, Total Post-Development 12, 15 Combine 9.130 2 718 22,074 7,9, 11, Post-Development without Detention 12, Eastover NC - 2024-03-27.gpw Return Period: 1 Year Wednesday, 03/27/2024 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 1 DA 1.0 (Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 4.413 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 9,021 cuft Drainage area = 1.430 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.500 x 49)+(0.940 x 98)]/1.430 DA 1.0 (Analysis Point A) Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 1 Time (min) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. No. 1 DA 1.0 (Analysis Point A) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 58.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.69 0.00 0.00 Land slope (%) = 8.60 0.00 0.00 Travel Time (min) = 3.29 + 0.00 + 0.00 = 3.29 Shallow Concentrated Flow Flow length (ft) = 221.00 0.00 0.00 Watercourse slope (%) = 1.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.16 0.00 0.00 Travel Time (min) = 1.70 + 0.00 + 0.00 = 1.70 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 5.00 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 2 DA 1.1 (Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 0.828 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,838 cuft Drainage area = 1.030 ac Curve number = 65* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.940 x 49)+(0.070 x 98)]/1.030 DA 1.1 (Analysis Point B) Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 3 DA 1.2 (Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 0.752 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 3,567 cuft Drainage area = 3.810 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 1.2 (Analysis Point C) Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 .1111 0.00 . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 8 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. No. 3 DA 1.2 (Analysis Point C) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.69 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 5.24 + 0.00 + 0.00 = 5.24 Shallow Concentrated Flow Flow length (ft) = 485.00 0.00 0.00 Watercourse slope (%) = 2.20 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.39 0.00 0.00 Travel Time (min) = 3.38 + 0.00 + 0.00 = 3.38 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 8.60 min 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 5 Total Pre-Development Hydrograph type = Combine Peak discharge = 5.620 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 14,427 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 6.270 ac Total Pre-Development Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 T 3.00 2.00 2.00 1.00 1.00 0.00 = — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 7 DA2.0 (To Wet Pond) Hydrograph type = SCS Runoff Peak discharge = 4.787 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 9,903 cuft Drainage area = 1.440 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.0 (To Wet Pond) Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 1 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — J 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 7 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 0.690 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 9,595 cuft Inflow hyd. No. = 7 - DA2.0 (To Wet Pond) Max. Elevation = 111.21 ft Reservoir name = Wet Pond Max. Storage = 5,216 cuft Storage Indication method used. Wet Pond Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 \hi* 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 5,216 cuft 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 9 DA2.1 (Bypass to Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 3.923 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,455 cuft Drainage area = 1.040 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1 (Bypass to Analysis Point A) Q (cfs) Hyd. No. 9-- 1 Year Q (cfs) 4.00 - 4.00 3.00 - 3.00 • 2.00 - 2.00 1.00 1.00 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 10 Analysis Point A Total Hydrograph type = Combine Peak discharge = 3.947 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 18,049 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 1.040 ac Analysis Point A Total Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 — 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 10 — Hyd No. 8 Hyd No. 9 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 11 DA2.2 (To Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 0.006 cfs Storm frequency = 1 yrs Time to peak = 798 min Time interval = 2 min Hyd. volume = 201 cuft Drainage area = 0.730 ac Curve number = 49 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2 (To Analysis Point B) Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 r-- --- -----1 0.00 - 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 12 DA 2.3 ( To Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 0.927 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 3,515 cuft Drainage area = 3.060 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 2.3 ( To Analysis Point C) Q (cfs) Hyd. No. 12 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 16 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. No. 12 DA 2.3 ( To Analysis Point C) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.69 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 5.24 + 0.00 + 0.00 = 5.24 Shallow Concentrated Flow Flow length (ft) = 345.00 0.00 0.00 Watercourse slope (%) = 2.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.70 0.00 0.00 Travel Time (min) = 2.13 + 0.00 + 0.00 = 2.13 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 7.40 min 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 14 Total Post-Development Hydrograph type = Combine Peak discharge = 4.497 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 21,765 cuft Inflow hyds. = 8, 9, 11, 12 Contrib. drain. area = 4.830 ac Total Post-Development Q (cfs) Hyd. No. 14 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 8 Hyd No. 9 Hyd No. 11 Hyd No. 12 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 15 Post-Development without Detention Hydrograph type = Combine Peak discharge = 9.130 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 22,074 cuft Inflow hyds. = 7, 9, 11, 12 Contrib. drain. area = 6.270 ac Post-Development without Detention Q (cfs) Hyd. No. 15-- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 7 Hyd No. 9 Hyd No. 11 Hyd No. 12 19 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.750 2 716 11,887 DA 1.0(Analysis Point A) 2 SCS Runoff 1.446 2 718 2,993 DA 1.1 (Analysis Point B) 3 SCS Runoff 2.161 2 720 6,764 DA 1.2(Analysis Point C) 5 Combine 8.868 2 718 21,643 1,2,3, Total Pre-Development 7 SCS Runoff 6.139 2 716 12,870 DA2.0(To Wet Pond) 8 Reservoir 2.044 2 724 12,559 7 111.45 6,338 Wet Pond 9 SCS Runoff 4.887 2 716 10,692 DA2.1 (Bypass to Analysis Point A) 10 Combine 5.785 2 718 23,252 8,9 Analysis Point A Total 11 SCS Runoff 0.078 2 720 535 DA2.2(To Analysis Point B) 12 SCS Runoff 2.250 2 720 6,354 DA 2.3(To Analysis Point C) 14 Combine 7.814 2 718 30,140 8,9, 11, Total Post-Development 12, 15 Combine 12.68 2 718 30,451 7,9, 11, Post-Development without Detention 12, Eastover NC - 2024-03-27.gpw Return Period: 2 Year Wednesday, 03/27/2024 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 1 DA 1.0 (Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 5.750 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 11,887 cuft Drainage area = 1.430 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.500 x 49)+(0.940 x 98)]/1.430 DA 1.0 (Analysis Point A) Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 6.00 I 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 1 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 2 DA 1.1 (Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 1.446 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,993 cuft Drainage area = 1.030 ac Curve number = 65* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.940 x 49)+(0.070 x 98)]/1.030 DA 1.1 (Analysis Point B) Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 2.00 2.00 1.00 - ' 1.00 0.00 - I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 3 DA 1.2 (Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 2.161 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 6,764 cuft Drainage area = 3.810 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 1.2 (Analysis Point C) Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 3.00 - 3.00 • • 2.00 - 2.00 • • 1.00 - • 1.00 • 0.00 k 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 5 Total Pre-Development Hydrograph type = Combine Peak discharge = 8.868 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 21,643 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 6.270 ac Total Pre-Development Q (cfs) Hyd. No. 5-- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 - 6.00 I 4.00 - 4.00 ::: 2.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 7 DA2.0 (To Wet Pond) Hydrograph type = SCS Runoff Peak discharge = 6.139 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 12,870 cuft Drainage area = 1.440 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.0 (To Wet Pond) Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 E 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 7 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 2.044 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 12,559 cuft Inflow hyd. No. = 7 - DA2.0 (To Wet Pond) Max. Elevation = 111.45 ft Reservoir name = Wet Pond Max. Storage = 6,338 cuft Storage Indication method used. Wet Pond Q (cfs) Hyd. No. 8 -- 2 Year Q (cfs) 7.00 7.00 6.00 I 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 6,338 cuft 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 9 DA2.1 (Bypass to Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 4.887 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 10,692 cuft Drainage area = 1.040 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1 (Bypass to Analysis Point A) Q (cfs) Hyd. No. 9-- 2 Year Q (cfs) 5.00 - , — 5.00 4.00 4.00 E 3.00 3.00 2.00 2.00 I 1.00 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 10 Analysis Point A Total Hydrograph type = Combine Peak discharge = 5.785 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 23,252 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 1.040 ac Analysis Point A Total Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 6.00 I 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hyd No. 8 Hyd No. 9 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 11 DA2.2 (To Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 0.078 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 535 cuft Drainage area = 0.730 ac Curve number = 49 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2 (To Analysis Point B) Q (cfs) Hyd. No. 11 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 12 DA 2.3 ( To Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 2.250 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 6,354 cuft Drainage area = 3.060 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 2.3 ( To Analysis Point C) Q (cfs) Hyd. No. 12 -- 2 Year Q (cfs) 3.00 - 3.00 • 2.00 - • 2.00 • 1.00 - • 1.00 • • 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 14 Total Post-Development Hydrograph type = Combine Peak discharge = 7.814 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 30,140 cuft Inflow hyds. = 8, 9, 11, 12 Contrib. drain. area = 4.830 ac Total Post-Development Q (cfs) Hyd. No. 14 -- 2 Year Q (cfs) 8.00 - 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 8 Hyd No. 9 Hyd No. 11 Hyd No. 12 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 15 Post-Development without Detention Hydrograph type = Combine Peak discharge = 12.68 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 30,451 cuft Inflow hyds. = 7, 9, 11, 12 Contrib. drain. area = 6.270 ac Post-Development without Detention Q (cfs) Hyd. No. 15-- 2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - 2.00 . 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 7 Hyd No. 9 Hyd No. 11 Hyd No. 12 32 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 9.607 2 716 20,455 DA 1.0(Analysis Point A) 2 SCS Runoff 3.570 2 718 7,139 DA 1.1 (Analysis Point B) 3 SCS Runoff 8.195 2 720 19,576 DA 1.2(Analysis Point C) 5 Combine 20.67 2 718 47,170 1,2,3, Total Pre-Development 7 SCS Runoff 10.01 2 716 21,651 DA2.0(To Wet Pond) 8 Reservoir 6.211 2 720 21,335 7 111.95 8,724 Wet Pond 9 SCS Runoff 7.627 2 716 17,205 DA2.1 (Bypass to Analysis Point A) 10 Combine 12.86 2 718 38,540 8,9 Analysis Point A Total 11 SCS Runoff 0.941 2 718 2,164 DA2.2(To Analysis Point B) 12 SCS Runoff 7.389 2 720 17,372 DA 2.3(To Analysis Point C) 14 Combine 20.92 2 718 58,077 8,9, 11, Total Post-Development 12, 15 Combine 25.00 2 718 58,392 7,9, 11, Post-Development without Detention 12, Eastover NC - 2024-03-27.gpw Return Period: 10 Year Wednesday, 03/27/2024 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 1 DA 1.0 (Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 9.607 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 20,455 cuft Drainage area = 1.430 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.00 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.500 x 49)+(0.940 x 98)]/1.430 DA 1.0 (Analysis Point A) Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 10.00 10.00 8.00 ( 8.00 6.00 - 6.00 4.00 - 4.00 2.00r°.../**---. 2.00 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 1 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 2 DA 1.1 (Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 3.570 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 7,139 cuft Drainage area = 1.030 ac Curve number = 65* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.940 x 49)+(0.070 x 98)]/1.030 DA 1.1 (Analysis Point B) Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 — 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 3 DA 1.2 (Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 8.195 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 19,576 cuft Drainage area = 3.810 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 1.2 (Analysis Point C) Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 5 Total Pre-Development Hydrograph type = Combine Peak discharge = 20.67 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 47,170 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 6.270 ac Total Pre-Development Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 21.00 I 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 ' 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 7 DA2.0 (To Wet Pond) Hydrograph type = SCS Runoff Peak discharge = 10.01 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 21,651 cuft Drainage area = 1.440 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.0 (To Wet Pond) Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 6.211 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 21,335 cuft Inflow hyd. No. = 7 - DA2.0 (To Wet Pond) Max. Elevation = 111.95 ft Reservoir name = Wet Pond Max. Storage = 8,724 cuft Storage Indication method used. Wet Pond Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 8,724 cuft 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 9 DA2.1 (Bypass to Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 7.627 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 17,205 cuft Drainage area = 1.040 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1 (Bypass to Analysis Point A) Q (cfs) Hyd. No. 9-- 10 Year Q (cfs) 8.00 - 8.00 6.00 ` 6.00 4.00 4.00 2.00 2.00 0.00 i--.7 -'---." . . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 10 Analysis Point A Total Hydrograph type = Combine Peak discharge = 12.86 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 38,540 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 1.040 ac Analysis Point A Total Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hyd No. 8 Hyd No. 9 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 11 DA2.2 (To Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 0.941 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,164 cuft Drainage area = 0.730 ac Curve number = 49 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2 (To Analysis Point B) Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 12 DA 2.3 ( To Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 7.389 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 17,372 cuft Drainage area = 3.060 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 5.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 2.3 ( To Analysis Point C) Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 8.00 - 8.00 6.00 6.00 4.00 4.00 2.00 - 2.00 0.00 - 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 14 Total Post-Development Hydrograph type = Combine Peak discharge = 20.92 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 58,077 cuft Inflow hyds. = 8, 9, 11, 12 Contrib. drain. area = 4.830 ac Total Post-Development Q (cfs) Hyd. No. 14 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 8 Hyd No. 9 Hyd No. 11 Hyd No. 12 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 15 Post-Development without Detention Hydrograph type = Combine Peak discharge = 25.00 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 58,392 cuft Inflow hyds. = 7, 9, 11 , 12 Contrib. drain. area = 6.270 ac Post-Development without Detention Q (cfs) Hyd. No. 15 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 ::: 4.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 15 Hyd No. 7 Hyd No. 9 Hyd No. 11 Hyd No. 12 45 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.07 2 716 26,087 DA 1.0(Analysis Point A) 2 SCS Runoff 5.096 2 718 10,229 DA 1.1 (Analysis Point B) 3 SCS Runoff 12.86 2 720 29,806 DA 1.2(Analysis Point C) 5 Combine 29.24 2 718 66,122 1,2,3, Total Pre-Development 7 SCS Runoff 12.47 2 716 27,384 DA2.0(To Wet Pond) 8 Reservoir 9.930 2 720 27,067 7 112.12 9,616 Wet Pond 9 SCS Runoff 9.368 2 716 21,413 DA2.1 (Bypass to Analysis Point A) 10 Combine 18.11 2 718 48,479 8,9 Analysis Point A Total 11 SCS Runoff 1.718 2 718 3,604 DA2.2(To Analysis Point B) 12 SCS Runoff 11.29 2 720 26,003 DA 2.3(To Analysis Point C) 14 Combine 30.90 2 718 78,086 8,9, 11, Total Post-Development 12, 15 Combine 33.72 2 718 78,404 7,9, 11, Post-Development without Detention 12, Eastover NC - 2024-03-27.gpw Return Period: 25 Year Wednesday, 03/27/2024 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 1 DA 1.0 (Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 12.07 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 26,087 cuft Drainage area = 1.430 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.00 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.500 x 49)+(0.940 x 98)]/1.430 DA 1.0 (Analysis Point A) Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - - 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 1 Time (min) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 2 DA 1.1 (Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 5.096 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 10,229 cuft Drainage area = 1.030 ac Curve number = 65* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.940 x 49)+(0.070 x 98)]/1.030 DA 1.1 (Analysis Point B) Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - s - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 3 DA 1.2 (Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 12.86 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 29,806 cuft Drainage area = 3.810 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 1.2 (Analysis Point C) Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 14.00 14.00 • 12.00 12.00 10.00 10.00 8.00 8.00 6.00 — — — 6.00 4.00 4.00 2.00 - - 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 5 Total Pre-Development Hydrograph type = Combine Peak discharge = 29.24 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 66,122 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 6.270 ac Total Pre-Development Q (cfs) Hyd. No. 5-- 25 Year Q (cfs) 30.00 I 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 7 DA2.0 (To Wet Pond) Hydrograph type = SCS Runoff Peak discharge = 12.47 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 27,384 cuft Drainage area = 1.440 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.0 (To Wet Pond) Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - 2.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 9.930 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 27,067 cuft Inflow hyd. No. = 7 - DA2.0 (To Wet Pond) Max. Elevation = 112.12 ft Reservoir name = Wet Pond Max. Storage = 9,616 cuft Storage Indication method used. Wet Pond Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 — 6.00 4.00 I - 4.00 2.00 2.00 0.00 -, — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 9,616 cuft 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 9 DA2.1 (Bypass to Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 9.368 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 21,413 cuft Drainage area = 1.040 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1 (Bypass to Analysis Point A) Q (cfs) Hyd. No. 9-- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 - 6.00 4.00 - 4.00 2.00r°°.°/*---- 2.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 10 Analysis Point A Total Hydrograph type = Combine Peak discharge = 18.11 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 48,479 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 1.040 ac Analysis Point A Total Q (cfs) Hyd. No. 10 --25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - `- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 10 Hyd No. 8 Hyd No. 9 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 11 DA2.2 (To Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 1.718 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 3,604 cuft Drainage area = 0.730 ac Curve number = 49 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2 (To Analysis Point B) Q (cfs) Hyd. No. 11 --25 Year Q (cfs) 2.00 2.00 1.00 - 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 12 DA 2.3 ( To Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 11.29 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 26,003 cuft Drainage area = 3.060 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 6.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 2.3 ( To Analysis Point C) Q (cfs) Hyd. No. 12 --25 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - - - 6.00 4.00 - 4.00 2.00 2.00 0.00 N 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 14 Total Post-Development Hydrograph type = Combine Peak discharge = 30.90 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 78,086 cuft Inflow hyds. = 8, 9, 11, 12 Contrib. drain. area = 4.830 ac Total Post-Development Q (cfs) Hyd. No. 14 --25 Year Q (cfs) 35.00 - 35.00 30.00 30.00 25.00 25.00 20.00T 20.00 15.00 15.00 10.00 10.00 5.00 5.00 r _ 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 8 Hyd No. 9 Hyd No. 11 Hyd No. 12 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 15 Post-Development without Detention Hydrograph type = Combine Peak discharge = 33.72 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 78,404 cuft Inflow hyds. = 7, 9, 11, 12 Contrib. drain. area = 6.270 ac Post-Development without Detention Q (cfs) Hyd. No. 15 --25 Year Q (cfs) 35.00 1 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 7 Hyd No. 9 Hyd No. 11 Hyd No. 12 58 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 16.17 2 716 35,681 DA 1.0(Analysis Point A) 2 SCS Runoff 7.862 2 716 15,892 DA 1.1 (Analysis Point B) 3 SCS Runoff 21.56 2 720 49,356 DA 1.2(Analysis Point C) 5 Combine 44.72 2 718 100,929 1,2,3, Total Pre-Development 7 SCS Runoff 16.57 2 716 37,118 DA2.0(To Wet Pond) 8 Reservoir 14.42 2 718 36,798 7 112.27 10,382 Wet Pond 9 SCS Runoff 12.28 2 716 28,519 DA2.1 (Bypass to Analysis Point A) 10 Combine 26.15 2 718 65,316 8,9 Analysis Point A Total 11 SCS Runoff 3.238 2 718 6,516 DA2.2(To Analysis Point B) 12 SCS Runoff 18.48 2 720 42,307 DA 2.3(To Analysis Point C) 14 Combine 47.80 2 718 114,139 8,9, 11, Total Post-Development 12, 15 Combine 49.25 2 718 114,460 7,9, 11, Post-Development without Detention 12, Eastover NC - 2024-03-27.gpw Return Period: 100 Year Wednesday, 03/27/2024 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 1 DA 1.0 (Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 16.17 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 35,681 cuft Drainage area = 1.430 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.00 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.500 x 49)+(0.940 x 98)]/1.430 DA 1.0 (Analysis Point A) Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 18.00 - - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 1 Time (min) 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 2 DA 1.1 (Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 7.862 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 15,892 cuft Drainage area = 1.030 ac Curve number = 65* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(0.940 x 49)+(0.070 x 98)]/1.030 DA 1.1 (Analysis Point B) Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 8.00 - p 8.00 6.00 ( 6.00 4.00 4.00 2.00 - 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 3 DA 1.2 (Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 21.56 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 49,356 cuft Drainage area = 3.810 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 1.2 (Analysis Point C) Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 - 12.00 8.00 8.00 4.00 4.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 5 Total Pre-Development Hydrograph type = Combine Peak discharge = 44.72 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 100,929 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 6.270 ac Total Pre-Development Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 7 DA2.0 (To Wet Pond) Hydrograph type = SCS Runoff Peak discharge = 16.57 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 37,118 cuft Drainage area = 1.440 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.0 (To Wet Pond) Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 1 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 8 Wet Pond Hydrograph type = Reservoir Peak discharge = 14.42 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 36,798 cuft Inflow hyd. No. = 7 - DA2.0 (To Wet Pond) Max. Elevation = 112.27 ft Reservoir name = Wet Pond Max. Storage = 10,382 cuft Storage Indication method used. Wet Pond Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 10,382 cuft 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 9 DA2.1 (Bypass to Analysis Point A) Hydrograph type = SCS Runoff Peak discharge = 12.28 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 28,519 cuft Drainage area = 1.040 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1 (Bypass to Analysis Point A) Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - - 2.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 9 Time (min) 66 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 10 Analysis Point A Total Hydrograph type = Combine Peak discharge = 26.15 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 65,316 cuft Inflow hyds. = 8, 9 Contrib. drain. area = 1.040 ac Analysis Point A Total Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs) 28.00 - 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 i 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) — Hyd No. 10 - Hyd No. 8 Hyd No. 9 67 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 11 DA2.2 (To Analysis Point B) Hydrograph type = SCS Runoff Peak discharge = 3.238 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 6,516 cuft Drainage area = 0.730 ac Curve number = 49 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2 (To Analysis Point B) Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 — 2.00 1.00 1.00 0.00 — J s — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 11 68 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 12 DA 2.3 ( To Analysis Point C) Hydrograph type = SCS Runoff Peak discharge = 18.48 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 42,307 cuft Drainage area = 3.060 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 8.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 2.3 ( To Analysis Point C) Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 , . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 69 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 14 Total Post-Development Hydrograph type = Combine Peak discharge = 47.80 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 114,139 cuft Inflow hyds. = 8, 9, 11 , 12 Contrib. drain. area = 4.830 ac Total Post-Development Q (cfs) Hyd. No. 14 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 14 Hyd No. 8 Hyd No. 9 Hyd No. 11 Hyd No. 12 70 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Hyd. No. 15 Post-Development without Detention Hydrograph type = Combine Peak discharge = 49.25 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 114,460 cuft Inflow hyds. = 7, 9, 11 , 12 Contrib. drain. area = 6.270 ac Post-Development without Detention Q (cfs) Hyd. No. 15 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 : : - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 15 Hyd No. 7 Hyd No. 9 Hyd No. 11 Hyd No. 12 71 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/27/2024 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 65.1414 12.6000 0.8832 2 73.3619 12.5000 0.8681 3 0.0000 0.0000 0.0000 5 79.9135 12.9000 0.8376 10 81.4959 12.7000 0.8110 25 73.0190 11.5000 0.7516 50 61.5350 9.8000 0.6891 100 59.4652 9.3000 0.6591 File name:37630-130 Eastover NC.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.17 4.15 3.48 3.00 2.65 2.37 2.15 1.97 1.82 1.69 1.58 1.48 2 6.11 4.92 4.13 3.57 3.15 2.83 2.57 2.36 2.18 2.02 1.89 1.78 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.13 5.80 4.92 4.28 3.81 3.43 3.13 2.88 2.67 2.49 2.33 2.20 10 7.93 6.48 5.51 4.82 4.29 3.88 3.55 3.27 3.04 2.84 2.67 2.52 25 8.88 7.28 6.22 5.46 4.89 4.44 4.08 3.78 3.52 3.30 3.12 2.95 50 9.61 7.86 6.73 5.93 5.33 4.86 4.48 4.16 3.90 3.67 3.47 3.30 100 10.30 8.45 7.26 6.42 5.79 5.29 4.89 4.56 4.27 4.03 3.82 3.64 Tc=time in minutes.Values may exceed 60. Precip.file name:S:\332\43398-Wheeler_Tract\Calc\Stm\1_Hydraflow\43398.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.04 3.69 0.00 0.00 5.56 6.76 0.00 8.78 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Circle K—HSD Addition 2723051 Fayetteville, NC Project Number:37630.130 SCM Design Calculations Wet Pond Worksheet Outlet Protection Calculations Stormwater Supplement Forms .•••s•• • TIMMONS GROUP 51 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Circle K-HSD Addition 2723051 Project No.: 37630.130 Calculated By: April Blye Date: 03/28/2024 Wet Pond Design Calculations SCM 1 Pollutant/Nutrient Removal Total Suspended Solids(TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post-Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 1.20 0.00 Impervious R/W 0.00 Managed Pervious 0.24 Wooded 0.00 Subtotal 0.00 Streets and SW Description Length Imp/Ft Total Area 0 0 0.00 0.00 Subtotal 0.00 Other Total to Pond 1.44 Pond Basin CN Grand Total 0.00 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool Impervious Area Acres (Forebay&Main Pond Combined) Offsite Impervious Area 0.00 Onsite Impervious Area 1.20 Average Depth(ft)= 3.0 Total Impervious Area 1.20 SA/DA Ratio= 3.02 Required SA(ft2)= 1,894 Total Drainage Area To SCM 1.44 SA as Shown(ft2)= 3,980 Percent Impervious Area 83% SA/DA Ratio from latest NCDENR BMP Manual SA/DA Pond Volumes and Areas (Below Permanent/Normal Pool) Elevation ' Main Forebay Depth Main Forebay Total (ft) Area(sf) Area(sf) (ft) Inc.Vol(cf) Inc.Vol(cf) Vol(cf) 103.0 Bottom of Sediment Storage 104.0 87 - 0.0 Top of Sediment Storage 105.0 279 1.0 183 0 183 106.0 585 20 2.0 432 10 625 107.0 942 100 3.0 764 60 1,449 108.0 1,345 208 4.0 1,144 154 2,746 109.0 1,796 353 5.0 1,571 281 4,597 110.0 3,193 787 6.0 2,495 570 7,662 Total 6.0 6,587 1,075 7,662 Verify the Forebay Volume Is Approximately(15%-20%)of the Permanent Pool Volume. 16% Water Quality and Quantity Volumes (Above Permanent/Normal Pool) Elevation Main Forebay Depth Inc Total Accum'Total (ft) Area(sf) Area(sf) (ft) Vol(cf) Vol(cf) 110.0 3,980 0.00 Permanent Pool Elevation Notes 111.0 4,480 - 1.00 4,230 4,230 WQE/TPE 112.0 5,002 - 2.00 4,741 8,971 113.0 5,546 - 3.00 5,274 14,245 114.0 6,113 - 4.00 5,830 20,075 - 0.00 0 20,075 - 0.00 0 20,075 0.00 0 20,075 Verify the Average Depth of Pool (Dave)-Equation 3. davg=[Vperm pool-[0.5 x Depth max over shelf X Perimeter perm pool X Width submerged part of shelf]/Abottom of shelf Vperm= 6,587 C.F.(Main Pond) Abottom shelf= 1,796 S.F.(Main Pond) Depth of Water over shelf 1.0 FT Perimeter perm pool= 293 L.F.(Main Pond) Width submerged part of shelf= 6.0 FT Davg= 3.18 FT Depth for SA/DA= 3.00 FT(Round Da,down to nearest 0.5 ft) 1.0"Water Quality Runoff Volume Calculation Using the runoff volume calculations in the"Simple Method"as described by Schueler(1987) Where: Rv= Runoff Coefficient, in/in I=Percent Impervious 1= 83.3% Rv=0.05+0.009(1) Rv= 0.800 1.0 inch runoff volume(Required) Runoff volume,S=(Design rainfall)(Rv)(Drainage Area) Design Rainfall= 1.0 inch Drainage Area= 1.44 acres Storage Required= 4,182 cu.ft. Volume Storage For 1.0" Runoff Above Permanent Pool (Provided) Depth PPE SA(SF) Top Temp Pool SA(SF) Volume(CF) Elevation 1.00 3,980 4,480 4,230 111.00 Size Water Quality Orifice for(2-5) Day Drawdown for 1" Runoff Volume Q,.,=CdA(2gh)1R2 (Orifice Equation;Cd=0.60) 1.00 Orfice Diameter(inches) 0.32 Driving Head to Centroid of Orfice(ft)(H/3) 0.01 Q1.0"Drawdown Rate(cfs) 4,230 Water Quality Volume(VwQ) VwQ/(Q1"x 86,400) Drawdown Time(days) 3.3 Drawdown Time(days)(2-5 days) Pond/Riser Data& Elevations Pond Type Wet Detention TSS Removal Top of Pond/Berm 114.00 ft Secondary Spillway Width 20.00 ft Bottom of Secondary Spillway 113.00 ft Top of Riser 112.00 ft Riser Type/Size 4x4 ft Top of Water Quality/Temp Pool Elev n/a ft Top of Shelf 110.00 ft Permanent Pool Elevation(Normal Pool) 110.00 ft Orifice Elevation&Size 110.00 ft 1.00 in Secondary Orifice Elevation&Size n/a ft n/a in Bottom of Shelf 109.00 ft Top of Sediment Storage/Pond Bottom 104.00 ft Bottom of Sediment Storage 103.00 ft (Min 1 ft) Invert Out of Riser 109.50 ft Outlet Pipe Size 24.00 in Diameter RCP Outlet Pipe Length&Slope 50.15 ft 1.00 % Downstream Outlet Elevation _ 109.00 ft 1 Yr Water Surface Elev/Peak Flow(CFS) 111.21 ft 0.69 CFS 10 Yr Water Surface Elev Peak Flow(CFS) 111.95 ft 6.21 CFS 25 Yr Water Surface Elev Peak Flow(CFS) 112.12 ft 9.93 CFS 100 Yr Water Surface Elev Peak Flow(CFS) 112.27 ft 14.42 CFS Pond Detail Top of Riser: 112.00 - 1 in Orifice Elev 110.00 10'Berm 114.00 Spillway 113.00 100 Yr 112.27 25 Yr 112.12 10 Yr 111.95 2 Yr 111.21 Pond Bottom 104.00 See Plan for A accurate outlet design Inv Out: 109.00 Diss Pad Perm Pool Sediment Bottom Invert Out: 109.50IL 50.15 LF of 24"RCP @ 110.00 103.00 ft Base: 108.50 1.00% Anti-Bouyancy Calculations for the Riser Structure Riser Dimensions Weight of Structure Displaced Volume Outside Width 5.00 ft Walls= 3,375 LBS V=LxWx(HT+Base)=C.F. Inside Width 4.00 ft Base= 3,750 LBS Outside Length 5.00 ft Displaced Water= Inside Length 4.00 ft C.F.*62.4 PCF=LBS Height 2.50 ft Outlet Pipe= 471 LBS Base Thick'(ft) 1.00 ft WQ Orifice= 1 LBS Add 15%Factor of Safety Wall Thick'(ft) 1.00 ft Ext Base(ft) 0.00 ft Weir#1 = 300 LBS V= 63 C.F. Areas Removed from Riser Weir#2= 0 LBS Disp.Water= 3,900 LBS Outlet Pipe 3.14 ft Weir#3= 0 LBS 15%F.S.= 585 LBS WQ Orifice 0.01 ft Weir#4= 0 LBS Orifice#1 2.00 ft Other#1 = 0 LBS Saftety Factor 62.90% Orifice#2 0.00 ft Orifice#3 0.00 ft Weight= 6,353 LBS Weight= 4,485 LBS Orifice#4 0.00 ft Precast Concrete Riser Structure to be 4 ft x 4 ft x 2.5 ft Tall,With a 1 ft Thick Concrete Other 0.00 ft Ballast ` ••••• PROJECT NAME • • 4 Circle K- HSD Addition 2723051 CALCULATED BY T I M M O N S GROUP PROJECT NUMBER Alex May ENGINEERING I DESIGN I TECHNOLOGY 37630.130 Pipe Outlet Protection (NYDOT Method) Structure Name: FES100 Pipe Diameter= 24 in From Fig. 8.06.c: ZONE = 2 Pipe Slope = 0.01 ft/ft Mannings n = 0.013 Rip Rap Class = B Velocity Flowing Full = 7.22 fps Apron Thickness = 18 in Apron Length = 12.0 ft Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: 1goppg•pg•gm 4•�•�•�•�•�•�•4 s Length Structure Name: FES102 Pipe Diameter= 24 in From Fig. 8.06.c: ZONE = 2 Pipe Slope = 0.009 ft/ft Mannings n = 0.013 Rip Rap Class = B Velocity Flowing Full = 6.85 fps Apron Thickness = 18 in Apron Length = 12.0 ft Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: S Y3 Length Structure Name: FES110 Pipe Diameter= 15 in From Fig. 8.06.c: ZONE = 1 Pipe Slope = 0.005 ft/ft Mannings n = 0.013 Rip Rap Class = A Velocity Flowing Full = 3.73 fps Apron Thickness = 12 in Apron Length = 5.0 ft Apron Width = 3xDia.= 3.8 ft From Fig. 8.06.e: ���••••••••••0 LATEST REVISION: 3/27/2024 3:39 PM SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Circle K-HSD Addition 2723051 2 Project Area(ac) 6.27 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 0 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 :Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Patrick Barbeau,PE 28 Organization: Timmons Group 29 Street address: 5410 Trinity Rd Suite 102 30 City,State,Zip: Raleigh,NC 27607 31 Phone numbers): 919-866-4512 32 Email: patrick.barbeau@timmons.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Ai�� CAR.. ("4 A, a-% ' 1 4(60-C SEALl i Signature of Designer • 27370 Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 4 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 N/A(Bypass N/A(Bypass N/A(Bypass 4 Type of SCM Wet Pond DA2.1) DA2.2) DA2.3) 5 Total drainage area(sq ft) 273058 62833 45158 31661 133406 6 Onsite drainage area(sq ft) 273058 62833 45158 31661 133406 7 Offsite drainage area(sq ft) 0 0 0 0 0 8 Total BUA in project(sq ft) 94261 sf 51875 sf 41585 sf 801 sf sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 94261 sf 51875 sf 41585 sf 801 sf sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 79099 sf 48155 sf 30944 sf sf sf -Sidewalk(sq ft) 2499 sf 1542 sf 156 sf 801 sf sf -Roof(sq ft) 10485 sf sf 10485 sf sf sf -Roadway(sq ft) sf sf sf sf sf -Future(sq ft) _ 2178 sf _ 2178 sf sf sf sf -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) _ 40715 sf 40114 sf 601 sf sf 17 Existing BUA that will be removed(sq ft) _ 551 sf 70 sf 481 sf 18 Percent BUA 35% _ 83% 92% 3% 0% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(cu ft) 4230 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 I 2 Minimum required treatment volu me cu ft) 4182 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes side slopes? Are the inlets,outlets,and receiving stream protected from erosion 7(10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? _ Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? _ Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 104.00 removal)(fmsl) i 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 105.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 109.00 23 Elevation of the permanent pool(fmsl) 110.00 _ 24 Elevation of the top of the vegetated shelf(fmsl) 110.00 _ 25 Elevation of the temporary pool(fmsl) 111.00 26 Surface area of the main permanent pool(square feet) 2495 27 Volume of the main permanent pool(cubic feet) 6587 cf 28 Average depth of the main pool(feet) _ 3.00 ft 29 Average depth equation used - Equation 3 30 If using equation 3,main pool perimeter(feet) 293.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 6.0 ft 32 Volume of the forebay(cubic feet) 1075 cf L33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 48 in 35 Design volume of SCM(cu ft) 4230 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 1 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) _ 40 Drawdown time for the temporary pool(days) 3.3 _ 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance(inches) 48 in 44 Depth of forebay at exit(inches) 36 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft _ 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? - 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? _ 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): 2 Circle K—HSD Addition 2723051 Fayetteville, NC Project Number: 37630.130 Stormwater Operations & Maintenance Agreement ,•••s•. . TIMMONS GROUP 6 I www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. Operation & Maintenance Agreement Project Name: Circle K - HSD Addition 2723051 Project Location: 3123 Murphy Rd, Fayetteville, NC 28312 Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include (check all that apply&corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 1 Location(s): Southeast corner of the property Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: _ Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present:_ No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Meredith Will Rice, Jr. Title &Organization: Vice President-Circle K Stores, Inc. Street address: 1100 Situs Court, Suite 100 City, state, zip: Raleigh, NC 27606 Phone number(s): 919-774-6700 Email: wrice@circlek.com L Signature: ,./, Date: a a 1/ I, olotvi F. kind , a Notary Public for the State of 0644C 2cc-,i.A3 County of \k6411StV(3 , do hereby certify that McWAW - O-e—, fr• personally appeared before me this -_- ___ day of cets Via,`4,1 l and acknowledge the due execution of the Operations and aintenance reement . `J r Witness my hand and official seal, \-- ROBIN F. ALFORD Notary Public, North Carolina Johnston County My Commission Expires April 23,2028 s Seal My commission expires 49rl1 A 01W STORM-EZ ' 2/27/2024 Version 1.5 O&M Agreement Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish - the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment - through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are - found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design depth for sediment where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. 1 Wet Pond Maintenance Requirements(Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. The main treatment area Algal growth covers over 50% of the area. Consult a professional to remove and control the algal growth. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide(do not spray). 50% of the basin surface. Best professional practices show that pruning is Prune according to best professional practices. needed to maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one- or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a gg g location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. Wet Pond Maintenance Requirements(Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND 1 Permanent Pool El. 111 Permanent Pool El. 111 Temporary Pool El: 112 Temporary Pool El: 112 Pretreatment other Clean Out Depth: 5 Clean Out Depth: 7 than forebay? No Sediment Removal El 106 Sediment Removal El 104 Has Veg.Filter? No Bottom Elevation: 107 Bottom Elevation: 105 ATTACH ADDITIONAL SHEETS IF NECESSARY 1 Circle K—HSD Addition 2723051 Fayetteville, NC Project Number:37630.130 Hydraulic Grade Line Calculations Q10 Analysis Q100 Analysis .•••••• • TIMMONS GROUP 71 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan CB107B CB107A CB108 4 5 CB106 3 CB105 2 Outfall OCS101 ■ 1 • Outfall Project File: 37630.130 2024-03-27.stm Number of lines:6 Date: 3/27/2024 Storm Sewers v2023.00 Storm Sewer Tabulation 10-YEAR Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To [nor Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 50.148 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 2.04 22.58 3.91 24 1.00 109.00 109.50 109.41 110.00 111.00 113.00 101-100 2 End 23.153 0.01 1.28 0.95 0.01 1.22 5.0 6.3 6.9 8.35 21.02 2.66 24 0.86 107.00 107.20 110.00 110.03 109.25 116.66 105-outfall 3 2 88.861 0.24 1.15 0.95 0.23 1.09 5.0 5.3 7.2 7.84 9.96 4.44 18 0.90 107.70 108.50 110.15 110.65 116.66 113.55 106-105 4 3 76.092 0.45 0.91 0.95 0.43 0.86 5.0 5.0 7.3 6.27 6.62 5.11 15 1.05 108.70 109.50 110.80 111.52 113.55 113.50 107-106 5 2 51.517 0.12 0.12 0.95 0.11 0.11 5.0 5.0 7.3 0.83 17.99 1.77 15 7.76 108.00 112.00 110.15 112.36 116.66 116.77 108-105 6 4 5.130 0.46 0.46 0.95 0.44 0.44 5.0 5.0 7.3 3.18 12.75 2.59 15 3.90 109.60 109.80 111.72 111.73 113.50 113.55 107B-107A Project File: 37630.130 2024-03-27.stm Number of lines:6 Run Date: 3/27/2024 NOTES:Intensity=71.44/(Inlet time+12.30)A 0.80; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2023.00 Storm Sewer Profile 10-YEAR Proj. file: 37630.130 2024-03-27.stm o c _, O c Mo.; Elev. (ft) g w c,2 g Q o -ow o Li-0 m E j co E 121.00 121.00 118.00 . • 118.00 115.00 115.00 112.00 — 112.00 i i 109.00 50i1481...1-24"@ 1-0824 • 109.00 106.00 1 106.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile 10-YEAR Proj. file: 37630.130 2024-03-27.stm asN CO V Co C 7 C 7 C 7 C 7 Lf) J 0 C J 0 C J 0 C J 0 O• M B O O 71- �0 O ��co �co co O ,- N- , Orr O MCO 00 O M O)6) N MO) Elev. (ft) O "' 700 �00 W 700 M 70 O W N �� . CO . O) .`- O -6 W O L" iIi ,- u-' w W co o c co E c E co E c E i E c E co E c 124.00 124.00 120.00 - 120.00 116.00 IM 116.00 mr_ Ai ....._ 112.00 I- 112.00 11111111 76.09 - "Zc,1.05% _ma 108.00 108.00 I f?RRR11f-1: � �.'��0 . 30Lf-15"@ 3.90% 211 c i-24"@i I\86% 104.00 104.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile 10-YEAR Proj. file: 37630.130 2024-03-27.stm N 7 Lo j O J Q C J O M (gyp ' N- O p O ( �O N O o N- ,— (0 N.: N co cd (0 Elev. (ft) g w o N 7 o o o . w o W W W o w W as ,E j co E > ; as E > 128.00 128.00 123.00 - - • • • 123.00 118.00 118.00 113.00 113.00 51.;170-15„ C 7.76% •' 108.00 108.00 23.153Lf-24"@ 0.86% 103.00 103.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Tabulation 100-YEAR Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To [nor Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 50.148 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 14.42 22.58 6.96 24 1.00 109.00 109.50 110.16 110.87 111.00 113.00 101-100 2 End 23.153 0.01 1.28 0.95 0.01 1.22 5.0 6.0 8.6 10.50 21.02 3.34 24 0.86 107.00 107.20 110.00 110.05 109.25 116.66 105-outfall 3 2 88.861 0.24 1.15 0.95 0.23 1.09 5.0 5.2 8.9 9.78 9.96 5.53 18 0.90 107.70 108.50 110.24 111.01 116.66 113.55 106-105 4 3 76.092 0.45 0.91 0.95 0.43 0.86 5.0 5.0 9.0 7.81 6.62 6.36 15 1.05 108.70 109.50 111.25 112.36 113.55 113.50 107-106 5 2 51.517 0.12 0.12 0.95 0.11 0.11 5.0 5.0 9.0 1.03 17.99 1.95 15 7.76 108.00 112.00 110.24 112.40 116.66 116.77 108-105 6 4 5.130 0.46 0.46 0.95 0.44 0.44 5.0 5.0 9.0 3.95 12.75 3.22 15 3.90 109.60 109.80 112.68 112.69 113.50 113.55 107B-107A Project File: 37630.130 2024-03-27.stm Number of lines:6 Run Date: 3/27/2024 NOTES:Intensity=50.43/(Inlet time+9.00)^0.65; Return period=Yrs. 100 ; c=cir e=ellip b=box Storm Sewers v2023.00 Storm Sewer Profile 100-YEAR Proj. file: 37630.130 2024-03-27.stm c oar -' o Ma; Elev. (ft) g w7 Q o o -ow o ww as ,E j co E coo E cn EE 121.00 121.00 118.00 ' 118.00 115.00 ' 115.00 112.00 — 112.00 i 109.00 50.1481.1-24"@ 1-0824 . 109.00 106.00 106.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile 100-YEAR Proj. file: 37630.130 2024-03-27.stm N CCS ' 7Lo j O J Q E E o ' I� O 00 O � M CD. O O O ,- N- , OrW co ON Elev. (ft) g w o N 7 o O o -ow o Www o ww cO ,E j co E > ; as E > 128.00 128.00 123.00 - - • • • 123.00 118.00 ' 118.00 113.00 113.00 108.00 • • 108.00 23.153Lf4"@ 0.86% 103.00 - 103.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile 100-YEAR Proj. file: 37630.130 2024-03-27.stm f4 N CO V CO C 7 C 7 C 7 C 7 �J J 0 C J Q C J O C J 0 O• M B O O 71- L 0 O (CO �co O ,- N- ,- Orr O MWOo O co 0,O6 N M6) Elev. (ft) O O u7. C) 70 0 N . x—x— ( ‘—�00 067 00 0670 O _ ,- _ co O) — O -p W W W W + _W W W W 0 c o) E c E co E c E i E c E co E c 124.00 124.00 • • • • • • 120.00 - • 120.00 • • • • • • • 116.00 — 116.00 r - r� 112.00 — _�-- - 112.00 76.09 1.f15% ' 108.00 108.00 tZRRR11f-1: q. �.'��o — 5. 30Lf-15"@ 3.90% 211c31f-24"@I\86% 104.00 104.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) Storm Sewers