Loading...
HomeMy WebLinkAboutSW6240602_Emails_20241007 Beeker, Jacob I From: Beeker, Jacob I Sent: Monday, October 7, 2024 3:00 PM To: Richard Gee; Scott Brown; Susan Rosenblatt; Evan Hooker Cc: svc_post_construction_stormwater; Lawyer, Mike Subject: Re: SW6240602; Raeford Grove (Hoke) Good afternoon, The Division of Energy, Mineral and Land Resources received and accepted a State Stormwater Management Permit Application for the subject project on June 5th, 2024 and requested additional information on August 30th, 2024.A review of the file and delivery logs indicates that, as of this date,the information requested on August 30th, 2024 has not been received in this Office within the stipulated timeframe. Per Division policy and the requirements of Title 15A NCAC 02H .1042(3)(a)(ii)of the Stormwater Management Rules,this Office is hereby returning the subject application as incomplete.The application fee has been forfeited and new fee will need to be provided if you choose to resubmit this application in the future. The original signed Project Return letter is being mailed to the Applicant, Raeford MHP Development, LLC, at: Raeford MHP Development, LLC Attn: Raymond M.Gee, Manager 136 Main Street Pineville, NC 28134 The previously submitted application materials are being returned to(they may also be recycled,with permission)the engineer, C.Scott Brown, PE, at: 4D Site Solutions, Inc. Attn: C.Scott Brown, PE 409 Chicago Drive,Suite 112 Fayetteville, NC 28306 Please be aware that the construction of any impervious surfaces on the property prior to receipt of a stormwater permit, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality (919) 707-9214 Jacob.Beeker(a)deq.nc.gov oeaa�..a,EpDe Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Sent:Wednesday, August 28, 2024 3:44 PM To: Richard Gee<rchard@gvestcapital.com>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt 1 <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: Re: SW6240602; Raeford Grove (Hoke) Good afternoon, The required updated electronic files associated with the Raeford Grove project(SW6240602),which were requested on June 6, 2024, could not be found in the electronic repository. Please upload the files, as required by 15A NCAC 02H .1042(2). Electronic copies should be uploaded at the following Location: https://edocs.deq.nc.gov/Forms/SW-SuppLementaL-Upload To view the electronic repository, please see the following Link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources Thankyou, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality (919) 707-9214 Jacob.Beeker(abdeq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Thursday,June 6, 2024 3:15 PM To: Richard Gee<rchard@gvestcapital.com>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: SW6240602; Raeford Grove (Hoke) Good Afternoon, We received your post-construction stormwater permit application for the subject project on 6/5/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete.You can see where this project stands in the review queue by emailing postconstruction@deq.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https:Hedocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type.Additional file types can be entered into the electronic form by clicking on the"Add Another Post-Construction File Upload" link directly below the"State Stormwater Information Uploads" section of the form.YOU MUST CLICK ON THE"ADD ANOTHER POST-CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files(without adding additional file uploads)will upload all of the files as the last file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type.Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets(such as lighting plans, utility plans, striping plans,sight distance plans,etc...) as these files are not needed for review. Please type in permit#:SW6240602 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deq.nc.gov or at 919-707-3646. Thank you, 2 Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D7 E cl ; NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Richard Gee<rchard@gvestcapital.com> Sent:Wednesday,June 5, 2024 2:13 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Here you go Richard Gee 704-779-1298 From: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov> Date: Monday, June 3, 2024 at 1:04 PM To: Richard Gee <richard(@gyestcapitaLcom>, Scott Brown <sbrown(@4dsitesolutions.com>, Susan Rosenblatt<susan gyestcapital.com>, Evan Hooker<evanh _ mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction(@deq.nc.gov>, Farkas, Jim J <Jim.Farkas0bc1eq.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County NCSOS information, a signed letter from an executive of the company stating their title and position and giving them signature authority, etc. Let me know if you have a document but are unsure if it suffices. Thanks, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D7 E NORTH CAROLINA :.� Q Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3 From: Richard Gee<rchard@gvestcapital.com> Sent: Monday,June 3, 2024 1:00 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. What documents are sufficient for title verification Richard Gee 704-779-1298 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Monday,June 3, 2024 12:58:29 PM To: Scott Brown <sbrown@4dsitesolutions.com>; Richard Gee<rchard@gvestcapital.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County Good Afternoon, We received your application for a new post-construction stormwater permit on 5/14/24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items by close of business 6/7/24 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. 1x copy of official documentation of title and position for the applicant, Raymond M. Gee.This can be emailed into me. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). If you have any questions, please contact Kaitlin Peck at post-construction@nc.deq.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov D7 E Q: NORTH OAHOLINA Department of Environmental quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 From: Scott Brown <sbrown@4dsitesolutions.com> Sent:Thursday, April 25, 2024 11:49 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Richard Gee<rchard@gvestcapital.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Richard—send the documents to me and I will get them to Kaitlin Scott Brown, PE Professional Engineer office:910-426-6777 ext 102 1 cell:910-489-6731 1 fax:910-426-5777 On time,every time. www.4Dsitesolutions.com From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday, April 25, 2024 9:59 AM To: Richard Gee<rchard@gvestcapital.com>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County Richard, We have yet to receive your package and according to the tracking you provided, it has been "out for delivery' since 4/20. What is your plan for resubmitting? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D.- E Q:> NORTH CAROL NA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Richard Gee<rchard@gvestcapital.com> Sent: Monday, April 22, 2024 9:36 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Richard Gee 704-779-1298 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, April 22, 2024 9:13:11 AM To: Richard Gee<rchard@gvestcapital.com>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt 5 <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County Richard and Scott, Do you all have an update on this submittal? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D:;-,.E Q:> NORTH CAROL NA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farkas,Jim J <Jim.Farkas@deg.nc.gov> Sent:Thursday, April 18, 2024 4:14 PM To: Richard Gee<rchard@gvestcapital.com>; Peck, Kaitlin <kaitl in.peck@ deg.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt<susan@gvestcapital.com>; Evan Hooker <evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County See the original email in the chain. For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N.Salisbury Street, Office 640E Raleigh, NC 27604 USPS has a different address that they use for our mail for some reason. If you provide us with the tracking number, it may help us track down the package. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkasCa)deq.nc.gov 6 D_ E NORTH CAROLINA cl ; Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Richard Gee<rchard@gvestcapital.com> Sent:Thursday, April 18, 2024 4:09 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. What address should be used? I put what was provided in this email chain Richard Gee 704-779-1298 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday, April 18, 2024 3:11:21 PM To: Richard Gee<rchard@gvestcapital.com>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County Richard, We have not received this and it appears the wrong address for USPS was used. Can you send the entire tracking number? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D:;-,.E Q:> NORTH CAROL NA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Richard Gee<rchard@gvestcapital.com> Sent:Thursday, April 18, 2024 2:28 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. It arrived on Monday: 8 9 10 Richard Gee 704-779-1298 From: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov> Date:Thursday,April 18, 2024 at 2:23 PM To: Scott Brown <sbrown(a4dsitesolutions.com>, Richard Gee <richardC5bgvestcapital.com>, Susan Rosenblatt<susan gvestcapital.com>, Evan Hooker<evanh _ mhproperties.com> Cc: svc_post_construction_stormwater<postconstructionObdeq.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County Good Afternoon, Information for this project was due, 4/12/24. What is the update on this submittal? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D7 E Q:> NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Scott Brown <sbrown@4dsitesolutions.com> Sent: Friday, April 12, 2024 2:47 PM To: Richard Gee<rchard@gvestcapital.com>; Peck, Kaitlin <kaitl in.peck@ deg.nc.gov>; Susan Rosenblatt <susan@gvestcapital.com>; Evan Hooker<evanh@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. NCDEQ DWQ 512 N. Salisbury Street, Office 640E RALEIGH, NC 27604 Scott Brown, PE Professional Engineer office:910-426-6777 ext 102 1 cell:910-489-6731 1 fax:910-426-5777 On time,every time. www.4Dsitesolutions.com From: Richard Gee<rchard@gvestcapital.com> Sent: Friday, April 12, 2024 2:42 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Susan Rosenblatt<susan@gvestcapital.com>; Evan Hooker <evanh@mhproperties.com>; Scott Brown <sbrown@4dsitesolutions.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County Scott do you know? I need to mail this now Richard Gee 704-779-1298 11 From: Richard Gee <richard(Eb9yestcapitaLcom> Date: Friday,April 12, 2024 at 1:41 PM To: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov>, Susan Rosenblatt<susan - gvestcapitaLcom>, Evan Hooker<evanh _ mhproperties.com>, Scott Brown <sbrown0b4dsitesolutions.com>,Adam Martin <adam _ mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction(@deq.nc.gov> Subject: Re: [External] RE: Raeford Grove; Raeford, Hoke County Kaitlin,where can we mail the hard copies Richard Gee 704-779-1298 From: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov> Date:Thursday,April 11, 2024 at 3:47 PM To: Susan Rosenblatt<susan - gvestcapital.com>, Evan Hooker<evanh _ mhproperties.com>, Scott Brown <sbrown0b4dsitesolutions.com>,Adam Martin <adam _ mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction(@deq.nc.gov>, Richard Gee <richard0b9yestcapital.com> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County Thankyou! Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D:.,.E Q:> NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Susan Rosenblatt<susan@gvestcapital.com> Sent:Thursday, April 11, 2024 3:45 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Evan Hooker<evanh@mhproperties.com>; Scott Brown <sbrown@4dsitesolutions.com>;Adam Martin <adam@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Richard Gee<richard@gvestcapital.com> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. As promised, attached are the digital signatures for the O&M Agreement and Stormwater Management Permit Application. We will send originals along with official documentation for signer as well. Sincerely, Susan Rosenblatt Gvest Capital LLC 136 Main Street Pineville NC 28134 704.363.1368 12 susan@gvestcapital.com From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday, April 11, 2024 1:07 PM To: Evan Hooker<evanh@mhproperties.com>; Scott Brown <sbrown@4dsitesolutions.com>;Adam Martin <adam@mhproperties.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Richard Gee<richard@gvestcapital.com>; Susan Rosenblatt<susan@9vestcapital.com> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County All, The deadline to get items in by the end of today 4/11/24, please communicate your plans for moving forward and if you need a (max two week) extension or if you would like for me to return your project for you to resubmit. Thanks, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D7 E Q:> NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent:Tuesday,April 9, 2024 12:44 PM To: Evan Hooker<evanh@mhproperties.com>; Scott Brown <sbrown@4dsitesolutions.com>;Adam Martin <adam@mhproperties.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>; richard <richard@gvestcapital.com>; Susan Rosenblatt<susan@gvestcapital.com> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County For Clarity, the following items need to be updated: • Application o Section III, 1—Change to new signing official o Section X—Original, wet ink signature by new signing official and notarized. • Official documentation showing the title and position of the new signing official. • O&M Agreement with the new information and original, wet ink signature of new signing official and notarized. Let me know when you will be able to get this in to me by. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 13 � NORTH(-;AROLINA tl /) Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Evan Hooker<evanh@mhproperties.com> Sent:Tuesday,April 9, 2024 12:36 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>;Adam Martin <adam@mhproperties.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>; richard <richard@gvestcapital.com>; Susan Rosenblatt<susan@gvestca Pita l.com> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County You don't often get email from evanh@mhproperties.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. + Richard and Susan, please see Kaitlin's request Evan Hooker Manufactured Housing Properties Inc. 136 Main St.,Pineville,NC 28134 C:803-447-1222 evanh@mhproperties.com From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Tuesday,April 9, 2024 12:32 PM To: Evan Hooker<evanh@mhproperties.com>; Scott Brown <sbrown@4dsitesolutions.com>;Adam Martin <adam@mhproperties.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Raeford Grove; Raeford, Hoke County CAUTION:This email originated from outside of the organisation. Do not click links or open attachments unless you recognize the sender and know the content is safe. Scott and Evan, If Adam is no longer with the company, you will need to fix the signing official listed for the application in section III, 1a of the application and provide title and position information for the new signing official. (Including original signatures on the application.) When will you be able to get this into me by? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov 14 � NORTH(-;AROLINA tl /) Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Evan Hooker<evanh@mhproperties.com> Sent:Tuesday,April 9, 2024 12:22 PM To: Scott Brown <sbrown@4dsitesolutions.com>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov>;Adam Martin <adam@mhproperties.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: [External] RE: Raeford Grove; Raeford, Hoke County Some people who received this message don't often get email from evanh@mhproperties.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Scott, Please remove Adam as he is no longer with the company.Who have you been in contact with from MHP? Please tag them in this email going forward as I'm not sure who from the firm is handling. Evan Hooker ".. rp Manufactured Housing Properties Inc. 136 Main St.,Pineville,NC 28134 C:803-447-1222 evanh@mhproperties.com From: Scott Brown <sbrown@4dsitesolutions.com> Sent:Tuesday,April 9, 2024 12:19 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>;Adam Martin <adam@mhproperties.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: Raeford Grove; Raeford, Hoke County CAUTION:This email originated from outside of the organisation. Do not click links or open attachments unless you recognize the sender and know the content is safe. The planting detail for the vegetated shelf is on sheet C-6.1 on the original submittal set.We already discussed not needingthe deed restriction because the units are rental units not being subdivided.You shouldn't need anything else from me on this one. Scott Brown, PE Professional Engineer office:910-426-6777 ext 102 1 cell:910-489-6731 1 fax:910-426-5777 On time,every time. www.4Dsitesolutions.com From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Tuesday, March 12, 2024 1:32 PM To: adam@mhproperties.com; Scott Brown <sbrown@4dsitesolutions.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa<melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Raeford Grove; Raeford, Hoke County 15 Good Afternoon, We received your application for a new post-construction stormwater permit on 3/7/24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business 4/11/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x hard copies (one original) of the deed restriction document(This item is required per 15A NCAC 02H .1003(7), 15A NCAC 02H .1042(2)(k), and Sections VI, 2 &VII). More information can be found on our website: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-program/post- construction-program/post-construction-forms • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: o Landscape plan.This item is required by the MDCs for Infiltration Systems, Bioretention Cells, Wet Ponds, and Stormwater Wetlands and per 15A NCAC 02H .1051, .1052, .1053, & .1054. Please only provide the revised page. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 16 � NORTH CAROLINA tl /) Department of Environmental quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 17