HomeMy WebLinkAbout670039_Compliance Evaluation Inspection_20241007 Division of Water Resources
Facility Number E— eT - O Division of Soil and Water Conservation
O Other Agency
r
of Visit: Compliance Inspection Operation Review Q Structure Evaluation Q Technical Assistance
n for Visit: O Routine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access
Date of Visit: Arrival Time: Departure Time:=51�0 County: UnS,&W Region:
Farm Name: T� �) �/V� Owner Email:
Owner Name: ( I 5dowce Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
�
Onsite Representative: . Integrator,
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder Non-La er Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Ca acit Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Pouets
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? [:] Yes ZNo ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes o ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than frorn a discharge?
Page I of 3 511212020 Continued
Facility Number: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes [�No ❑ NA ❑ NE
a. if yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard(in): �
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �Io ❑ NA ❑ NE
(i.e., large trees, severe erosion,seepage,etc.) l
6, Are there structures on-site which are not property addressed and/or managed through a ❑ Yes L�d''�� ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes 2No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [1l0 [] NA ❑ NE
(not applicable to roofed pits,dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes to ❑ NA ❑ NE
maintenance or improvement?
Waste_Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes Eq"No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes Q'No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 13<0 ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes �o ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes BIN ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes []No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes E24 ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes [3 No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes 04o ❑ NA ❑ NE
the appropriate box.
❑WUP El Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes CDAo ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑JNo ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? [:] Yes F3'�N o ❑ NA ❑ NE
Page 2 of 3 5/1212020 Continued
Facility Number: jDate of Inspection: !J
24. Did the facility fail to calibrate waste application cyuipment as required by the permit? ❑ Yes ENo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes E]*No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [ 1Vo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes la 1<10' ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [2/No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? [:] Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes <11) ❑ NA ❑ N E
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes [ vo ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes WNo
o ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
k)o
104- r cl,
- �r_S
� IA-�� 1 a
� ►�
Reviewer/Inspector Name: hd66 n Phone: C �(� uZ— oc-6
Reviewer/Inspector Signature: Date:foll
/d p2dpZ
Page 3 of 3 511212020