Loading...
HomeMy WebLinkAboutSW5230902_Emails_20241007 Beeker, Jacob I From: Beeker, Jacob I Sent: Monday, October 7, 2024 12:28 PM To: jbenton@thenauco.com; tnau@thenauco.com; bobby@sumnerconstruction.com; jeakins@thenauco.com Cc: svc_post_construction_stormwater; Lawyer, Mike Subject: RE: SW5230902; Forest Hills (Franklin) Good afternoon, The Division of Energy, Mineral and Land Resources received and accepted a State Stormwater Management Permit Application for the subject project on September 15, 2023, and requested additional information on December 5th, 2023,April 2nd, 2024, and August 12th, 2024.A review of the file and delivery logs indicates that, as of this date,the information requested on April 2nd, 2024, and August 12th, 2024, has not been satisfactorily addressed within the stipulated timeframe. Per the requirements of Title 15A NCAC 02H .1042(3)(a)(ii) of the Stormwater Management Rules,this Office is hereby returning the subject application as incomplete.The application fee has been forfeited and a new fee will need to be provided if you choose to resubmit this application in the future. The original signed Project Return letter is being mailed to the Applicant, BC Sumner Investments, LLC, at: BC Sumner Investments, LLC Attn: Bobby Sumner, Owner PO Box 1011 Youngsville, NC 27549 The previously submitted application materials are being returned to (they may also be recycled,with permission)the engineer,Jon Eakins, PE, at: The Nau Company, PLLC Attn:Jon Eakins, PE PO Box 810 Rolesville, NC 27571 A brief description of the items that were originally requested in the prior Request for Additional Information Letters that were not addressed in the latest submission is outlined in the attached document. Please be aware that the construction of any impervious surfaces on the property prior to receipt of a stormwater permit, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality (919) 707-9214 Jacob.Beeker(a)deq.nc.gov oeoa�e.e.E.,pDa Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From:jbenton@thenauco.com <jbenton@thenauco.com> Sent: Monday, August 26, 2024 3:16 PM To: Holland, Brianna <brianna.holland@deq.nc.gov>;tnau@thenauco.com <tnau@thenauco.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: RE: [External] RE: SW5230902; Forest Hills (Franklin) You don't often get email from jbenton@thenauco.com. Learn why this is important F ION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message n located on your Outlook menu bar on the Home tab. Brianna, Following up. I am confident I provided you everything you need. Please let me know when you have time to discuss. From:jbenton@thenauco.com <jbenton@thenauco.com> Sent:Tuesday,August 20, 2024 1:05 PM To: 'Holland, Brianna' <brianna.holland@deq.nc.gov>;tnau@thenauco.com Cc: 'svc_post_construction_stormwater' <postconstruction@deq.nc.gov> Subject: RE: [External] RE: SW5230902; Forest Hills (Franklin) Brianna, Please let me know when you are available to discuss this project. From: Holland, Brianna <brianna.holland@deg.nc.gov> Sent: Monday, August 12, 2024 1:23 PM To: jbenton@thenauco.com;tnau@thenauco.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: RE: [External] RE: SW5230902; Forest Hills (Franklin) Good afternoon, I was reviewing this project and noticed that the electronic files are not up to date and are required per 15A NCAC 02H .1042(2). Please complete the repository.The PDFs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload.To view the existing repository,you can access this link: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources. Thank you, Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919)707-9218 brianna.holland@deq.nc.gov(email preferred) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address:512 North Salisbury Street, Raleigh, NC 27604 D E ; NORTH CAROLINA - ki Department o1 Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please direct all post-construction permitting questions and correspondences to our new group email address, postconstruction@deq.nc.gov From: jbenton@thenauco.com <ibenton@thenauco.com> Sent:Wednesday,June 5, 2024 1:57 PM To: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;tnau@thenauco.com 2 Cc:Valentine,Thad <thad.valentine@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: SW5230902; Forest Hills (Franklin) You don't often get email from ibenton@thenauco.com.Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thankyou sir. From: Farkas,Jim J <Jim.Farkas@deq.nc.gov> Sent:Wednesday,June 5, 2024 1:46 PM To: ibenton@thenauco.com;tnau@thenauco.com Cc:Valentine,Thad <thad.valentine@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: SW5230902; Forest Hills (Franklin) We will review the submission when the project comes up in the review queue. If the comments have been addressed,we will issue the permit. -Jim From: ibenton@thenauco.com <ibenton@thenauco.com> Sent:Wednesday,June 5, 2024 1:40 PM To: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;tnau@thenauco.com Cc:Valentine,Thad <thad.valentine@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: [External] RE: SW5230902; Forest Hills (Franklin) You don't often get email from ibenton@thenauco.com.Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mr. Farkas, Good afternoon.I am following up on SW5230902 Forest Hills.You mentioned when we met on May 14'i'2024,that you have 90 days to review. If there are only minor comments,can you please provide conditional approval?Please let me know if you need any additional information. Thank you for your time. From: Farkas,Jim J <Jim.Farkas@deq.nc.gov> Sent:Tuesday, May 14, 2024 3:18 PM To:Jon Eakins I The Nau Company, PLLC<ieakins@thenauco.com>; bobby@sumnerconstruction.com; tnau@thenauco.com; ibenton@thenauco.com Cc:Valentine,Thad <thad.valentine@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW5230902; Forest Hills (Franklin) We received the resubmission today. -Jim From: Farkas,Jim J Sent:Tuesday, May 7, 2024 2:32 PM To:Jon Eakins I The Nau Company, PLLC<ieakins@thenauco.com>; bobby@sumnerconstruction.com; tnau@thenauco.com Cc:Valentine,Thad <thad.valentine@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW5230902; Forest Hills (Franklin) As of 5/7/2024,we have not received the information requested on April 2,2024. Please provide this information by close of business on Tuesday, May 14, 2024 or the project will be returned due to inactivity in accordance with 15A NCAC 02H .1042(3)(a)(ii). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkas@deq.nc.9ov 3 NORTH CAROLINA - kl ; Depariment of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farkas,Jim J Sent:Tuesday,April 2, 2024 4:11 PM To: 'Jon Eakins I The Nau Company, PLLC' <jeakins@thenauco.com>; 'bobby@sumnerconstruction.com' <bobby@sumnerconstruction.com> Cc:Valentine,Thad <thad.valentine@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW5230902; Forest Hills (Franklin) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on January 4, 2024. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasCEbdeq.nc.gov ki ; D E NORTH CAROLINA - Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farkas,Jim J Sent:Tuesday, December 5, 2023 9:35 AM To:Jon Eakins I The Nau Company, PLLC<jeakins@thenauco.com>; bobby@sumnerconstruction.com Cc:Valentine,Thad <thad.valentine@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW5230902; Forest Hills (Franklin) Good Morning, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on September 15, 2023. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deg.nc.gov 4 NORTH CAROLINA - kl ; Depariment o1 Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Sent: Friday, September 15, 2023 9:53 AM To:Jon Eakins I The Nau Company, PLLC<jeakins@thenauco.com>; bobby@sumnerconstruction.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Valentine,Thad <thad.valentine@deq.nc.gov> Subject: SW5230902; Forest Hills (Franklin) Good Morning, We received your post-construction stormwater permit application for the subject project on 9/15/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW5230902 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov vc���D7 E NORTH CAROLINA :.� Q Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 5 From:Jon Eakins I The Nau Company, PLLC<jeakins@thenauco.com> Sent: Friday, September 15, 2023 9:34 AM To: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: bobby@sumnerconstruction.com; Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Valentine,Thad <thad.valentine@deq.nc.gov> Subject: Re: [External] Re: Forest Hills; Louisburg, Franklin County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. oops -please use the attached page in lieu of the one just sent... Jon Eakins, PE Office:919-435-6395 Extension 4 Mobile:919-616-4716 www.thenauco.com On Fri, Sep 15, 2023 at 9:32 AM Jon Eakins I The Nau Company, PLLC<leakins@thenauco.com>wrote: Got it-that makes a lot more sense. The updated page for the application is attached Thanks again for the help Jon Eakins, PE Office:919-435-6395 Extension 4 Mobile:919-616-4716 www.thenauco.com On Fri, Sep 15, 2023 at 9:28 AM svc_post_construction_stormwater<postconstruction@deg.nc.gov>wrote: Hi John, Thanks for getting back to me so quickly. Small error with your application page with IV, 10: • Second Table, last row(Total (sf)):This number is supposed to reflect the total impervious area that matches the Proposed Impervious Area** (sf) in the first table (359625). • First Table, last row(% Impervious Area** (total)):This value is found table dividing Total (sf) by Total Drainage Area (sf), which can be found in the first table, fourth row, and multiplying that number by 100%. o % Impervious Area ** (total) = [Total (sf)/Total Drainage Area (sf)] * 100 Please revise accordingly. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov Error! Filename not specified. From:Jon Eakins I The Nau Company, PLLC<leakins@thenauco.com> Sent: Friday, September 15, 2023 9:08 AM To: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: bobby@sumnerconstruction.com; Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Valentine,Thad <thad.valentine@deq.nc.gov> Subject: [External] Re: Forest Hills; Louisburg, Franklin County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Kaitlin -thanks for the help with the application. Attached is a copy of the soil survey from the wetlands/stream buffer work done by others and a copy of the updated application with the correct info in the second table of Section IV. Please let me know if you need 6 anything else for this. Is there any chance the application can get updated to make the required information clearer? Thanks again for your help I Jon Eakins, PE Error! Filename not specified. Office:919-435-6395 Extension 4 Mobile:919-616-4716 www.thenauco.com On Fri, Sep 15, 2023 at 8:50 AM svc_post_construction_stormwater<postconstruction@deg.nc.gov>wrote: Good Morning, We received your application for a new post-construction stormwater permit on 9/15/23.At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items by close of business on 9/16/2023 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section IV, 10—The % Impervious Area** (total) is incorrect based on the information provided. Please revise as needed. NOTE:You can just email me the revised page of the application. • 1x hard copy of a soils report/map.This item is required per Section VI, 9 of the Application. NOTE:A soils map can be downloaded here: https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx NOTE:As these are minor items that do not need original signatures, these items can be emailed to me so that I can print them out and add them to your existing application. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1636 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck _ deq.nc.gov or at(919) 707- 9209. 7 Thankyou, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov Error! Filename not specified. From: svc_post_construction_stormwater Sent: Monday, September 11, 2023 8:16 AM To: 'bobby@sumnerconstruction.com' <bobbv@sumnerconstruction.com>; 'jeakins@thenauco.com' <jeakins@thenauco.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Valentine,Thad <thad.valentine@deq.nc.gov> Subject: RE: Forest Hills; Louisburg, Franklin County Good Morning, I am checking in on this project as its submission deadline for resubmittal is this week(9/16/23). Where are you in sending in these items? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov Error! Filename not specified. From: Peck, Kaitlin Sent:Thursday, August 17, 2023 2:45 PM To: bobby@sumnerconstruction.com; jeakins@thenauco.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Valentine,Thad <thad.valentine@deq.nc.gov> Subject: Forest Hills; Louisburg, Franklin County Good Afternoon, We received your application for a new post-construction stormwater permit on 8/16/23.At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 9/16/2023) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section III, 4—Please provide the contact information (email address and phone number)for the local jurisdiction for building permits. • Section IV, 8—The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). • Section IV, 10—There are general issues with area values.The% Impervious Area** (total) is incorrect based on the information provided. Please revise as needed. • Section VI—Please initial indicating that you have submitted all the required information relevant to the project's application. 8 1x hard copy of a soils report.This item is required per Section VI, 9 of the Application and Infiltration MDCs 1 & 2. 1x hard copy of official documentation showing that the Applicant is in good standing with the Secretary of State and showing the title and position information for the signing official (These items are required per 15A ` NCAC 02H .1040(1), .1042(2)(b), and per Section VI, 11 of the Application). 2x full-sized, signed &sealed hard copies of a plan sheet. NOTE:The provided plan sheets are not signed and not full sized. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1636 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck _ deq.nc.gov or at(919) 707- 9209. Thankyou, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov Error! Filename not specified. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 9