Loading...
HomeMy WebLinkAbout310502_Compliance Evaluation Inspection_20241003 Division of Water Resources Facility Number - ® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access ll Date of Visit: Arrival Time:L� Departure Time: County: Region: r`J Farm Name: �, �,,, (,� (/i� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I ILayer I I I Dairy Cow can to Feeder I INon-Layer I Dairy Calf Feeder to Finish ' 1 Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers _ Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets _ Beef Brood Cow _ Turkeys _ Other Turkey Poults Other Dischar¢es and Stream Impacts 1. Is any discharge observed from any part of the operation? [:] Yes E�No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ 1'cs ❑ No ❑ NA ONE b. Did the discharge reach waters of the State?(If yes,notify DWR) 0 l'es ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [� ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I q f 3 511212020 Continued Facilit Number: 3 1 Date of Inspection: .G Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑No ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes 0-l'<o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [J/No ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes GDXo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes E2 <oo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑,PLO ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes (o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes 2"No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No 0 NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes U40 ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes � "" ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes El No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes <o ❑ NA ❑ NE Required Records& Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes L.dZo ❑NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. [::] Yes o ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:] No ❑ NA IE Page 2 of 3 511212020 Continued Facilit Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes G�Io ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [] Yes E3Xo ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [:] Yes 9Io ❑ Nf\ ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes DIN/0 ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes o ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: / 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E3-Kg ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [: ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [> o ❑ NA ❑ NE Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). wig LM P t , ;(� �,��a1- sad u_f ve, Ck 0 Reviewer/Inspector Name: Phone: C� 9 W_ --kReviewer/Inspector Signature: Date: 6 Page 3 of 3 7 511212020