Loading...
HomeMy WebLinkAboutNCC203928_NOT Closeout Documents_20241002 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 Duke Energy-Aberdeen Transmission County: Moore Project: HQ River basin: Lumber Person financially responsible:Duke Energy Progress,Inc.-Zach Huett,Real Project#: MOORE-2019-025 Estate Portfolio Manager Address: 410 S Wilmington Street,Raleigh,NC 27601 1. Project Location: Allison Page,Aberdeen Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Tony Thompson Title: McDonald York Building Inspection report: Sent Report Date given/sent: September 10,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self monitoring or self inspections are required. Project has been released and coverage under NPDES General Permit for Construction Activities is terminated. Reported by: Penny Markle Others present: Date of inspection: September 09,2024 Time arriving on site: 1:47 PM Time leaving site: 2:46 PM cc: