HomeMy WebLinkAboutNCG140505_Tier 3 Action Plan_20240924 Eplin, Jerry W
From: Erin Wyndham <ebaerst@tristategunite.com>
Sent: Tuesday, September 24, 2024 4:54 PM
To: Eplin, Jerry W
Cc: Rohit Shetty; Eric Eubanks
Subject: [External] Tri State Gunite - 1822 Tower Industrial Dr
Attachments: Action Plan-1822 Tower Industrial.pdf
You don't often get email from ebaerst@tristategunite.com. Learn why this is important
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good afternoon, Mr. Eplin,
I hope this message finds you well. Please find the attached action plan regarding the Tier 3 response to
exceedances. Let me know if you need any additional information.We will keep you updated on our
progress. This pertains to site 1822 Tower Industrial Dr, Monroe, NC.
Erin Wyndham
Tri-State Gunite of NJ, LP
M: 321-412-0011
F: 864-752-4028
ebaerstatristateaunite.com
i
Office Location:
1822 Tower Industrial Dr
Monroe, NC 28110
Tri State Gunite of New Jersey, LP
September 241h, 2024
Mr. Jerry Eplin
Land Quality Division
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Mooresville Regional Office
610 E. Center Ave. Suite 301
Mooresville,North Carolina 28115
RE: Action Plan
Tri State Gunite of NJ, L.P. - Monroe Facility
1822 Tower Industrial Drive
Monroe, Union County,North Carolina
NPDES Permit#NCG140505
Dear Mr. Eplin,
We are addressing the Tier 3 response required due to the pH and TSS exceedances. Our team is
now sampling and testing the outfall every month to track improvements and changes at the site.
We have taken steps to reduce exceedances by cleaning and clearing areas near the outfall,
including relocating site materials such as sand to a more enclosed space. Additionally, we are in
the process of improving the sand enclosure and are seeking contractors to extend and repair the
concrete wall. We believe we should be able to fix the sand enclosure wall within one month
without any delays caused by weather or contractors.
Furthermore,we have cleared and cleaned the pond on site of sand and vegetation and have added
more riprap to the pond area and outfall.
We are collaborating closely with Rohit Shetty, P.E. and Eric Eubanks, P.G. of Geological
Resources, Inc., to swiftly implement the necessary improvements at the site. We are also
conducting monthly inspections to ensure that improvements are being made as quickly as
possible. Once the above-listed site improvements have been completed, photographs and other
documentation will be provided in the summary report.
Please let me know if you need additional information.
Thank you,
Erin Wyndham
Tri State Gunite of NJ, LP
Manager
321-412-0011
ebaerstp,tristate gunite.com