Loading...
HomeMy WebLinkAboutNCG140505_Tier 3 Action Plan_20240924 Eplin, Jerry W From: Erin Wyndham <ebaerst@tristategunite.com> Sent: Tuesday, September 24, 2024 4:54 PM To: Eplin, Jerry W Cc: Rohit Shetty; Eric Eubanks Subject: [External] Tri State Gunite - 1822 Tower Industrial Dr Attachments: Action Plan-1822 Tower Industrial.pdf You don't often get email from ebaerst@tristategunite.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon, Mr. Eplin, I hope this message finds you well. Please find the attached action plan regarding the Tier 3 response to exceedances. Let me know if you need any additional information.We will keep you updated on our progress. This pertains to site 1822 Tower Industrial Dr, Monroe, NC. Erin Wyndham Tri-State Gunite of NJ, LP M: 321-412-0011 F: 864-752-4028 ebaerstatristateaunite.com i Office Location: 1822 Tower Industrial Dr Monroe, NC 28110 Tri State Gunite of New Jersey, LP September 241h, 2024 Mr. Jerry Eplin Land Quality Division Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Mooresville Regional Office 610 E. Center Ave. Suite 301 Mooresville,North Carolina 28115 RE: Action Plan Tri State Gunite of NJ, L.P. - Monroe Facility 1822 Tower Industrial Drive Monroe, Union County,North Carolina NPDES Permit#NCG140505 Dear Mr. Eplin, We are addressing the Tier 3 response required due to the pH and TSS exceedances. Our team is now sampling and testing the outfall every month to track improvements and changes at the site. We have taken steps to reduce exceedances by cleaning and clearing areas near the outfall, including relocating site materials such as sand to a more enclosed space. Additionally, we are in the process of improving the sand enclosure and are seeking contractors to extend and repair the concrete wall. We believe we should be able to fix the sand enclosure wall within one month without any delays caused by weather or contractors. Furthermore,we have cleared and cleaned the pond on site of sand and vegetation and have added more riprap to the pond area and outfall. We are collaborating closely with Rohit Shetty, P.E. and Eric Eubanks, P.G. of Geological Resources, Inc., to swiftly implement the necessary improvements at the site. We are also conducting monthly inspections to ensure that improvements are being made as quickly as possible. Once the above-listed site improvements have been completed, photographs and other documentation will be provided in the summary report. Please let me know if you need additional information. Thank you, Erin Wyndham Tri State Gunite of NJ, LP Manager 321-412-0011 ebaerstp,tristate gunite.com