HomeMy WebLinkAbout960005_High Freeboard POA_20241003RECEIVED/NCDENR/DWR OCT -32624 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES ater Quality Regional Operations Section Washington Regional Office , Facility Number: 96-5 Facility Name: Donnie Peedin Farm Certified Operator Name: Keith Hill County: Wayne Operator Number. 986441 1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(Inches): 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action Is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facillty's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule wdh corresponding animal units and dates fro depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 10/3/2024 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is, accurate and correct Gwen P. Anderson Phone: 919-734-5299 Facility er/ nager ( rot) iY� lA AB,--,, 9/30/2024 Facility Owner/Manager (signal ) 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I 1 —� 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 162400 ftZ e. line c/12 x line d x 7.48 gallonsW 202459 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 242314 ft3 h. current herd # 7350 certified herd # 7350 actual waste produced = current herd # x line g = 242314 ft' certified. herd # i. volume of wash water according to structural design �ft3 j. excess rainfall over evaporation according to design I�94733 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 420185 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/18/2024 1.54 m. ((lines e + k)/1000) x line I = 959 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY.. 1. Structure ID: ' 1 line m = 958.9 lb PAN 2. Structure ID: line m = 16 PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = - lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines I+2+3+4+5+6= 958.9lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop ' Jr. acres s. remaining IRR 2 PAN balance (lblacre) L TOTAL PAN BALANCE FOR HELD (Iba) column r:s u. app6paon window' 7256 1 Small Grain 3.52 60.00 176.0 OCT-MAR 7256 Pivot Small Grain 15.60 50.00 780.0 OCT-MAR 7256 7 Small Grain 3.52 50.00 176.0 OCT-MAR 7256 8 Small Grain 3.80 50.00 190.0 OCT-MAR V. Total PAN available for all fields (sum Of Column t) _ W. FACILITY`S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (fine n from section II) _ x. Crop's remaining PAN balance (line v from section 111) y. Overall PAN balance (w - x) _ 1322.0 Ib. PAN 958.9 lb. PAN i��a�.� lb. PAN Ve3 1b. PAN N Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. if new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. was sampled on 9117/24 waiting for results. Self reported to DWR on 9/30/24.