HomeMy WebLinkAbout820348_30 day POA_20240930PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-348 County: Sampson Facility Name: P-19D Certified Operator Name: Dennis E. Alphin Operator Number: 988615 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 19D Spillway(Y or N): N Level(inches): 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 10/1/2024 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Prestage Farms Inc. Phone: 910-592-5771 n Facility Owner/Manager (print) , Date: 9/30/2024 Facility Owner/Manager (signature) TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 19D line m = 624.9 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 624.9lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWP Pr -Iron Inn KlnT I IAT FIFI rLR Tr) WHICH PAN CANNr1T RF APPI IFn MIRING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window 10977 3A CB -Grazed 1.60 148.00 236.8 MAR-OCT 10977 3B CB -Grazed 3.70 148.00 547.6 MAR-OCT v. Total PAN available for all Yields (sum of column t) _ IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) = 104.4 ID. YAN 624.9 lb. PAN 784.4 lb. PAN -160 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Reported via email on 9/30/24. 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): P-19D 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard l 9-01 inches c. line b - line a (inches in red zone) = 5.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) F 1658561 ft2 e. line c/12 x line d x 7.48 gallons/ft3 516918 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 211997 ft3 h. current herd # F--20-0--01 certified herd # 2000 actual waste produced = current herd # x line g = 211997 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 99808.3 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 388717 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/24/2024 0.69 m. ((lines e + k)/1000) x line I = 626 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below)