Loading...
HomeMy WebLinkAbout090099_30 day POA_20240930------------ PjIMfliiy ��r����a q.. -- -- - 9-n�� _ GeMfled ©perat(op Nmrfleo 1. cu paratorr g f 7q J-P Curre"t liquid level(s) in inches as measured 'From the current liquid level in the lowest point -on 'the fop of the gem for lagoons without spillways; and from 'the current iqui t° level in the lagoon 'to the bottom of the spillvvav -For lagoons with spillways, d level 1. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure G Lagoon Name/Identifier (I®): =� Spillway (Yes or No): Level (inches): I Li 2. Check 0 applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24- hour storm elevations for o ne Plan of Action is attached. Agronomic balance is within acceptable rrangemore, structures. A 30 day Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to Pumped and hauled is reflected in section Ill tables- Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. contaCa and �6C�9rre ��[c r°Ovafl f[Cra tg�e C�Evfldu�r� of °t�r°c`�eGV Qua➢ill u� DIJOF �® tFansferr of XUaSte to a �s�e root �ovetreo9 @rapine �aciiQaEyE;etrtM5d 1-:In5maQ waste Management pn eine Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Eerliest possible date to begin land application o wwaste: i heveloy getrtii;y that i have reviawed thg iir�f©r��a4F©r� Bi�t�d Rfo��e arna, icucGu�feo9 uviiti�uc� Elite �aiiacf�ed t�QaQ� Ati €��, aF�d i� Eire f�esE ©� rrt;ay Q�ba�wBed�e arrari a�iiBify, tP�a iiovneEB®ro os aCUpaEe arac] Cormc;E. a�gBitry ®wa�er�fi ana �� (P opt) _. I ."-f� v -, 9 1 eo° (�➢ aEu re;aryOweMi i nffae FoA Covey Page 2121100 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Billup Finishing line m = 96.5 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 96.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRInn_ nn NOT LIST FIR n-RTO WHICH PAN CANNOT RF APPI_IFn 171IIRINA THISWI DAY PFRInn_ o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1566 1 bermuda 6.02 50.00 301.0 March -Oct 15661 3 bermuda 2.47 50.00 123.5 March -Oct '* uestimate but transferred 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 424.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 96.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 424.5 Ib. PAN y. Overall PAN balance (w - x) = -328 lb. PAN Line y must showas a deficit. If line y does not showas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to anotherpermitted facility, provide information regarding the herd population and lagoonfreeboard levels at the receiving facility. NARRATIVE: Transferred to other lagoon and at 34 FB on 9/18/24 PoA (30 Day) 2/21 /00 v PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): FBillup Finishing 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 1 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47280 ft2 e. line c/12 x line d x 7.48 gallons/ft3 147356 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 52748.7 ft3 h. current herd # 1600 certified herd # 1600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/15/23 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 52749 ft3 0 ft3 27580 1ft3 100143 gallons 0.39 Ibs/1000 gal. 96.5 Ibs. PAN PoA (30 Day) 2/21100