Loading...
HomeMy WebLinkAbout090068_30 day poa_20240930PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACUT'IES Facility Number: 9 - 6 V Count �1 ��1 Y: Facility Name:W1- k- PsClm Certified Operator Name: i` oa u �406 Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within / acceptable ranges. V Liquid level is within the 25 year 24 hour storm elevations Plan of Action is attached. Agronomic balance is within acceptable rrnge more structures. A 30 day Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to Pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: o I I q I lq I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. �()N a G-DO&,n Facility Owner/Manager (print) Phone: C1I 0 U(C .- A 6 q-( cd n jxq Date: Facility Owner/Manager (signature)- PoA Cover Page 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: White Bay 9-68 line m = 53.5 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 53.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRInn no NAT 1 IST FIFI nS Tn WHICH PAN CANNAT RF APPI IFn ntlRINr.' THIS an nAV PFRlnn o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Iblacre) t.TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 10747 1A bermuda 5.30 75.00 397.5 1011 - 3131 10747 113 bermuda 5.30 75.00 397.5 10/1 - 3131 10747 2A Fescue 3.30 100.001 330.0 8/1-7/31 10747 213 Fescue 3.20 100.00 320.0 8/1-7/31 " uesitimates on PAN available" 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1445.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 53.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1445.0 lb. PAN y. Overall PAN balance (w -x)= -1391 lb. PAN NARRATIVE: Will begin pumpingassoon asfield conditions permit. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifier (ID): White Bay 9-68 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 1 19.0 linches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 21996 fe e. line c/12 x line d x 7.48 gallons/ft3 41133 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 Jdays g. volume of waste produced according to structural design 19048 ft3 h. current herd # 2600 certified herd # 2600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/15/24 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 19048 ft3 0 ft3 14000 JfO 41200 gallons 0.65 Ibs/1000 gal. 53.5 lbs. PAN PoA (30 Day) 2/21 /00