HomeMy WebLinkAbout090067_30 day poa_20240930i LAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILMES
Facility Number. A (11.� county. -
Facility Name:ibu) ��� A14���
Certified Operator Name: - �f�� ����%� �V,ir�'•` �f�} � Operator �
1. Current liquid levels) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (iD): !
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
4�. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. included• within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Gontact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's ceftified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: _ 19 I a 4
l hereby certify that l have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
1Phone:
Facility OwnedManager (print)
®ata:
CtII� I a Lf
Facility OwnedManager (signature)
PoA Cover Page 2121100
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Cowford
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m =
42.4 lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 42.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED DURING THIS 3n DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column rxs
u. application
window'
1819004
5A
bermuda rass
1.60
50.00
80.0
311-9/30
1819004
56
bermuda rass
3.20
50.00
160.0
3/1-9/30
** uestimates on PAN remainin **
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) _ 240.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 42.4 lb. PAN
x. Crop's remaining PAN balance (line v from section 111) = 240.0 lb. PAN
y. Overall PAN balance (w -x) = -198 lb. PAN
will begin pumping assoon as field conditions permit.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Cowford
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 1 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 3.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 24000 fe
e. line c/12 x line d x 7.48 gallons/ft3 44880 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 Jdays
g. volume of waste produced according to structural design 19388 Jft3
h. current herd # 2640 certified herd # 2640
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/15/24
m. ((lines e + ky1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
19388 ft3
0 ft3
14000 ft3
41624 gallons
0.49 1 Ibs/1000 gal.
42.4 Ibs. PAN
PoA (30 Day) 2/21/00