HomeMy WebLinkAbout090044_30 day poa_20240930PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACIL T ES
�
Facility Number: - - t L4 County 61aen
Facility Name:
IVE
Certified Operator Name: Mel V7 r Operator* 100CM 2
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No): '� r
Level (inches): /
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
V%
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility `
3. Earliest possible date to begin land application of waste: _ q I n Ia�
l hereby certify that 1 have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
6 9WA Melvin Phone: c D -27 to - [WO
Facility Owner/Manager (print)
Date:
Facility OwnerlManager (signature)
Poi► Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Melving Brothers A
2. Structure ID: Melvin Brothers B
3. Structure 1D:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.lines 1+2+3+4+5+6=
line m = 802.5 lb PAN
line m = 783.8 lb PAN
line m = lb PAN
1wa aiiM
II_•77_lu
line m = lb PAN
line m = lb PAN
1586.3 lb PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS
TO WHICH PAN CANNOT BE APPLIED
DURING THIS 30 DAY
PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
Melvin
M
bermuda haV
3.34
100
334.0
March -Sept
11
bermuda haV
5.63
100
563.0
March -Sept
N
bermuda hay
3.19
100
319.0
March -Sept
K1
bermuda hay
3.20
100
320.0
March -Sept
G1
lbermuda hay
4.63
1 100.00
463.0
March -Se t
Fo—niv used
4 fields and plenty of PAN left
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1999.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w.
Total PAN to be land applied (line n from section 11) =
1586.3
lb. PAN
x.
Crop's remaining PAN balance (line v from section 111) =
1999.0
lb. PAN
y.
Overall PAN balance (w - x) =
-413
lb. PAN
Line y must show as a deficit. If line y does not showas a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels atthe receiving facility.
NARRATIVE-.
III begin pumping as oon as fields dry out.
4* did not use all fields in plan because there is plentyof PAN still available.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
MB A
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 12.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 96136 ft2
e. line c/12 x line d x 7.48 gallons/ft3 419473 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 116047 ft3
h. current herd # 3520 certified herd # 3520
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/26/24
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
116047 ft3
0 ft3
58333 ft3
217394 gallons
1.26 Ibs/1000 gal.
802.5 lbs. PAN
PoA (30 Day) 2/2 110 0
A
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID):
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 12.0 1 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 102476 ft2
e. line c/12 x line d x 7.48 gallons/ft3 447137 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 Jdays
g. volume of waste produced according to structural design 116047 ft3
h. current herd # 3520 certified herd #1 3520
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/26124
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
116047 ft3
50823.5 ft3
62066 Ift3
285408 gallons
1.07 1 Ibs/1000 gal.
783.8 Ibs. PAN
PoA (30 Day) 2/21 /00