Loading...
HomeMy WebLinkAbout090044_30 day poa_20240930PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACIL T ES � Facility Number: - - t L4 County 61aen Facility Name: IVE Certified Operator Name: Mel V7 r Operator* 100CM 2 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): '� r Level (inches): / 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V% Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility ` 3. Earliest possible date to begin land application of waste: _ q I n Ia� l hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 6 9WA Melvin Phone: c D -27 to - [WO Facility Owner/Manager (print) Date: Facility OwnerlManager (signature) Poi► Cover Page 2121100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Melving Brothers A 2. Structure ID: Melvin Brothers B 3. Structure 1D: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 802.5 lb PAN line m = 783.8 lb PAN line m = lb PAN 1wa aiiM II_•77_lu line m = lb PAN line m = lb PAN 1586.3 lb PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' Melvin M bermuda haV 3.34 100 334.0 March -Sept 11 bermuda haV 5.63 100 563.0 March -Sept N bermuda hay 3.19 100 319.0 March -Sept K1 bermuda hay 3.20 100 320.0 March -Sept G1 lbermuda hay 4.63 1 100.00 463.0 March -Se t Fo—niv used 4 fields and plenty of PAN left 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1999.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1586.3 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 1999.0 lb. PAN y. Overall PAN balance (w - x) = -413 lb. PAN Line y must show as a deficit. If line y does not showas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels atthe receiving facility. NARRATIVE-. III begin pumping as oon as fields dry out. 4* did not use all fields in plan because there is plentyof PAN still available. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): MB A 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 96136 ft2 e. line c/12 x line d x 7.48 gallons/ft3 419473 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116047 ft3 h. current herd # 3520 certified herd # 3520 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/26/24 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 116047 ft3 0 ft3 58333 ft3 217394 gallons 1.26 Ibs/1000 gal. 802.5 lbs. PAN PoA (30 Day) 2/2 110 0 A PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 1 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 102476 ft2 e. line c/12 x line d x 7.48 gallons/ft3 447137 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 Jdays g. volume of waste produced according to structural design 116047 ft3 h. current herd # 3520 certified herd #1 3520 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/26124 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 116047 ft3 50823.5 ft3 62066 Ift3 285408 gallons 1.07 1 Ibs/1000 gal. 783.8 Ibs. PAN PoA (30 Day) 2/21 /00