Loading...
HomeMy WebLinkAbout090111_30 day POA_20240816PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9-111 County: Bladen Facility Name: Rainbow Family Farm Certified operator Name: Charles Matthew Hardee Jr. Operator Number: 997068 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 A B N N 19 15 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 8/12/24 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Matthew Hardee Jr. Phone: Facility Owner/Manager (print) 910-879-2624 ��&Z2!2 _ Date: 8/9/2024 Facility Owner/Manager (signature) 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JA 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 1-9-.-01 inches c. line b - line a (inches in red zone) = inches top of dike surface area according to design d. (area at below structural freeboard elevation) 69861 ft2 e. line c/12 x line d x 7.48 gallons/ft' gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 71682.5 ft3 h. current herd # F 40-8-91 certified herd # 4089 actual waste produced = current herd # x line g = 71683 ft' certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 42656.3 ft3 k. (lines In + i +j) x 7.48 x 30 days/line f= 142542 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/6/2024 2.09 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 298 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I B 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 15.0 inches 19.0 inches 4.0 inches 52341 ftZ 130504 gallons 180 days g. volume of waste produced according to structural design 56656 ft3 h. current herd # 4089 certified herd # 4089 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 6/6/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 56656 ft' O ft3 32156.3 ft3 110719 gallons 2.09 Ibs/1000 gal. 504.2 Ibs. PAN PoA (30 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: A line m = 298.0 lb PAN 2. Structure ID: B line m = 504.2 lb PAN 3. Structure ID: line IT = lb PAN 4. Structure ID: line IT = lb PAN 5. Structure ID: line IT = lb PAN 6. Structure ID: line IT = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 802.2lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 11687 1F Bermuda -Hay 1.18 197.86 233.5 MAR-SEP 11687 1G Bermuda -Hay 1.18 181.00 213.6 MAR-SEP 11687 1H Bermuda -Hay 1.18 181.00 213.6 MAR-SEP 11687 11 Bermuda -Hay 1.18 214.72 253.4 MAR-SEP V. I otal PAN avauadle for all tlelas (sum or column q = IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) = `.1'14.V ID. YAN 802.2 lb. PAN 914.0 lb. PAN 111.8 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Self reported to DWR on 819124.