HomeMy WebLinkAbout090111_30 day POA_20240816PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 9-111 County: Bladen
Facility Name: Rainbow Family Farm
Certified operator Name: Charles Matthew Hardee Jr. Operator Number: 997068
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
A B
N N
19 15
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 8/12/24 Weather permitting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Matthew Hardee Jr. Phone:
Facility Owner/Manager (print)
910-879-2624
��&Z2!2 _ Date: 8/9/2024
Facility Owner/Manager (signature)
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JA
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 19.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 1-9-.-01 inches
c. line b - line a (inches in red zone) = inches
top of dike surface area according to design
d. (area at below structural freeboard elevation) 69861 ft2
e. line c/12 x line d x 7.48 gallons/ft' gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 71682.5 ft3
h. current herd # F 40-8-91 certified herd # 4089
actual waste produced = current herd # x line g = 71683 ft'
certified herd #
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 42656.3 ft3
k. (lines In + i +j) x 7.48 x 30 days/line f= 142542 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/6/2024 2.09 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 298 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I B
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
15.0 inches
19.0 inches
4.0 inches
52341 ftZ
130504 gallons
180 days
g. volume of waste produced according to structural design 56656 ft3
h. current herd # 4089 certified herd # 4089
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/6/2024
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
56656 ft'
O ft3
32156.3 ft3
110719 gallons
2.09 Ibs/1000 gal.
504.2 Ibs. PAN
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: A
line m =
298.0 lb PAN
2.
Structure ID: B
line m =
504.2 lb PAN
3.
Structure ID:
line IT =
lb PAN
4.
Structure ID:
line IT =
lb PAN
5.
Structure ID:
line IT =
lb PAN
6.
Structure ID:
line IT =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 802.2lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
11687
1F
Bermuda -Hay
1.18
197.86
233.5
MAR-SEP
11687
1G
Bermuda -Hay
1.18
181.00
213.6
MAR-SEP
11687
1H
Bermuda -Hay
1.18
181.00
213.6
MAR-SEP
11687
11
Bermuda -Hay
1.18
214.72
253.4
MAR-SEP
V. I otal PAN avauadle for all tlelas (sum or column q =
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line in from section II) _
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
`.1'14.V ID. YAN
802.2 lb. PAN
914.0 lb. PAN
111.8 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Self reported to DWR on 819124.