HomeMy WebLinkAbout090141_30 day poa_20240816PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9-141 County: Bladen Facility Name: P-7A-E Certified operator Name: Jeremy Pope Robinson Operator Number: 985750 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 7A 7E -7D Spillway(Y or N): N N N Leve I (inches): 18 18 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 8/13/24 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Prestage Farms Phone: 910-592-5771 Facility Owner/Manager (print) ,ew Al, Date: 8/12/2024 Facility Owner/Manager (signature) PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I 7D 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 inches 19.0 inches 1.0 inches 60460.E ftZ 37687 gallons 180 days g. volume of waste produced according to structural design 79278.8 ft3 h. current herd # 625 certified herd # 625 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/24/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 79279 ft' ft3 41737.5 ft3 150867 gallons 0.77 Ibs/1000 gal. 145.2 Ibs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 7A line m = 102.9 lb PAN 2. Structure ID: 7E line m = 291.6 lb PAN 3. Structure ID: 7D line m = 145.2 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 539.7lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWI PERIOD. nn NnT I IRT mm nQ Tn WUII U oA uI rA uunr M= Annl Ill o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) I. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 1434 3B CB -Graze 7.00 243.00 1701.0 MAR-OCT 1434 1A CB -Graze 3.70 221.00 817.7 MAR-OCT w. w avaooupa for au uarus taum or column c) _ IV. FACILITY'S FDA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) = 2blti./ lb. PAN 539.7 lb. PAN 2518.7 lb. PAN -1979 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Called in 7A and 7E on 8/9/24. Called in 7D on 8/12124. 7A and 7E has been previously submitted.