HomeMy WebLinkAboutNCC242918_ESC Approval Submitted_20241002 a ,.
ROY COOPER i _ -
Governor Vi i
ELIZABETH S.BISER ,7,..76 ,,
Secretary f QwM .
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
09-10-2024
LETTER OF APPROVAL
Duke Energy Progress, LLC
PO Box 1551 - PEB3A
Raleigh, NC 27602
RE: Project Name: Roxboro OFF- Site Borrow Source Characterization-Area 9
Permit Number: PERSO-2025-0105
Acres Approved: 14
County: Person
City: Semora
Address: 1700 Dunnaway Road
River Basin: Roanoke
Stream Classification: B: Primary Contact Recreation, Fresh Water; WS-V: Water Supply V
Plan Type: New Plan
Dear Duke Energy Progress, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this
Letter of Approval. Any modifications required for approval are listed in the body of the email that
accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to complete
and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the annual permit fee. After the fee
is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01.
Q A North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
Daparbnenot Envlronmenbl Dual\ /^" 919.707.9200
Letter of Approval
Duke Energy Progress, LLC
09-10-2024
Page 2 of 3
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),
this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form and on the plan, which you provided. You are requested to file an
amended form if there is any change in the information included on the form.
Letter of Approval
Duke Energy Progress, LLC
09-10-2024
Page 3 of 3
Modifications Required for Approval:
1. Provide the location of the site, to scale as near as possible and enlarged sufficient to adequately view
details,on the most recent paper-bound(historical)version of the Natural Resources Conservation Service
(NRCS) soil survey map. Do not use the new color versions of the soils maps available on the NRCS
website. Use the scanned copies of the historical black and white maps, which are more accurate. The
historical soils maps can be found on the NRCS website here: https://www.nres.usda.gov/conservation-
basics/natural-resource-concerns/soil/soil-surveys-by-state.Alternatively,the historical maps may also be
found on the Division of Water Resources Riparian Buffer Protection Program website
here: https://experience.arcgis.com/experience/a16078049de54d42a2bc384b9ceda91f/page/Page-
1/?views=Layers. (GS 113A-57.4(c), 15A NCAC 04B .0105, 15A NCAC 04B .0106(a)(1) and (a)(3),
NCGO1 Section II.A. (4))
2. Show location of rain gauge and permits/record box on-site. The box is usually located at the entrance
of the project. (GS 113A-57(3), 15A NCAC 04B .0113)
3. You may need to revise the project name to "ROXBORO OFF-SITE BORROW SOURCE
CHARACTERIZATION- AREA 9"
Your cooperation is appreciated.
Sincerely,
i,, .
aye
Land Quality Section