Loading...
HomeMy WebLinkAboutNCG020220_Compliance Evaluation Inspection_20240930 ru 54-,a STATE Qua (:-.457; 1 ff,/ •' ROY COOPER ! III- .. l Governor ?:v., - , a';# o MARY PENNY KELLEY �- .� ' tea, Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA interim Director Environmental Quality 9/30/2024 B.V. Hedrick Gravel & Sand Company Attn: Jason Conner, Land Management/Geologist P. O. Box 425 Swannanoa, NC 28778 Subject: COMPLIANCE EVALUATION INSPECTION — Non-Compliance Status NPDES Stormwater General Permit NCG020000 B.V. Hedrick Gravel & Sand Company B.V. Hedrick-Lilesville Quarry, Certificate of Coverage NCG020220 Anson County Dear Mr. Conner: On September 26, 2024, a site inspection was conducted for the B.V. Hedrick-Lilesville Quarry facility located at SR 1704, Lilesville, Anson County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Kevin Tobin, Assistant Land Manager, was present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020220. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Savannah Creek, class WS-IV waters in the Yadkin River Basin. As a result of the inspection, the facility was found be compliant with the conditions of the NCG020000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to$25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3384 or via e-mail at melissa.joyner@deq.nc.gov. Sincerely, Melissa Joyner Environmental Senior Specialist DEMLR Enclosure: Compliance Inspection Report ec: Kevin Tobin, Assistant Land Manager— B.V. Hedrick Gravel & Sand Company Hank Gaston, Corporate Engineer— B.V. Hedrick Gravel & Sand Company DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO — DEMLR, Stormwater Files Qom, North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources D E ""7�/JJ//� Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301 noan,cuOLC:A Deprive.'M r r oo.c.w WI.T.N.,041 910.433.3300 Compliance Inspection Report Permit:NCG020220 Effective: 07/01/21 Expiration: 06/30/25 Owner: B V Hedrick Gravel&Sand Company SOC: Effective: Expiration: Facility: B V Hedrick-Lilesville Quarry County: Anson Sr 1704-lilesville quar Region: Fayetteville Lilesville NC 28091 Contact Person:Jason Conner Title: Phone:828-686-3844 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): On-site representative Kevin Tobin 828-712-9009 Related Permits: Inspection Date: 09/26/2024 Entry Time 04:30PM Exit Time: 04:45PM Primary Inspector:Melissa A Joyner 4i, i )-(-1 Phone: Secondary Inspector(s): Denise Bruce Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant MI Not Compliant Question Areas: MI Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020220 Owner-Facility:B V Hedrick Gravel&Sand Company Inspection Date: 09/26/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner and Denise Bruce met with Kevin Tobin, Assistant Land Manager. There was no Stormwater Pollution Prevention Plan (SWPPP)developed which would be subject to General Permit NCG020000 conditions Part D:Inactive Mines/Dormant Status, D-1 through D-6. There were no required, documented annual inspection and stormwater control measures (SCM) semi-annual inspections. Semi-annual inspections would involve looking at the permanent groundcover to determine if there were any issues with erosion. The annual on-line self-certification about the current Dormant Status conditions had not been conducted. Please go to the following link under"Dormant Status" to initiate this process.: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-program/npdes-industrial- program/general-industrial-permits#NCG020000MiningActivitiesEffective7-1-2021Expires6-30-2025-2313 This mine was lass inspected on 6/6/2024 and was inactive at the time of the inspection. It was not inspected during this inspection. Please also refer to the conditions of the letter issued on 11/15/2013 "Exemption from Monitoring During Shut-Down (Site Dormancy)". This letter should be retained in the SWPPP. The facility is not in compliance with the conditions of Stormwater General Permit NCG020000 because there was no SWPPP developed which would include the aforementioned required information. There has also not been an annual on-line self-certification about the current Dormant Status conditions. Page 2 of 3 Permit: NCG020220 Owner-Facility:B V Hedrick Gravel&Sand Company Inspection Dale: 09/26/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ • ❑ ❑ #Does the Plan include a General Location(USGS)map? 0 ❑ 0 U #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ IIII #Does the Plan include a detailed site map including outfall locations and drainage areas? E100111 #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ • #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ El • #Does the facility provide all necessary secondary containment? ❑ El ❑ • #Does the Plan include a BMP summary? ❑ ❑ 0 1111 #Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ U #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 0 ❑ 1 #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ 0 El II #Is the Plan reviewed and updated annually? ❑ ❑ ❑ II #Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ NI Has the Stormwater Pollution Prevention Plan been implemented? ❑ • 0 ❑ Comment: There is no Stormwater Pollution Prevention Plan per the conditions of Stormwater General Permit NCG020000. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ El ❑ • Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 0 El IIII #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ U ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ II #Were all outfalls observed during the inspection? ❑ ❑ ❑ II # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ • 0 #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ ❑ Comment: Page 3 of 3