9/30/2024
Laurinburg-Maxton Airport Commission
Attn: Seth Hatchell, Owner
16701 Airport Road
Maxton, NC 28364
Subject: COMPLIANCE EVALUATION INSPECTION —Non-Compliance Status
NPDES Stormwater General Permit NCG150000
Laurinburg-Maxton Airport Commission
Laurinburg-Maxton Airport Commission, Certificate of Coverage NCG150013
Scotland County
Dear Mr. Hatchell:
On September 23, 2024, a site inspection was conducted for the Laurinburg-Maxton Airport Commission
facility located at 16701 Airport Road, Maxton, Scotland County, North Carolina. A copy of the Compliance
Inspection Report is enclosed for your review. Marcuss Baker, Operations Manager and Mickey Oxendine,
Water & Wastewater Superintendent were present during the inspection and their time and assistance is
greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES
Stormwater General Permit NCG150000 under Certificate of Coverage NCG150013. Permit coverage
authorizes the discharge of stormwater from the facility to receiving waters designated as Shoe Heel Creek
(Big Shoe Heel Creek)(Maxton Pond), class C;Sw waters in the Lumber River Basin.
As a result of the inspection,the facility was found to not be compliant with the conditions of the NCG150000
permit. Please refer to the enclosed Compliance Inspection Report for additional comments and
observations made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to$25,000 per day for each violation. If you or your staff have any questions,
comments, or needs assistance with understanding any aspect of your permit, please contact me at(910)
433-3384 or via e-mail at melissa.joyner@deq.nc.gov.
Sincerely,
Melissa Joyner
Environmental Senior Specialist
DEMLR
Enclosure: Compliance Inspection Report
ec: Marcuss Baker, Operations Manager—Laurinburg-Maxton Airport Commission
Mickey Oxendine, Water&Wastewater Superintendent— Laurinburg-Maxton Airport Commission
DEMLR NPDES Stormwater Permit Laserfiche File
cc: FRO—DEMLR, Stormwater Files
D_E Q , North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Fayetteville Regional Office I225 Green Street,Suite 7i4 I Fayetteville,North Carolina 28301
NORTH cr.RODU A
awt^f<+a F ir..NI l Oven 910.433.3300
i
Compliance Inspection Report
Permit:NCG150013 Effective: 07/01/22 Expiration: 06/30/27 Owner: Laurinburg-Maxton Airport Commission
SOC: Effective: Expiration: Facility: Laurinburg-Maxton Airport Commission
County: Scotland 16701 Airport Rd
Region: Fayetteville
Maxton NC 283646899
Contact Person:Jo Ann Gentry Title: Executive Director Phone:910-844-5081
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
On-site representative Marcuss Baker 910-390-6123
On-site representative Mickey Lee Oxendine 910-844-5081
Related Permits:
Inspection Date: 09/23/2024 Entry Time 01:07PM Exit Time: 03:05PM
Primary Inspector:Melissa A Joyner %hLuw a'' friftiAl Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Air Transportation Stormwater Discharge COC
Facility Status: 0 Compliant Not Compliant
Question Areas:
• Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG150013 Owner-Facility:Laurinburg-Maxton Airport Commission
Inspection Date: 09/23/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Melissa Joyner met with Marcuss Baker, Operations Manager and Mickey Oxendine,Water&Wastewater Superintendent.
There has been a recent change in personnel management.Stormwater Delegation of Signature Authority(DOSA)and
Permit Contact Update Request forms will need to be completed and submitted which are reflective of these changes. After
these forms are submitted for Analytical Monitoring, you will need to register for Electronic Discharge Monitoring Report
Form submittal (e-DMR). The Stormwater Pollution Prevention Plan (SWPPP)was reviewed. The following observations wen
made.:
There was no required annual, dated/signed acknowledgment of the review of the SWPPP.There was no General Location
(USGS) map available for review. The Site Map should include: the latitudes/longitudes of Outfalls 1-5 and locations of the
stormwater control measures (e.g. ditches, swales, outlet protection, etc.). In the Spill Prevention and Response Procedures
(SPRP), include in General Permit NCG150000 (on pages 5 and 6), items b-f,including information about the Tenants.
There should also be an annual signed certification that the outfalls have been checked for the presence of non-stormwater.
In regards to the stormwater facility inspections, the table header("Semi-Annual Site Inspections") needs to be modified as
these inspections are now required to occur on a quarterly basis for all outfalls and stormwater control measures.
Documentation of these inspections needs to be included in the SWPPP.Required Annual Training was only documented
for 9/2024. The table of Aboveground Storage Tanks(AST)will need to be modified upon the completed installation of the
future ASTs. The Site Map will also need to updated with this information. Solvents are not stored at the airport. There needs
to be a signed/dated certification statement about this included in the SWPPP.If in the future Tenant(s)do obtain solvents,
the SWPPP must be updated accordingly. The Analytical and Qualitative monitoring records were reviewed. There was one
Discharge Monitoring Report dated 7/24/2024 noted. Both pH and Conductivity must be tested with calibrated meters within
15 minutes of collection of the water sample. One outfall associated with industrial activity is actually being monitored.
Quarterly monitoring is required for the Analytical and Qualitative monitoring.The facility grounds were inspected with no
issues noted.
The facility is not in compliance for not implementing the SWPPP and not conducting Analytical Monitoring per the
conditions of General Permit NCG150000. It will be inspected within 6 months of receiving this Compliance Inspection report.
Page 2 of 3
Permit: NCG150013 Owner-Facility:Laurinburg-Maxton Airport Commission
Inspection Date: 09/23/2024 Inspection Type ;Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? • 0 0 0
#Does the Plan include a General Location(USGS)map? ❑ • 0 0
#Does the Plan include a"Narrative Description of Practices"? • 0 ❑ 0
#Does the Plan include a detailed site map including outfall locations and drainage areas? • ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ • ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? • 0 0 ❑
Does the facility provide all necessary secondary containment? 111 0 ❑ ❑
#Does the Plan include a BMP summary? • ❑ 0 0
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? • 0 0 0
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • ❑ ❑ ❑
#Does the facility provide and document Employee Training? ❑ • ❑ 0
#Does the Plan include a list of Responsible Party(s)? • ❑ 0 0
#Is the Plan reviewed and updated annually? 01E00
#Does the Plan include a Stormwater Facility Inspection Program? ❑ • 0 0
Has the Stormwater Pollution Prevention Plan been implemented? ❑ • ❑ ❑
Comment: The Stormwater Pollution Prevention Plan has not been implemented per the conditions of
General Permit NCG150000.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? • ❑ 0 ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 NI 0 ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ■ ❑
Comment: Analytical Monitoring has not been conducted per the conditions of General Permit
NCG 150000.
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? II ❑ ❑ 0
#Were all outfalls observed during the inspection? • ❑ ❑ ❑
#If the facility has representative outfall status,is it properly documented by the Division? 0 ❑ ■ 0
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ■ ❑ ❑
Comment:
Page 3 of 3