Loading...
HomeMy WebLinkAboutNCG110052_Compliance Evaluation Inspection_20240930 ,(g:p ROY COOPER g 41-\\ cGovernor MARY PENNY KELLEY Secretory Gy q`"'%-x0 WILLIAM E,TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality 9/30/2024 Town of Elizabethtown Attn: Dane Rideout, Acting Town Manager P. O. Box 700 Elizabethtown, NC 28337 Subject: COMPLIANCE EVALUATION INSPECTION—Non-Compliance Status NPDES Stormwater General Permit NCG110000 Town of Elizabethtown Elizabethtown WWTP, Certificate of Coverage NCG110052 Bladen County Dear Mr. Rideout: On September 24, 2024, a site inspection was conducted for the Elizabethtown WWTP facility located at 4699 Scout Lane, Elizabethtown, Bladen County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Hugh Bledsoe, ORC, Stephen Duffy, Public Services Director, and John Duffy, GIS/GPS Technician were present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG110000 under Certificate of Coverage NCG110052. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Cape Fear River,class C waters in the Cape Fear River Basin. As a result of the inspection, the facility was found to not be compliant with the conditions of the NCG110000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to$25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at(910) 433-3384 or via e-mail at melissa.joyner@deq.nc.gov. Sincerely, luhdeiVarAhi Melissa Joyner Environmental Senior Specialist DEMLR Enclosure: Compliance Inspection Report ec: Hugh Bledsoe, ORC —Town of Elizabethtown Stephen Duffy, Public Services Director—Town of Elizabethtown John Duffy, GIS/GPS Technician—Town of Elizabethtown DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO— DEMLR, Stormwater Files D_E Q j North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regional Office I225 Green Street,Suite 714 I Fayetteville,North Carolina 28301 NORM CM6UNA DepvM,eet d FcWwr.U1 a'aY, 910.433.3300 Compliance Inspection Report Permit:NCG110052 Effective: 03/01/24 Expiration: 02/28/29 Owner: Town of Elizabethtown SOC: Effective: Expiration: Facility: Elizabethtown WWTP County: Bladen 699 Scout Ln Region: Fayetteville Elizabethtown NC 28337 Contact Person:Hugh Bledsoe Title: Phone:910-874-1961 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): On-site representative Hugh Bledsoe 910-874-1961 On-site representative John Duffy 910-862-2035 On-site representative Stephen Duffy 910-862-2066 Related Permits: Inspection Date: 09/24/2024 Ent Time 10:05AM Exit Time: 11:14AM Primary Inspector:Melissa A Joyner ' I"jetp.--- Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal WWTP> 1 MGD,Stormwater Discharge, COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG110052 Owner-Facility:Town of Elizabethtown Inspection Date: 09/24/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Hugh Bledsoe,ORC, Stephen Duffy, Public Services Director and John Duffy, GIS/GPS Technician to conduct an inspection at the Elizabethtown Waste Water Treatment Plant. There has been a recent change of personnel. A Delegated Signature Authority(DOSA) and Permit Contact Update Request Form will need to be submitted reflective of these changes.After this occurs registration should occur for the submittal of Analytical Discharge Monitoring reports electronically(e-DMR). The facility had a few components of the Stormwater Pollution Prevention Plan (SWPPP) but did not have a fully developed and implemented SWPPP. One will need to be developed/implemented which contains the required information per the conditions in General Permit NCG110000. A Site Map was reviewed, pleaase refer to General Permit NCG110000m pgs. 3 and 4, B-3 - Items a,b and d-h which should be shown on the Site Map.There are no Aboveground Storage Tanks at the facility. The facility has two outfalls. Qualitative Monitoring records were available for review. The Analytical Monitoring will occur in January 2025, after the 9 month grace period for this renewed General Permit has expired. Sampling should occur after a Measurable Storm Event which results in an actual discharge from the outfalls. Sampling should occur within the first 30 minutes of the initiation of this storm event.The facility grounds were inspected, including all specified locations as stipulated in General Permit NCG110000. No issues were noted in regards to stormwater discharge from the two stormwater outfalls which were inspected. The facility is not in compliance because of not developing, nor implementing the SWPPP. It will be reinspected within 6 months of receiving this Compliance Inspection report. Page 2 of 3 Permit: NCG110052 Owner-Facility:Town of Elizabethtown Inspection Date: 09/24/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? • 0 0 0 #Does the Plan include a General Location(USGS)map? • ❑ ❑ 0 #Does the Plan include a"Narrative Description of Practices"? 0 ❑ 0 IN #Does the Plan include a detailed site map including outfall locations and drainage areas? • 0 ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ • #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ NI #Does the facility provide all necessary secondary containment? 00 . 0 #Does the Plan include a BMP summary? ❑ ❑ ❑ III #Does the Plan include a Spill Prevention and Response Plan (SPRP)? El ❑ ❑ II #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ 0 III #Does the facility provide and document Employee Training? ❑ 0 0 • #Does the Plan include a list of Responsible Party(s)? 0 0 0 NI #Is the Plan reviewed and updated annually? 0 0 ❑ • #Does the Plan include a Stormwater Facility Inspection Program? 0 0 ❑ U Has the Stormwater Pollution Prevention Plan been implemented? ❑ ■ ❑ ❑ Comment: A Stormwaterwater Pollution Prevention Plan has not been developed and implemented per the conditions of General Permit NCG110000. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 11111 ❑ ❑ 0 Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ IN 0 ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 0 IN 0 Comment: Analytical Monitoring has not been conducted per the conditions of General Permit NCG110000. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? NI 0 ❑ 0 #Were all outfalls observed during the inspection? • 0 0 0 # If the facility has representative outfall status, is it properly documented by the Division? 0 0 IN 0 #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 III Comment: Page 3of3