HomeMy WebLinkAboutNCC203413_NOT Closeout Documents_20240926 FINAL INSPECTION REPORT-Erosion Control
Town of Huntersville- Land Development
105 Gilead Rd, Ste 300, Huntersville NC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCGO1 COC# NCC203413
Project Name Courtyard at Eastfield Farm(formerly EPCON - Eastfield Road) EPM#403578
Financially Responsible Owner(FRO) EPCON Eastfield Farm LLC-M Davis
FRO Address 11020 David Taylor Drive,Suite 105,Charlotte, NC 28262
Project Location Across road from 14228 EASTFIELD RD HUNTERSVILLE NC 28078
River Basin/Watershed Lower Clarke
w
EC Final Inspection Date 8/29/2024 Start Time 11:00 AM End Time 11:45 AM
Inspector Name Anne Loftin
Others Present none
Weather Conditions Sunny Soil Conditions Workable
Onsite Contact Made No Name
Title/Company
Report Sent Yes See dispatch list at bottom of report
Erosion/Sediment measures removed? Yes
Site Permanently Stabilized? Yes
Comment
BMP's Installed Per Approved Plan? Yes
As-Built BMP Project# As-builts approved ASB-500039 8/28/24
FINAL INSPECTION COMMENTS
Project is completed,stable and the erosion measures removed. 3 sand filters on site were found stable and functioning. Minor
maintenance notes sent as a reminder for maintenance and monitoring during the two-year maintenance bond period. Photo documents
send with this report on distribution below.
DISPATCH LIST
M Davis—FRO<mdavis@epconcommunities.com>; Russ Graham
<rgraham@epconcommunities.com>;AGibbon@EPCONCommunities.com; brossi@emht.com + internal staff: Brian
Richards,Au'Darius Blackwook, Cecil Talbot and Kim Behrenbrinker
1 of 1
Report Date: 9/9/2024