Loading...
HomeMy WebLinkAbout310843_Compliance Evaluation Inspection_20240930Q"ivision of Water Resources Facility Number - FM-1 O Division of Soil and Water Conservation O Other Agency Type of Visit: ompliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: p Arrival Time: Departure Time: /nr : /� County • Region: Farm Name: T (ai-yu Owner Email: _ Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: �-ws 3I o8q3 Swine Wean to Finish Wean to Feeder 'Peeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -La er liry routtry Layers Non -Layers Pullets Turkeys Turkey Pouets Other Design Current Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow [:]Yes Q4 ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ o ❑ NA ❑ NE F—] Yes [No ❑ NA ❑ NE ❑ Yes WNo ❑ NA ❑ NE Page 1 of 3 511212020 Continued