HomeMy WebLinkAbout310843_Compliance Evaluation Inspection_20240930Q"ivision of Water Resources
Facility Number - FM-1 O Division of Soil and Water Conservation
O Other Agency
Type of Visit: ompliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance
Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: p Arrival Time: Departure Time: /nr : /� County • Region:
Farm Name: T (ai-yu Owner Email: _
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
�-ws 3I o8q3
Swine
Wean to Finish
Wean to Feeder
'Peeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -La er
liry routtry
Layers
Non -Layers
Pullets
Turkeys
Turkey Pouets
Other
Design Current
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
[:]Yes Q4 ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ o
❑ NA
❑ NE
F—] Yes [No
❑ NA
❑ NE
❑ Yes WNo
❑ NA
❑ NE
Page 1 of 3 511212020 Continued