Loading...
HomeMy WebLinkAboutWildlands Cape Fear 02 - Flat Rock - Monitoring Year 0 Report_SAW-2021-01309_Credit Release ScheduleProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 7,975.80 34.535 7,975.80 34.535 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%1,196.37 15%5.180 15%Jul-23 8/23/2023 2 (Year 0/As-Built)3 15%1,196.37 15%5.180 15%Aug-24 3 (Year 1 Monitoring)10%797.58 10%3.453 10%Apr-25 4 (Year 2 Monitoring)10%797.58 10%3.453 15%Apr-26 5 (Year 3 Monitoring)10%797.58 15%5.180 20%Apr-27 6 (Year 4 Monitoring)5%398.79 5%1.726 10%Apr-28 7 (Year 5 Monitoring) 10% 797.58 15%5.180 15%Apr-29 8 (Year 6 Monitoring)5%398.79 5%1.726 NA NA Apr-30 9 (Year 7 Monitoring)10%797.58 10%3.453 NA NA Apr-31 Stream Bankfull Standard4 10%NA NA NA NA NA NA Varies4 Total Credits Release to Date 15%2,392.74 15%10.360 Date 4 - A 15% reserve of credits to be held back until the bankfull event performance standard has been met. Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Current and Future Credit Releases Credit Release Milestone Stream Credits Forested Wetland Credits Non-Forested Wetland Credits Projected Release Date Actual Release Date Potential Credits from As-Built Survey SAW-2021-01309 Year Project Instituted:2021 20211424 v1 Date Prepared:7/22/2024 Total Potential Credits Credit Classification Stream Credits Forested Wetland Credits Potential Credits from Mitigation Plan Wilmington District Mitigation Bank Credit Release Schedule Flat Rock County:Guilford Wildlands Holdings VI, LLC 8-Digit HUC:03030002 797.58 10 SEP 2024