Loading...
HomeMy WebLinkAboutNCC221296_NOT Closeout Documents_20240927 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Franklin Project: Novozymes Discharge Pipeline& River basin: Tar-Pamlico Person financially responsible:Novozymes North America,Inc.-Bradley T Cole, Project#: FRANK-2022-032 Chief Financial Officer Address: P.O.Box 576,Franklinton,NC 27525 1. Project Location: NC HWY56/Perry's Chapel Ch Rd., Pictures: No Franklinton 2. Weather and soil conditions: Overcast,Wet,Not Workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: September 26,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Sloped areas have demonstrated resilience to erosion despite heavy rainfalls. Outfall area is well stabilized. Some areas,including access path to outfall,would benefit from additional seed and soil amendments to ensure future success of permanent groundcover.Please refer to your other permits if you eventually wish to change cover material. Thank you for your communication and commitment to compliance for this project. Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 Reported by: Mattie Frazier Others present: S Stadleman,R Green,D Kusy Date of inspection: September 24,2024 Time arriving on site: 11:40 AM Time leaving site: 12:50 PM CC: