Loading...
HomeMy WebLinkAboutNC0025453_Historical information_20151231May 20 2015 Subject: Dear Mr. Warren: Pat McCrory Governor In order to gather the appropriate data, all effluent mercury analysis must be conducted using the low level Method 1631 E. This could be accomplished through the NPDES permit as a monitoring requirement, butthat may require more frequent sampling than what is required by the Pretreatment monitoring plan. Therefore, if you are not already doing so, beginning July 1, 2015 any effluent analysis for mercury must be done using EPA test Method 1631 E. You do not have to update your monitoring plan at this time; a copy of this letter in the file will document this requirement. Thank you for your continued cooperation with the Pretreatment Program. If you have any questions please contact me at (919) 807-6383 or via email [Deborah.Gore@ncdenr.gov]. As you may know, in 2012 North Carolina adopted an EPA approved statewide mercury total maximum daily load (TMDL). To demonstrate compliance with the TMDL Permittees must be able to quantify the amount of mercury being discharged from point sources to the lower reporting level of the procedure. 1601 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-8600 \ Internet: www.ncdenr.gov An Equal Opportunity \ Affirmative Action Employer - Made in part by recycled paper Donald R. van der Vaart Secretary James Warren Town of Clayton P.O. Box 879 Clayton, NC 27520 Cc: Central Files NPDES permit file Raleigh Regional Office Pretreatment file PERCS Use of Method 1631 for Mercury Analysis Program: Clayton County: Johnston NPDES#: NC0025453 NCDENR North Carolina Department of Environment and Natural Resources Sincerely, Deborah Gore PERCS Unit Supervisor I Regio S. TRO ■ <DO SC SETT I L EVes No No &Yes No EYes No E^Yes No __ _______ _. ptelWTEIVlgW r- III. Total Residual Chlorine I □"Yes EYes EYes 0Yes No No No No No No jvYYes Are the following items documented (V where applicable): Item . v _____ •, x' Date of sample collection*__________ Time of sample collection*__________ Sample collector’s initials or signature Date of sample analysis*___________ Time of sample analysis*___________ Analyst initials or signature_________ Sample location______________________________________________________ ‘Date and time of sample collection and analysis may be the same for in situ or on-site measurements. Facility Name: K//^/~ NPDES#: ^0 06,75^ 93 Field Lab Certification #: Lab Contact: fAJ, | | (3/v> I. r ■ - 0Yotal Residual Chlorine (TRC) EpH ETYes No OYes No Jd Yes EYes Yffies C No Effies No Mon Inspectors’ Checklist for F^i Parameters Regional Plant Inspector: A/) / /c A 5_____ Regional Inspector Contact #: 7 / 9/ 77 / / Region: Date: j Q. 23^ 2d M Check the parameter(s) performed at this site for reporting purposes. ) 03emperature (TEMP) Ef^pecific Conductivity (SC) □"Dissolved Oxygen (DO) Settleable Residue (SETT) II. General Laboratory (note any exceptions in section XI)________________ Are instruments, meters, probes, photometric cells, etc, maintained in good condition? Are standards, reagents and consumables used within manufacturer expiration dates? [TRC gel standard is exempt.] Total Residual Chlorine meter make and model: Iak P Z Is a check standard analyzed each day of use? (Circle one: gel or liquid standard) What is the assigned/observed value of the daily check standard?____________________ Is a 5-point calibration verification performed? Note date of last verification:/^9^1, Alternatively, does the lab construct a linear regression, using 5 standards, to calculate results? Note date of last calibration curve constructed: True values: [g'|jg/L mg/L r>,0^^. Q.0S-5L. O'Q. 5 4 Obtained values: [^pg/L mg/L fa,_ 3 / 7 / What program are samples analyzed on? jQQ n fd_____________ Are results reported in proper units? Check one: Epg/L mg/L Are results reported between the facility’s permit limit and the compliance limit of 50 pg/L? If value is less than the low standard, report as “<x”, where x=low standard cone.________ Are samples analyzed within 15 minutes of collection?_____________________________ IV- pH ______________ , ___________ - pH meter make and model: C/i Is the pH meter calibrated with at least 2 buffers per mfg’s instructions each day of use? Note buffers used: 0 , Q___________________________________________ Is the pH meter calibration checked with an additional buffer each day of use? Note check buffer used: '______________________________________- Does the check buffer read within ±0.1 S.U. of the known value?____________________ Are the following items documented:___________________________________________ Meter calibration?___________;______'_____________________________;_____ __ Check buffer reading?_________________________________________________ _ Are samples analyzed within 15 minutes of. collection?_____________________________ Are sample results reported to 0.1 pH units? —n No[RYes n/FOT No □-Yes No □Yes19m No YeSvYaYfoX/ Additional comments:XI. Electronic copies may be emailed to linda.chavis@ncdenr.qov. Revision 04/20/2012 Please submit a copy of this completed form to the Laboratory Certification program at: DWQ Lab Certification, Chemistry Lab, Courier # 52-01-01 |gj Hi Hi □Yes Yes No No No No No _J No No No ~ No Z No No □Yes [BVes □Yes ^Yes ^es ^Yes Yes Yes Yes Yes Yes Yes Yes Yes □Yes- No No No No No No No ....... .... V, Temperature______________ What instrument(s) is used to measun DO meter Conductivity meter E □Yes No iperature? Check all that applyHEf^O^ter lital thermometer □'Glass thermometer Is the instrument/thermometer calibration checked at least annually against a NIST traceable or NIST certified thermometer? Are temperature corrections (even if zero) posted on the instrument/thermometer? Are samples measured in situ or on-site? [REQUIRED - there is no holding time for temperature] _____________ Are sample results reported in degrees C? VI. Dissolved- Oxygem';' DO meter make and model:________________ Is the air calibration of the DO meter performed each day of use?__________________ Are the following items documented:_______________________________________ Meter calibration? _________________ ____________________________. Are samples analyzed within 15 minutes of collection?_______________________ Are results reported in mg/L?— VII. Conductivity _____■ ' Conductivity meter make and model: Is the meter calibrated daily according to the manufacturer’s instructions? Note standard used (this is generally a one-point calibration): Is a daily check standard analyzed? Note value: \C)OC). Are the following items documented: ' ' Meter calibration?____________________________________ Are samples analyzed within 28 days of collection?___________ Are results reported in pmhos/cm (some meters display equivalent pS/cm units)? VIII. Settleable Residue . Does the laboratory have an Imhoff Cone in good condition?______________________ Is the sample settled for 1 hour?___________ _________________________________ Is the sample agitated after 45 minutes?________ _____________________________ Are the following items documented:_________________________________________ Volume of sample analyzed? Note volume analyzed:__________________________ Date and time of sample analysis (settling start time)?_________________________ Time of agitation after 45 minutes of settling?_______________________________ Sample analysis completion (settling end time)?_____________________________ Are samples analyzed within 48 hours of collection?____________________________ Are results reported in ml/L?_______________________________________________ performed? If sdj list months reviewed: i _____________ Is follow-up by the Laboratory Certification program recommended? October 27, 2015 Subject: Dear Mr. Biggs: On October 23, 2015, Mitch An Equal Opportunity \ Affirmative Action Employer - Made in part by recycled paper Pat McCrory Governor Donald R. van der Vaart Secretary R. Stephen Biggs, Town Manager Town of Clayton P.O. Box 879 Clayton, North Carolina 27520 Division of Water Resources, Raleigh Regional Office. Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Location: 3800 Barrett Drive. Raleigh. NC 27609 1. Permit NC0025453 became effective May 1,2014 and will expire March 31, 2018. Changes to the permit include: monitoring for copper and zinc was eliminated; Quarterly monitoring for mercury using low level Method 1631 E was added to the permit; monitoring for BOD, TSS, NH3-N, and Fecal Coliform was reduced to 2/week. Phone: (919) 791-4200 Fax: (919) 788-7159 Compliance Evaluation Inspection Town of Clayton - Little Creek Water Reclamation Facility NPDES Permit No. NC0025453 Johnston County 2. The 2.5 MOD water reclamation facility consists of the following units: influent head works with a biofilter odor control system that includes a Fiberglass Reinforced Plastic (FRP) cover; mechanical and automatic bar screens; a vortex type grit removal system; influent pump station with three (3) 60 Hp dry pit submersible pumps and one 40 Hp pump; 9 inch Parshall flume with ultrasonic flow meter; a 214,500 gallon anaerobic selector tank in front of the first stage anoxic tank; a 300,000 gallon first stage anoxic tank in front of oxidation basin # 2; 2 - oxidation basins; a 200,000 gallon first stage anoxic tank in front of oxidation basin # 1; three (3) secondary clarifiers; Return Activated Sludge pump station; two shallow bed DAVCO traveling bridge type tertiary filters; UV disinfection, two banks, with back-up chlorination / dechlorination; effluent pump station; one 90,000 gallon aerated digester/sludge stabilization tank; two - 360,000 gallon aerated sludge holding tanks; sludge loading station; a sludge thickening building containing two (2) rotary drum thickeners with polymer flocculation; sludge transfer pump station; sludge drying beds; in- plant non-potable water system using reclaimed treated wastewater; a reclaimed water pump station and transmission force main to the Pine Hollow Golf Course and two on-site generators and one portable generator to provide back-up power. Hayes of the Raleigh Regional Office conducted a compliance evaluation inspection of the subject facility. The assistance of James Warren, grade WW-4 Operator in Responsible Charge (ORC), and William Simpson was appreciated. Please find the attached Basin Wide Information Management System (BIMS) inspection checklist summarizing each inspection. Below is a list of recommendations and findings developed from the inspection: _L North Carolina Department of Environmental Quafity 1_ 3. 4. 5. S^icereiy, cc: Permit files Central files At the time of inspection, the biofilter odor control system appear to be operating normally based on very little odor at the influent head works. The automatic and manual bar screens and vortex grit removal system were functioning normally. The number 1 aerated sludge holding tank was approximately 20% full. The number 2 aerated sludge holding tank was approximately 60% full. Aerators in sludge holding tank number 1 and 2 were operational. Sludge was not being thickened in the rotary drum thickener at the time of inspection. Influent in the two oxidation basins was medium brown in color with very little foam. DO flowing out of oxidation basin number 2 was 1.34 mg/l. Covers have been placed over the anaerobic selector to prevent odor. The #2 secondary clarifier was being taken down for general maintenance. Effluent appeared clear flowing off the weirs in secondary clarifiers 1 and 3. Effluent in the wet well at the tertiary filters appeared clear with no foam. The sludge drying beds had no sludge in them. Biosolids are land applied under the Town of Clayton Land Application Permit WQ0023178. The permit will was reissued May 19, 2015, became effective October 01, 2015 and will expire September 30, 2020. Granville Farms is designated the back-up hauler to land apply biosolids under the GFI Residuals Land Application Program under permit WQ0000838. A Certificate of Approval was issued December 17, 2010 to Johnston County Residuals Dewatering Facility to accept up to 150 dry tons of residuals per year from Little Creek Water Reclamation Facility. The laboratory was checked in a cursory manner. Little Creek Wastewater WRF laboratory analyzes BOD, TSS, fecal coliform, Phosphorus, Nitrate, COD and is field certified for TRC, pH, temperature, DO, specific conductance. Environment One is the contract lab that analyzes all other parameters. All instruments, meters, probes, photometric cells are maintained in good condition. All standards, reagents and consumables used are within expiration dates. Danny Smith, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office I would like to thank James Warren and William Simpson for their time and assistance with this inspection. If you have any questions about the inspection or this letter, please contact Mitch Hayes at 919.791.4200 or at mitch.hayes@ncdenr.qov 6. Discharge Monitoring Reports (DMR’s) for the period December 2011 through September 2015 were reviewed for compliance with permit limits and monitoring requirements. A BOD data point was left off for 10.04.2014. A conductivity data point was left off for 08.15.2015. Mr. Warren stated that revised DMR’s would be sent in. There were no other violations listed for the review period. ERA Section A: National Data System Coding (i.e., PCS) Inspection Typeyr/mo/dayNPDES 32 I 15/10/23NC0025453 >6 ■Reserved-Bl 72 73I3 Section B: Facility Data Entry Time/Date Permit Effective Date 14/05/0115/10/2310:30AM Little Creek WWTP Exit Time/Date 1000 Durham St 15/10/2301:00PM Clayton NC 27520 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) DateAgency/Office/Phone and Fax NumbersName(s) and Signature(s) of Inspector(s) RRO WQ//919-791-4200/ ^7,^/5 Signature 1Page# J17I11 Flow Measurement Sludge Handling Disposal Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) | Permit | Self-Monitoring Program fl Laboratory Steven Biggs,PO Box 879 Clayton NC 27520/Town Manager/919-553-5866/9195531541 fl Operations & Maintenance | Records/Reports fl Facility Site Review fl Effluent/Receiving Waters /// Charles Elwood Harrell/ORC/919-553-1535/ James O Warren//919-553-1536 /9195531918 James O Warren/ORC/919-553-1536/ R Steven Biggs/ManagerTown/919-553-5002 /9195538919 United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Permit Expiration Date 18/03/31 Facility Self-Monitoring Evaluation Rating 70 Inspector 19 QA N 121 Inspection Work Days 671 Transaction Code 1 Fac Type 20 u LH74 7SI I I I I I I I80 LI 2L 21l I I I I I I I I I 11 I i i I I I I I I I I I I I I I I I I I I I I 11 I I i I I F 71U 18 L Mitchell S Hayes df Management cA Reviewer ./ „ Aqpncy/Office/Phone apd Fax NumBers Date ----------< T V— ZPK Form 356C/3 (Rev 9-94) Previous editions are obsolete. 1(Cont.) 3[18 2Page# I11 12[ NPDES NC0025453 The laboratory was checked in a cursory manner. Little Creek Wastewater WRF laboratory analyzes BOD, TSS, fecal coliform, Phosphorus, Nitrate, COD and is field certified for TRC, pH, temperature, DO, specific conductance. Environment One is the contract lab that analyzes all other parameters. All instruments, meters, probes, photometric cells are maintained in good condition. All standards, reagents and consumables used are within expiration dates. yr/mo/day 15/10/23 Biosolids are land applied under the Town of Clayton Land Application Permit WQ0023178. The permit will was reissued May 19, 2015, became effective October 01,2015 and will expire September 30, 2020. Granville Farms is designated the back-up hauler to land apply biosolids under the GFI Residuals Land Application Program under permit WQ0000838. A Certificate of Approval was issued December 17, 2010 to Johnston County Residuals Dewatering Facility to accept up to 150 dry tons of residuals per year from Little Creek Water Reclamation Facility. Inspection Type LJJ17 Discharge Monitoring Reports (DMR’s) for the period December 2011 through September 2015 were reviewed for compliance with permit limits and monitoring requirements. A BOD data point was left off for 10.04.2014. A conductivity data point was left off for 08.15.2015. Mr. Warren stated that revised DMR’s would be sent in. There were no other violations listed for the review period. The 2.5 MGD water reclamation facility consists of the following units: influent head works with a biofilter odor control system that includes a Fiberglass Reinforced Plastic (FRP) cover; mechanical and automatic bar screens; a vortex type grit removal system; influent pump station with three (3) 60 Hp dry pit submersible pumps and one 40 Hp pump; 9 inch Parshall flume with ultrasonic flow meter; a 214,500 gallon anaerobic selector tank in front of the first stage anoxic tank; a 300,000 gallon first stage anoxic tank in front of oxidation basin # 2; 2 - oxidation basins; a 200,000 gallon first stage anoxic tank in front of oxidation basin # 1; three (3) secondary clarifiers; Return Activated Sludge pump station; two shallow bed DAVCO traveling bridge type tertiary filters; UV disinfection, two banks, with back-up chlorination / dechlorination; effluent pump station; one 90,000 gallon aerated digester/sludge stabilization tank; two - 360,000 gallon aerated sludge holding tanks; sludge loading station; a sludge thickening building containing two (2) rotary drum thickeners with polymer flocculation; sludge transfer pump station; sludge drying beds; in-plant non-potable water system using reclaimed treated wastewater; a reclaimed water pump station and transmission force main to the Pine Hollow Golf Course and two on-site generators and one portable generator to provide back-up power. At the time of inspection, the biofilter odor control system appear to be operating normally based on very little odor at the influent head works. The automatic and manual bar screens and vortex grit removal system were functioning normally. The number 1 aerated sludge holding tank was approximately 20% full. The number 2 aerated sludge holding tank was approximately 60% full. Aerators in sludge holding tank number 1 and 2 were operational. Sludge was not being thickened in the rotary drum thickener at the time of inspection. Influent in the two oxidation basins was medium brown in color with very little foam. DO flowing out of oxidation basin number 2 was 1.34 mg/l. Covers have been placed over the anaerobic selector to prevent odor. The #2 secondary clarifier was being taken down for general maintenance. Effluent appeared clear flowing off the weirs in secondary clarifiers 1 and 3. Effluent in the wet well at the tertiary filters appeared clear with no foam. The sludge drying beds had no sludge in them. Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Permit NC0025453 became effective May 1, 2014 and will expire March 31,2018. Changes to the permit include: monitoring for copper and zinc was eliminated; Quarterly monitoring for mercury using low level Method 1631 E was added to the permit; monitoring for BOD, TSS, NH3-N, and Fecal Coliform was reduced to 2/week. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? Comment: Permit Yes No NA NE ■ Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Quarterly monitoring for mercury using low level Method 1631 E was added to the permit.Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DM Rs? Is the chain-of-custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? 3Page# Owner - Facility: Inspection Type: Little Creek WWTP Compliance Evaluation Does the facility analyze process control parameters, for ex: MLSS, MORT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? (If the present permit expires in 6 months or less). Has the permittee submitted a new application? (If the facility is = or > 5 MOD permitted flow) Do they operate 24/7 with a certified operator on each shift? ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Permit: NC0025453 Inspection Date: 10/23/2015 ■ ■ ■ Record Keeping Yes No NA NE ■ Facility has copy of previous year's Annual Report on file for review? Facility is rated 2.5 MGDComment: Flow Measurement - Influent Yes No NA NE ■ # Is flow meter used for reporting? ■ Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Aerobic Digester Yes No NA NE Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge?■ Comment: Solids Handling Eguipment Yes No NA NE Is the equipment operational?■ Is the chemical feed equipment operational? Is storage adequate?■ Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake?■ The facility has an approved sludge management plan? The 2-rotary drum thickeners were not in use at the time of inspectionComment: Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Are all pumps present?■ Are all pumps operable?■ 4Page# ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Permit: NC0025453 Inspection Date: 10/23/2015 Owner - Facility: Little Creek Inspection Type: Compliance Evaluation Little Creek WWTPPermit: NC0025453 Inspection Date: 10/23/2015 Pump Station - Influent Yes No NA NE ■ Are float controls operable? ■ Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ■ Are the bars adequately screening debris? ■ Is the screen free of excessive debris? ■ Is disposal of screening in compliance? ■ Is the unit in good condition? Comment: Grit Removal Yes No NA NE Type of grit removal a.Manual b.Mechanical ■ Is the grit free of excessive organic matter? ■ Is the grit free of excessive odor? ■ # Is disposal of grit in compliance? Comment: Secondary Clarifier Yes No NA NE ■ Is the clarifier free of black and odorous wastewater? ■ Is the site free of excessive buildup of solids in center well of circular clarifier? ■ Are weirs level? ■ Is the site free of weir blockage? ■ Is the site free of evidence of short-circuiting? ■ Is scum removal adequate? ■ Is the site free of excessive floating sludge? ■ Is the drive unit operational? 5Page# Owner - Facility: Inspection Type: Compliance Evaluation Little Creek WWTPPermit: NC0025453 Inspection Type:Inspection Date: 10/23/2015 Secondary Clarifier Yes No NA NE ■ Is the return rate acceptable (low turbulence)? ■ Is the overflow clear of excessive solids/pin floc? ■ Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) Comment: Oxidation Ditches Yes No NA NE ■ Are the aerators operational? ■ Are the aerators free of excessive solids build up? ■ # Is the foam the proper color for the treatment process? ■ Does the foam cover less than 25% of the basin’s surface? ■ Is the DO level acceptable? ■Are settleometer results acceptable (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/l) ■Are settelometer results acceptable?(400 to 800 ml/l in 30 minutes) Comment: Filtration (High Rate Tertiary)Yes No NA NE Type of operation:Down flow ■ Is the filter media present? ■ Is the filter surface free of clogging? ■ Is the filter free of growth? ■ Is the air scour operational? ■ Is the scouring acceptable? ■ Is the clear well free of excessive solids and filter media? Comment: Disinfection - UV Yes No NA NE ■ Are extra CIV bulbs available on site? ■ Are UV bulbs clean? ■ Is UV intensity adequate? ■ Is transmittance at or above designed level? ■ Is there a backup system on site? 6Page# The #2 secondary clarifier was being taken down for general maintenance. Effluent appeared clear flowing off the weirs in secondary clarifiers 1 and 3. Influent in the two oxidation basins was medium brown in color with very little foam. DO flowing out of oxidation basin number 2 was 1.34 mg/l. Owner - Facility: Compliance Evaluation 1 Little Creek WWTP Compliance Evaluation Disinfection - UV Yes No NA NE Is effluent clear and free of solids? Chlorination is used as a back-upComment: Standby Power Yes No NA NE ■ Is automatically activated standby power available? ■ Is the generator tested by interrupting primary power source? ■ Is the generator tested under load? ■ Was generator tested & operational during the inspection? ■ Do the generator(s) have adequate capacity to operate the entire wastewater site? ■ Is there an emergency agreement with a fuel vendor for extended run on back-up power? ■ Is the generator fuel level monitored? Comment: Pumps-RAS-WAS Yes No NA NE ■ Are pumps in place? ■ Are pumps operational? ■ Are there adequate spare parts and supplies on site? Comment: Laboratory Yes No NA NE ■ Are field parameters performed by certified personnel or laboratory? ■ Are all other parameters(excluding field parameters) performed by a certified lab? ■ # Is the facility using a contract lab? ■ ■ Incubator (Fecal Coliform) set to 44.5 degrees Celsius*/- 0.2 degrees? ■ Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees? Comment: Influent Sampling Yes No NA NE ■ # Is composite sampling flow proportional? ■ Is sample collected above side streams? 7Page# Owner - Facility: Inspection Type: # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Permit: NC0025453 Inspection Date: 10/23/2015 There are 2-on site generators and 1-portable generator to provide back-up power generation. Little Creek Wastewater WRF laboratory analyzes BOD, TSS, fecal coliform, Phosphorus, Nitrate, COD and is field certified for TRC, pH, temperature, DO, specific conductance. Environment One is the contract lab that analyzes all other parameters. Little Creek WWTP Compliance Evaluation Influent Sampling Yes No NA NE ■ Is proper volume collected? ■ Is the tubing clean? ■ ■ Is sampling performed according to the permit? Temperature in the composite sampler was 5.0 degrees C.Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ■ Is sample collected below all treatment units? ■ Is proper volume collected? ■ Is the tubing clean? ■ ■ Temperature in the composit sampler was 4.5 degrees C.Comment: 8Page# Owner - Facility: Inspection Type: Permit: NC0025453 Inspection Date: 10/23/2015 # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)?