HomeMy WebLinkAboutNC0025453_Historical information_20081231January 10, 2008
Subject:
Dear Mr. Biggs:
inspection. Below is a list of recommendations and findings developed from the inspection:
1.
2.
3.
Mr. R. Stephen Biggs, Town Manager
Town of Clayton
P.O. Box 879
Clayton, North Carolina 27520
Raleigh Regional Office Surface Water Protection Phone (919) 791.4200
1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919)788.7159
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Surface Water Protection
Raleigh, NC 27699-1628
Compliance Evaluation Inspection
Town of Clayton Little Creek WRF
NPDES Permit No. NC0025453
Stormwater Permit NCG110080
Johnston County
The two aerated sludge holding tanks
early January 2008. Clarifier # 1 was
&
3^
North Carolina Division of Water Quality
Internet: www.ncwaterqualitv.org
0^p.
>
At the time of inspection, the aerated digester was being used to store scum from the clarifiers,
were approximately 50% full. Sludge hauling was to begin
offline due to low influent flow. Sludge judge readings for
_______NpnhCarolina
Naturally
Customer Service
1.877.623.6748
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
The 2.5 MGD water reclamation facility consists of the following units: influent head works with
a FRP cover system and odor control system including mechanical screening and a vortex type
grit removal system; influent pump station with ultrasonic flow meter with back-up float alarm; a
new 214,500 gallon anaerobic basin in front of oxidation basin # 2; a new 300,000 gallon anoxic
tank in front of oxidation basin # 2; a new 200,000 gallon anoxic in front of oxidation basin # 1;
three (3) secondary clarifiers; two shallow bed DAVCO traveling bridge type tertiary filters; UV
disinfection with back-up chlorination / dechlorination; effluent pump station; one existing
90,000 gallon aerated digester/sludge stabilization tank; one new aerated 360,000 gallon sludge
holding tank; one existing aerated 360,000 gallon sludge holding tank; sludge loading station; a
new sludge thickening building containing a rotary drum thickener; sludge drying beds; in-plant
non-potable water system using reclaimed treated wastewater; a reclaimed water pump station
and transmission force main to the Pine Hollow Golf Course (scheduled completion 02/06/2008)
and two on-site generators to provide back-up power. The clerigester, trickling filter, and
secondary clarifier of the original plant are not in use and are abandoned.
On December 17, 2007 Mitch Hayes of the Raleigh Regional Office conducted a compliance
evaluation inspection of the subject facility. The assistance of James Warren grade WW-4 Operator in
Responsible Charge (ORC) with this inspection was gratefully appreciated. Please find the attached
Basin Wide Information Management System (BIMS) inspection checklist summarizing each
The subject permit was modified and became effective November 01, 2006 and will expire
March 31, 2008. A permit renewal application was received on October 11, 2007 and is currently
under review. Please continue to operate under the last issued permit until a new permit is issued.
7.
8.
Stormwater Permit NCG110062
Little Creek WRF CEI
Page 2
10. There are six outfalls listed for the facility:
a) Outfall 001 consists of drainage from the return sludge pump station; on-site generator
area, chlorine contact chamber and effluent pump station. Flow is conveyed by concrete
Commercial lab results, chain of custody records, and bench sheets were compared with data
submitted on the DMR for the month of September 2007. No discrepancies were noted.
6. The laboratory was checked in a cursory manner. All instrument calibration logs are being
maintained on computer. An operator’s logbook was available and being maintained. Fecal
coliform bath temperature was 44.6 degrees C and the drying oven temperature was 106 degrees.
The influent and effluent flow meters were calibrated October 07, 2007. Influent sampler
temperature was 2 degrees C. and the effluent sampler temperature was 3 degrees C.
Discharge Monitoring Reports (DMR’s) for the period December 2006 to September 2007 were
reviewed for compliance with permit limits and monitoring requirements. The BIMS computer is
flagging monitoring violations for chronic toxicity for 12/2006, 03/2007, 06/2007, and 09/2007.
These violations appear to be caused by using the code THP3B for reporting pass/fail results for
chronic toxicity. Please use the code TGP3B when reporting pass/fail results for chronic toxicity.
Monitoring violation for silver was recorded for 01/2007. A pH value of 73 was recorded
05/07/2007 most likely should have been recorded as 7.3. Total residual chlorine is reported as
exceeding the permit limit on 09/06/2007, 09/27/2007, and 09/28/2007. This is reported under
the column TOTAL RESIDUE parameter code 00500. Currently the Little Creek WRF has no
parameter listed however, there is a total suspended residue listed. Please clarify and send in an
amended September 2007 DMR. The annual pollutant scan that is attached to the September
2007 DMR list the Total Residual Chlorine (TRC) result as 12 ug/1. The grab sample for the
TRC analyses was taken 08/23/2007 lists the results on the August 2007 DMR as 0.12ug/l.
Please clarify the August 2007 TRC result and send in an amended DMR. There were no other
violations listed for the review period.
5. In-plant non-potable water using treated wastewater effluent is utilized throughout the plant
under permit WQ0024223. The reuse generation distribution line and pump station with force
main to the Pine Hollow Golf Course is covered under permit WQ22224. Reuse, reclaim water,
and land application permits are currently managed by the Aquifer Protection Section.
clarifier # 2 was 3 feet and clarifier # 3 was 1 foot with both clarifiers having sidewall depths of
14 feet. Effluent appeared clear flowing evenly over the weirs with no blockage. There was no
scum noted in either clarifier. The rotary drum thickener was not being operated at the time of
inspection. Effluent flowing off the tertiary filters appeared clear with no foam or odor. Each
effluent turbine pump is scheduled to be rebuilt. Excavation around the three effluent turbine
pumps has already begun. The effluent discharge pipe was submerged at the time of inspection.
Effluent appeared clear discharging into the Neuse River with no negative impacts.
4. Biosolids are land applied under the Town of Clayton Land Application Permit WQ0023178.
Granville Farms is designated the back-up hauler to land apply biosolids under the GFI Residuals
Land Application Program under permit WQ0000838.
9. Inspection of the stormwater outfalls and plant site was conducted at the same time as the CEI
wastewater treatment plant. Permit NCG110062 was issued and became effective on June 27,
2003 and will expire on April 30, 2008.
b)
c)
d)
e)
0
Little Creek WRF CEI
'Page 3
Cc: Central Files
Permit Files
Sincerely,
Mitch Hayes
Environmental Specialist
pipe and discharges to a
filter structure. There
ditch appeared clear.
I would like to thank James Warren for his time and assistance with this inspection. If you have
any question concerning the inspection or the checklists, please contact me at 919.791.4261.
small drainage ditch behind the on-site generator and tertiary
was no discharge at the time of inspection. Water in the drainage
Outfall 002 receives drainage from the grassy area in front of oxidation basin number 1,
the area in front of the aerobic digester; chemical feed building, the area around the
sludge holding tanks and the sludge loading station. These combined flows discharge into
a small ditch. There was no discharge at the time of inspection. Water in the ditch
appeared muddy most likely from recent rains.
Outfall 003 receives flow from the on-site generator and fuel tank behind the operations
building, and area near the aerobic digester. The combined flows discharge to low lying
area across from the right side of the operations building.
Outfall 004 receives flow from the parking lot and in front of the operations building.
The discharge point is across the street into a small ditch. There was no discharge at the
time of inspection. There was no water in the ditch.
Outfall 005 receives stormwater flow from the area around the influent pump station and
the reclaimed water pump station. Combined flows discharge to a low-lying area east of
the influent pump station. There was no discharge at the time of inspection. Water at the
discharge point appeared clear.
Outfall 006 is located near the tertiary filter structure. The drainage area around the return
sludge pump and secondary clarifier number 1 and 2 discharge into outfall 006. At the
time of inspection a sediment trap had been constructed from crushed stone in front of the
discharge point. Outfall 006 discharges into a wooded area. There was no discharge at the
time of inspection.
11. Qualitative monitoring for all outfalls was conducted on June 27, 2007 and December 12, 2007.
There is no vehicle maintenance done on site. There have been no spills for the 2006-2007 year.
The stormwater pollution prevention control plan was amended in 2007. Annual employee
training on spill prevention and response occurred on December 13, 2007.
EPA
NPDES
NC0025453
I I I I I I |6£
Entry Time/Date Permit Effective Date
06/11/01Little Creek WWTP
Durham St Extension Exit Time/Date Permit Expiration Date
Clayton NC 27520 08/03/31
Other Facility Data
James O Warren//919-553-1536 /9195531918
James O Warren/ORC/919-553-1536/
Name, Address of Responsible Official/Title/Phone and Fax Number
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Mitchell S Hayes RRO WQ//919-791-4200/
2^^
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page #1
12l3l
United States Environmental Protection Agency
Washington, D C. 20460
| Operations & Maintenance
Facility Site Review
{]■ Storm Water
yr/mo/day
07/12/17
Contacted
Yes
Records/Reports
Compliance Schedules
QA
72 M
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Facility Self-Monitoring Evaluation Rating
70LU
J"
Fac Type
20UJ17
Inspection Type
18EJ
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
m Flow Measurement
Sludge Handling Disposal
Laboratory
Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Water Compliance Inspection Report
Section A: National Data System Coding (i.e„ PCS)
Inspector
19Li
73l I I74
—Reserved---------------------
75l I I I I I I 180
Permit
■ Self-Monitoring Program
Effluent/Receiving Waters
Section D:
Bl
71 u
________________________________________________Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Steven Biggs,P0 Box 879 Clayton NC 27520/Town
Manager/919-553-5866/9195531541
Transaction Code
1 Lil 2 Lil
12:25 PM 07/12/17
09:45 AM 07/12/17
Remarks
21| I I I I I I I I I I I I I I I I I I | | | | | | | | | | | | | | | | | | | | |
Inspection Work Days
671 I 69
(cont.)1
3l
NPDES yr/mo/day Inspection Type
NC0025453 |11 121 07/12/17 | 17 18[cj
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)______
The 2.5 MGD water reclamation facility consists of the following units: influent head works with a FRP cover
system and odor control system including mechanical screening and a vortex type grit removal system
influent pump station with ultrasonic flow meter with back-up float alarm; a new 214,500 gallon anaerobic
basin in front of oxidation basin # 2; a new 300,000 gallon anoxic tank in front of oxidation basin # 2; a new
200,000 gallon anoxic in front of oxidation basin # 1; three (3) secondary clarifiers; two shallow bed DAVCO
traveling bridge type tertiary filters; UV disinfection with back-up chlorination / dechlorination; effluent pump
station; one existing 90,000 gallon aerated digester/sludge stabilization tank; one new aerated 360 000
gallon sludge holding tank; one existing aerated 360,000 gallon sludge holding tank; sludge loading station-
a new sludge thickening building containing a rotary drum thickener; sludge drying beds; in-plant
non-potable water system using reclaimed treated wastewater; a reclaimed water pump station and
transmission force main to the Pine Hollow Golf Course (scheduled completion 02/06/2008). The
clerigester, trickling filter, and secondary clarifier of the original plant are not in use and are abandoned
At the time of inspection, the aerated digester was being used to store scum from the clarifiers. The two
aerated sludge holding tanks were approximately 50% full. Sludge hauling was to begin early January 2008.
Clarifier # 1 was offline due to low influent flow. Sludge judge readings for clarifier # 2 was 3 feet and
clarifier # 3 was 1 foot with both clarifiers having sidewall depths of 14 feet. Effluent appeared clear flowinq
evenly over the weirs with no blockage. There was no scum noted in either clarifier. The rotary drum
thickener was not being operated at the time of inspection. Effluent flowing off the tertiary filters appeared
clear with no foam or odor. Each effluent turbine pump is scheduled to be rebuilt. Excavation around the
three effluent turbine pumps has already begun.
Discharge Monitoring Reports (DMR’s) for the period December 2006 to September 2007 were reviewed for
compliance with permit limits and monitoring requirements. The BIMS computer is flaqqinq monitoring
violations for chronic toxicity for 12/2006, 03/2007, 06/2007, and 09/2007. These violations appear to be
caused by using the code THP3B for reporting pass/fail results for chronic toxicity. Monitoring violation for
silver was recorded for 01/2007. A pH value of 73 was recorded 05/07/2007 most likely the reading should
residual chlorine is reported as exceeding the permit limit on 09/06/2007,
09/27/2007, and 09/28/2007. This is reported under the column TOTAL RESIDUE parameter code 00500.
Currently the Little Creek WRF has no parameter listed however, there is a total suspended residue listed
The annua pollutant scan that is attached to the September 2007 DMR list the Total Residual Chlorine
V ug/J; TIJe 9rab samPle forthe TRC analyses was taken 08/23/2007 lists the results on the
August 2007 DMR as 0.12ug/l. There were no other violations listed for the review period.
11 12
Page # 2
Comp 11 ia nee Schedules Yes No NA NE
0 ■ Is there a compliance schedule for this facility?
Is the facility compliant with the permit and conditions for the review period?o ■ o
Comment:
Yes No NA NE
■ Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge ■ O
Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
■ (If the present permit expires in 6 months or less). Has the permittee submitted a new application?
■ Is the facility as described in the permit?
# Are there any special conditions for the permit?■ 0
Is access to the plant site restricted to the general public?■ ODO
■
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?■
Is all required information readily available, complete and current?■
■ Are all records maintained for 3 years (lab. reg. required 5 years)?
■ o o Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?■
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Page #3
Permit: NC0025453
Inspection Date: 12/17/2007
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
There is no compliance schedule for this facility.
Operations & Maintenance
Is the inspector granted access to all areas for inspection?
Comment: Upgrade to the water reclamation facility include a FRP cover system and
ordor control system for the influent headworks; a new 214,500 gallon anaerobic basin
in front of oxidation basin # 2; a new 300,000 gallon anoxic tank in front of oxidation
basin # 2; a new 200,000 gallon anoxic in front of oxidation basin # 1; one new aerated
360,000 gallon sludge holding tank; a new sludge thickening building containing a rotary
drum thickener; in-plant non-potable water system using reclaimed treated wastewater
and a reclaimed water pump station and transmission force main to the Pine Hollow
Golf Course (scheduled completion 02/06/2008).
Record Keeping Yes No NA NE
Transported COCs
Are DM Rs complete: do they include all permit parameters?■
Has the facility submitted its annual compliance report to users and DWQ?■ o
■ (If the facility is - or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift?
■ 000Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?■ 000
Is the backup operator certified at one grade less or greater than the facility classification?■ 00 0
■ ODOIs a copy of the current NPDES permit available on site?
■ DOOFacility has copy of previous year's Annual Report on file for review?
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?■
Are the receiving water free of foam other than trace amounts and other debris?■ o
If effluent (diffuser pipes are required) are they operating properly?■
Flow Measurement - Influent Yes No NA NE
# Is flow meter used for reporting? ■ o
Is flow meter calibrated annually?■ 0
Is the flow meter operational?■
(If units are separated) Does the chart recorder match the flow meter?■ o
Comment:Ultrasonic Influent flow meter was calibrated 06/20/2007.
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?■ ODO
Is flow meter calibrated annually?■ o
Is the flow meter operational?■
(If units are separated) Does the chart recorder match the flow meter?■ 0
flow meter was calibrated 06/20/2007 by outside contractor. Staff calibrates
Page #4
Comment: f
flow meter once a week.
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025453
Inspection Date: 12/17/2007
Comment: The Neuse River was at a high flow and was muddy from recent heavy
rain. The effluent pipe was submerged. Clear effluent could be seen surfacing through
the muddy water.
Comment: Commercial lab results, chain of custody records, and bench sheets were
compared with data submitted on the DMR for the month of September 2007. No
discrepancies were noted.
Aerobic Digester Yes No NA NE
Is the capacity adequate?■
Is the mixing adequate?■
Is the site free of excessive foaming in the tank?■
# Is the odor acceptable?■
# Is tankage available for properly waste sludge?■
Comment:
Drying Beds Yes No NA NE
Is there adequate drying bed space?■
■ Is the sludge distribution on drying beds appropriate?
Are the drying beds free of vegetation?■
# Is the site free of dry sludge remaining in beds?■
■ O Is the site free of stockpiled sludge?
■ o Is the filtrate from sludge drying beds returned to the front of the plant?
# Is the sludge disposed of through county landfill? ■ 0
# Is the sludge land applied?■ o
■ o(Vacuum filters) Is polymer mixing adequate?
Comment:
Yes No NA NE
Is the equipment operational?■ 000
■ ODDIs the chemical feed equipment operational?
■ ODDIs storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?n n ■
Is the site free of sludge buildup on belts and/or rollers of filter press? □■0
Is the site free of excessive moisture in belt filter press sludge cake?
■ 000The facility has an approved sludge management plan?
Chemical Feed Yes No NA NE
Is containment adequate?■ ODD
■ ODDIs storage adequate?
Page #5
Drying beds are present on site however, they are not used.
Solids Handling Equipment
Permit: NC0025453
Inspection Date: 12/17/2007
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
Comment: Facility has a new rotary drum thickner with computer controls. The rotary
drum thickner was not being operated at the time of inspection.
Chemical Feed Yes No NA NE
■ Are backup pumps available?
Is the site free of excessive leaking?■ o
Comment: Chemical tanks were empty at the time of inspection.
Pump Station - Effluent Yes No NA NE
■ OIs the pump wet well free of bypass lines or structures?
Are all pumps present?■
Are all pumps operable?■ o
■Are float controls operable?
■Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational? o ■
Yes No NA NE
Is the pump wet well free of bypass lines or structures?■ 000
Is the wet well free of excessive grease?■ ODD
Are all pumps present?■ ODD
Are all pumps operable?■ ODD
Are float controls operable?0 0 ■
Is SCADA telemetry available and operational?■ ODD
Is audible and visual alarm available and operational?0 o 0 ■
Pump station is equipped with ultrasonic flow meter with back-up float
Bar Screens Yes No NA NE
Type of bar screen
a.Manual 0
b.Mechanical
Are the bars adequately screening debris?■ DDD
Is the screen free of excessive debris?■ DDD
Is disposal of screening in compliance?■ DDD
Is the unit in good condition?■ DDD
Page #6
Comment:
system.
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025453
Inspection Date: 12/17/2007
Comment: Each effluent turbine pump is scheduled to be rebuilt. Excavation around
the three effluent turbine pumps has already begun.
Pump Station - Influent
Bar Screens Yes No NA NE
Comment: Screens are covered to prevent odor.
Grit Removal Yes No NA NE
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?■ ODD
Is the grit free of excessive odor?■
■ # Is disposal of grit in compliance?
Comment: Screens are covered to prevent odor.
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?■ o
■ 0Is the site free of excessive buildup of solids in center well of circular clarifier?
■ O 0 Are weirs level?
Is the site free of weir blockage?■ o
Is the site free of evidence of short-circuiting?■
■ Is scum removal adequate?
■ 0Is the site free of excessive floating sludge?
Is the drive unit operational?■ O 0
Is the return rate acceptable (low turbulence)?■
■ 0Is the overflow clear of excessive solids/pin floc?
■
Oxidation Ditches Yes No NA NE
Are the aerators operational?■
■ Are the aerators free of excessive solids build up?
■ # Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?■ ODD
■ Is the DO level acceptable?
Page #7
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025453
Inspection Date: 12/17/2007
Is the sludge blanket level acceptable? (Approximately % of the sidewall depth)
Comment: Sludge judge readings for clarifier # 2 was 3 feet and clarifier # 3 was 1
foot with both clarifiers having sidewall depths of 14 feet. Effluent appeared clear
flowing evenly over the weirs with no blockage. There was no scum noted in either
clarifier.
Oxidation Ditches Yes No NA NE
Are settleometer results acceptable (> 30 minutes)? ■
Is the DO level acceptable?(1.0 to 3.0 mg/l)■
Are settelometer results acceptable?(400 to 800 ml/l in 30 minutes) ■
Nutrient Removal Yes No NA NE
■ # Is total nitrogen removal required?
# Is total phosphorous removal required?■
Type Biological
# Is chemical feed required to sustain process? ■
Is nutrient removal process operating properly?■
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?■
Are UV bulbs clean?■
Is UV intensity adequate?■ 0
Is transmittance at or above designed level?■
Is there a backup system on site?■
Is effluent clear and free of solids?■ o
Standby Power Yes No NA NE
Is automatically activated standby power available?■ o
Is the generator tested by interrupting primary power source?■ o
Is the generator tested under load?■
Was generator tested & operational during the inspection? ■
Do the generator(s) have adequate capacity to operate the entire wastewater site?■ o
Is there an emergency agreement with a fuel vendor for extended run on back-up power?■
Is the generator fuel level monitored?■ o
Comment:
Yes No NA NE
Page #8
Generator is operated daily for peak shaving.
Filtration (High Rate Tertiary)
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025453
Inspection Date: 12/17/2007
Comment: The color of the influent in the both oxidation ditches was tan to light
brown. Foam covered approximately 10% of the basin's surface in both basins.
Comment: UV bulbs are changed every 12 to 18 months. There is chlorination /
dechlorination system for back-up disinfection.
Filtration (High Rate Tertiary)Yes No NA NE
Type of operation:Down flow
Is the filter media present?■
Is the filter surface free of clogging?■
Is the filter free of growth?■ o
Is the air scour operational?■
Is the scouring acceptable?■
Is the clear well free of excessive solids and filter media?■
Comment:Filters are covered under roof to prevent algae growth.
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory?■ o o
Are all other parameters(excluding field parameters) performed by a certified lab?■
■ □00# Is the facility using a contract lab?
■ ODDIs proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?■ ODD
Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees?■ OOD
Comment:
Yes No NA NE
# Is composite sampling flow proportional?■ DOO
Is sample collected above side streams?■ ODD
O D 0 ■Is proper volume collected?
■ ODDIs the tubing clean?
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)?■ ODD
Is sampling performed according to the permit?■ ODD
Comment:Influent sampler temperature was 1 Celcius.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?■ ODD
Is sample collected below all treatment units?■ ODD
D D D ■Is proper volume collected?
■ ODDIs the tubing clean?
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)?■ ODD
Page #9
Contract labs are Environment 1, Tritest, and Merritech.
Influent Sampling
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025453
Inspection Date: 12/17/2007
EffIuent Sampling Yes No NA NE
■ O Is the facility sampling performed as required by the permit (frequency, sampling type representative)?
Comment:Elluent sampler temperature was 3 degrees Celcius.
Pumps-RAS-WAS Yes No NA NE
■ 0 Are pumps in place?
■ Are pumps operational?
■ Are there adequate spare parts and supplies on site?
Comment:
Page #10
Permit: NC0025453
Inspection Date: 12/17/2007
Owner - Facility: Little Creek WWTP
Inspection Type: Compliance Evaluation
►
Attn. NPDES Reviewer: Jackie NoweH
c.
Existing Permit (check at http:' www.topozone.
e.
&
County: Johnstoa
Permitee: Town of Clayton Little Creek
Receiving Stream OK on Existing Permit OR, if not, is
OK on Application Q, or provide Receiving Stream or affected waters:
Application/ Permit No.: NC0025453
Staff Report Prepared By: Mitch Hayes
MAILED
, Wt 1 5
Date: 01/08/2008
To: NPDES Discharge Permitting Unit
Project Name:
SOC Priority Project? (Y/N)If Yes, SOC No.
NPDES REGIONAL WATER QUALITY
STAFF REPORT AND RECOMMENDATIONS
(This form is best filled out on computer, rather than hard copy. Then unprotect to
highlight in light blue as needed to make your comments more visible in the final printing.)
[But DON’T protect document again, or Word wipes out all you have entered.]
b. Driving Directions OK on Existing Permit OR, if not, is
OK on Application Q, or provide Driving Directions (please be accurate):
.com These are
Longitude:
3. Keeping BIMS Accurate: Is the following BIMS information (a. through e. below) correct?
[X] Yes or Q No. If No, please either indicate that it is correct on the current application or the
existing permit or provide the details. If none can be supplied, please explain:
Discharge Point: (Fill this section only if BIMS or Application Info is incorrect or missing)
(If there is more than one discharge pipe, put the others on the last page of this form.)
a. Location OK on Existing Permit OR, if not, is
OK on Application O, or if neither is right, provide Location:
d. Latitude/Longitude OK on
often inaccurate) or is OK on Application Q, or provide Latitude:
a. Stream Classification: WS-IV NSW
b. River Basin and Sub basin No.: 03-04-02
A. GENERAL IN FORMA TION
1. This application is (check ail that apply): New Renewal
O Modification
2. Was a site visit conducted in order to prepare this report? KI Yes or O No.
a. Date of site visit: 12/17/2007
b. Person contacted and telephone number: James O. Warren 919.553.1536
c. Site visit conducted by: Mitch Hayes
d. Inspection Report Attached: K Yes or No.
USGS Quadrangle Map name and number OK on Existing Permit K, OR, if not, is
OK on Application Q, or provide USGS Quadrangle Map name and number:
4
B. DESCRIPTION OF FACILITIES AND WASTE(S) (renewals and modifications only)
(Available in BIMS or
3.
FORM: NPDES-RRO 06/03, 9/03, 1/07 2
NPDES REGIONAL WATER QUALITY
STAFF REPORT AND RECOMMENDATIONS
For NEW FACILITIES Proceed to Section C, Evaluation and Recommendations
(For renewals or modifications continue to section B)
1. Describe the existing treatment facility: The 2.5 MOD water reclamation facility consists of the
following units: influent head works with a FRP cover system and odor control system including
mechanical screening and a vortex type grit removal system; influent pump station with ultrasonic flow
meter with back-up float alarm; a new 214,500 gallon anaerobic basin in front of oxidation basin # 2; a
new 300,000 gallon anoxic tank in front of oxidation basin # 2; a new 200,000 gallon anoxic in front of
oxidation basin # 1; three (3) secondary clarifiers; two shallow bed DAVCO traveling bridge type
tertiary filters; UV disinfection with back-up chlorination / dechlorination; effluent pump station; one
existing 90,000 gallon aerated digester/sludge stabilization tank; one new aerated 360,000 gallon sludge
holding tank; one existing aerated 360,000 gallon sludge holding tank; sludge loading station; a new
sludge thickening building containing a rotary drum thickener; sludge drying beds; in-plant non-potable
water system using reclaimed treated wastewater; a reclaimed water pump station and transmission
force main to the Pine Hollow Golf Course (scheduled completion 02/06/2008). Sludge drying beds are
not used. The clerigester, trickling filter, and secondary clarifier of the original plant are not in use and
are abandoned.
2. Are there appropriately certified ORCs for the facilities? Yes or No.
Operator in Charge: James O. Warren Certificate # WW-4 / 7149
Certification Website)
Back- Operator in Charge: Leigh S. Honeycutt Certificate # WW-3 / 6738
Does the facility have operational or compliance problems? Please comment: There are currently no
operational or complaince problems.
Summarize your BIMS review of monitoring data (Notice(s) of violation within the last permit cycle;
Current enforcement action(s)): There has been one NOV issued for exceeding monthly Total
Nitrogen by 0.01 mg/l.for April 2005.
Are they currently under SOC, Currently under JOC, Currently under moratorium □? Have
all compliance dates/conditions in the existing permit, SOC, JOC, etc. been complied with? Yes
or 0 No.Mf no, please explain:
4. Residuals Treatment: PSRP (Process to Significantly Reduce Pathogens, Class B) or
c. Describe receiving stream features and downstream uses: Receiving stream is the Neuse
River. Immediately downstream use is the water supply for the Johnston County Water Plant
and the City of Smithfield.
r
Contractor Used: GFI Residuals Land Application
C. EVALUATION AND RECOMMENDATIONS
FORM: NPDES-RRO 06/03, 9/03, 1/07 3
1. Alternative Analysis Evaluation: has the facility evaluated the non-discharge options available? Give
regional perspective for each option evaluated:
Spray Irrigation:
Connect to Regional Sewer System:
Subsurface:
Other Disposal Options: In-plant non-potable water using treated wastewater effluent is utilized
throughout the plant under permit WQ0024223. The reuse generation distribution line and pump station
with force main to the Pine Hollow Golf Course is covered under permit WQ22224.
NPDES REGIONAL WATER QUALITY
STAFF REPORT AND RECOMMENDATIONS
PFRP (Process to Further Reduce Pathogens. Class A)?
Are they liquid or dewatered to a cake? liquid
Land Applied? Yes KI No If so, list Non-Discharge Permit No. WQ0023178 - Town of Clayton
Land Application Permit
2. Provide any additional narrative regarding your review of the application: Application list wrong
permit number and contract sludge hauler. WQ0000506 was rescinded 05/28/2004. Sludge is land
applied according to the Town of Clayton Land Application Permit WQ0023178. Back-up contractor
for sludge application is covered under GFI Residuals Land Application Program permit number
WQOOOO838 not WQ0004801 as listed in the permit.
3. List any items that you would like NPDES Unit to obtain through an additional information
request. Make sure that you provide a reason for each item:
Program WQ0000838 as a back-up.
Landfilled? Yes NoK If yes, where?
Other?
Adequate Digester Capacity? Yes K No Sludge Storage Capacity? Yes 0 No
Please comment on current operational practices: Sludge is dewatered using rotary drum thickner.
Filtrate is recycled back to headworks. Thickned sludge is stored in aerated sludge holding tanks.
Thickned sludge is pumped into trucks at the sludge loading station. Sludge is land applied according
to Town of Clayton Land Application Permit WQ0023178.
5. Are there any issues related to compliance/enforcement that should be resolved before issuing this
permit? Q Yes or K No. If yes, please explain:
*
ReasonRecommended Additional Information
4.
5.
Reason
6.
Reminder: attach inspection report if Yes was checked for 2 d.
I ii7. Signature of report preparer:
FORM: NPDES-RRO 06/03, 9/03, 1/07 4
NPDES REGIONAL WATER QUALITY
STAFF REPORT AND RECOMMENDATIONS
These units are no longer used for sludge
drying.
List specific special requirements or compliance schedules that you recommend to be included in
the permit when issued. Make sure that you provide a reason for each special condition:
Recommended Addition
D. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
Please use new description of water reclamation process units. See B (1)
List specific Permit requirements that you recommend to be removed from the permit when
issued. Make sure that you provide a reason for each condition:
___________Recommended Removal_______
Remove from permit descripton The clerigester,
trickling filter, and secondary clarifier of the
original wastewater treatment plant._________
Remove from permit description reference to
sludge drying beds._______________________
_______________Reason___________
These units are not in use and have been
abandoned.
Signature of WQS regional supervisor:
Date: /
Recommendation: Q Hold, pending receipt and review of additional information by regional office;
Q Hold, pending review and approval of required additional information by NPDES permitting
office; 13 Issue; Q Deny. If deny, please state reasons:
1
«h
February 5, 2008
Dear Mayor McLeod:
Sincerely.
cc:
Construction Grants and Loans Section
1633 Mail Service Center Raleigh NC 27699-1633
Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
You should review this report and take any actions as noted or recommended in the
attached report and then file for your records. If you have any questions, please contact me
at (919) 715-6219 or via e-mail at gerald.hoilon@ncmail.net.
The Honorable, Jody L. McLeod, Mayor
Town of Clayton
Post Office Box 879
Clayton, North Carolina, 27520-0879
Gerald W. Horton, PE
Environmental Engineer
Construction Inspection Unit
Coleen H. Sullins. Director
Division of Water Quality
Tim Simpson, Clayton Director of Public Utilities
Don Gantt, PE, The Wooten Company, Raleigh
Barry Herzburg, Raleigh Regional DWQ Office
Jennifer Kinghorn - CG&L (reimbursements)
SRG
An inspection and progress meeting scheduled for Thursday January 10, 2008 was
rescheduled for Thursday January 17 at 10:00 a.m. at the Clayton Publics Works facility on NC
42 in the Town’s maintenance building. The next meeting is scheduled for Thursday
February 21,2008.
SUBJECT: Town of Clayton
Water Reclamation
Project Number E-SRG-T-02-0136
Interim Inspection
William G. Ross Jr.. Secretary
North Carolina Department of Environment and Natural Resources
111
NorthCarolinaNaturally
Michael F. Easley. Governor
tern
t
CONSTRUCTION GRANTS & LOANS SECTION
(RDB)
o
$
$
$
$
Pg 2 of 3
January 17,2008
Clayton - ReclairZ^r^^
Interim Inspection Report
E-SRG-T-02-0136
o
o
Contract
S 1,334.896.73
Eligible
$ 1,297.396.73
56,764
162,600
337,563
13,587
GRANT ADMINISTRATION
GRANT DISBURSEMENTSTS
Most recent disbursement was for $ 91.113 on Nov. 27. Total amount disbursed is $1,210,527.
GRANT BUDGET
R.D. Braswell Constr. Co.
Contingency
Technical Services $ 162.600.00
Johnston County Capacity Purchase $ 337.563.00
Easement surveys/map prep & Geotechnical_____$ 13,587.00
Note 1: GRANT Amount for this project is limited to $ 1.833,333.00
Note 2: HUCG of $1,833,333 less $432,000 (JC Capacity purchase = $1,401,333.00
CONSTRUCTION ADMINISTRATION
Contractor - R.D. Braswell Constr. Co., 3241 US70 E., Smithfield, NC 27577
Substantial Completion date is Feb. 6, 2008
WORK and status consists of:
o 11.610 ft. 6-inch dia force main - done except some testing, see handout from meeeting
o 8,686 ft. 8-inch dia. force main - done except some testing
effluent transfer pump station - wet well formed and concrete poured, pumps just arrived
chlorine feed, instrumentation, telemetry, electrical and associated components - some details must be
worked out between Engineer. Owner and RDB
testing and tie-in at Pine Hollows Golf Course is pending, as well as radio signal mounting and
location details
CHANGE ORDER UPDATE
Change Order # 1 eligible amount is for adding 6'" and 8” isolation valves & boxes on the force main
from the WWTP to Pine Hollow GC. All these valves are now installed. The directional drilling was not
deemed eligible.
SUBMITTALS UPDATE
All submittals have been approved.
REQUESTS FOR PROPOSALS (RF PsjUPDATE
None pending.
REQUESTS FOR INFORMATION (RFIs) UPDATE
None pending.
Work performed since November 11 progress meeting:
1. All line work has been completed since October, work at WWTP has been delayed pending arrival
of pumps. Pumps were delivered around January 24.
2. Installed 6” and 8” isolation valves.
3. Performed remaining tie-ins at US 70, and directional bore.
4. Formed walls of PS, installed gate & stem, considerable shoring and ground water control were
required for the excavation. Seven day concrete breaks were @ 3400 psi. -75% strength,
indicating strength will be achieved.
5. Seeding is done and growing along the pipeline route.
Upcoming Work schedule:
1. Install reclaimed water transfer pumps and perform checkout. RDB hopes to have pumps running
by March 1.
2. Pour remainder of concrete - walls (Jan. 23) and top slab.
3. Install ARVs and identifying posts.
tem
yes
2.
919 715-6219
Next meeting February 21, 2008
k
□
□
□
□
Clayton, Director of Public Works
Clayton, ORC
Pine Hollows Golf Course
Pine Hollows Golf Course
The Wooten Company. Project Manager
The Wooten Company, Project Admin.
The Wooten Company, constr. observer
RD Braswell Construction Co.
RD Braswell Construction Co.
PB Construction Co.
McClung’s Electic Co.
NC Construction Grants & Loans
919 828-0531
919 828-0531
919 828-0531
919 291-4853 (C)
919 795-0989
919 612-6855
919 625-2285
919 553-1530
919 553-1536
919 553-4554
Clayton Ixcclaii^P^B-
Interim Inspection Report
E-SRG-T-02-0136
Pg 3 of 3
January 17.2008
Tim Simpson
James Warren
Mike Marvel
Grant Warren
Charlie Davis, PE
Don Gantt, PE
Robin Core
Richard D. Braswell RD Braswell Construction Co.
□ Angela Holloman
Ravi Kohli
Phillip Blackmon
Shane McClung
Gerald Horton. PE
CONSTRUCTION SITE:
Precedent weather conditions have generally been favorable.
Storage/Protection of Stored Materials and Equipment Adequate?
Safe Conditions/Methods Observed? yes
Were Unsafe Practices Brought to the Inspectors, Contractors or Recipient's Attention? NA
Site Comments: - none
ENGINEERING/INSPECTION:
Resident Inspector on site: - Yes
Inspector's records, reports, shop drawings, files, etc. reviewed: - inspectors daily logs were reviewed
Testing reports (concrete, soil, reports) reviewed: Seven day concrete breaks for PS walls were @
3400 psi, -75% strength. OK.
As-Builts being kept up to date: at meeting Inspector slated he was keeping as-built records
Comments / Recommendations: Job progressing well.
CONTRACTORS:
NC OSHA / Labor Laws Posted: RBD stated these were posted at their office.
Up to date Construction Schedule (Bar Graph, CPM) posted: provided at meeting.
Construction coordination of work observed: yes
Comment on any known delays/impacts in completing contracts according to contractor(s): None
If construction appears that it will not be completed on time, is additional time needed for
completion? Job appears to be on schedule.
PROJECT PROGRESS/PAYMENTS
1. Payment Milestones Discussed: no
2. Work Completed Acceptable for Reimbursement: yes
COMMENTS / RECOMMENDED ACTIONS
1. Owner asked RDB to have all manufacturers provide O&M manuals.
RDB noted they have had 2 defective DI pipe sections that seem to have split longitudinally
and it appeared the walls were thin. Owner asked RDB to seek 2 year warranty on all DIP for
the project due to this defect. The pipe was manufactured by Atlantic States.
3. Jan UPDATE: Item not discussed. Oct. UPDATE: This item was again brought up. Don
Gantt reiterated importance of RDB providing up to date and accurate “as built” information,
particularly both V & H for location of directional bore.
PROGRESS MEETING PARTICIPANTS
□
□
□
□
□
□
□
□
"SERVICE”"ENVIRONMENT"
February 20. 2008
?5
Dear Mr. Hayes:
Please find the following clarifications to the 2007 Compliance Evaluation Inspection.
Please feel free to call me at 553-1536 if you have any questions.
Si •ely.
653 Highway 42 West • P.O. Box 879 • Clayton, North Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541
VEHICLE MAINTENANCE
(919)553-1530
ELECTRIC SERVICE
(919)553-1530
James Warren
Town of Clayton. ORC
Copy:
Steve Biggs
The Total Residual Chlorine for 8/23/07
be resubmitted with the correction.
The pH value for 5/7/07 was 7.3 instead of 73. The DMR will be resubmitted with the
correction.
WATER RECLAMATION
(919) 553-1535
PUBLIC WORKS
(919) 553-1530
The Total Residue was recorded on the DMR. these tests were ran as part of the annual
pollutant scan. The values will be removed from that column and reported on the annual
pollutant scan sheet. The DMR will be resubmitted with the corrections.
Mitch Hayes
Environmental Specialist
DWQ. Raleigh Regional Office
1628 Mail Service Center
Raleigh. NC 27699-1628
TOWN OF CLA'nSff
OPERATIONS CENTER
was 12 ug/1: instead of .12 ug/1. The DMR will
The Silver value for January 2007 was left off the lab report inadvertently: the contract
lab was able to submit an amended report. The DMR will be resubmitted with the
corrections.
Michael 1'. I’asley. Governor
February 22. 2008
SUBJECT:
Dear Mr. Biggs:
1.
2.
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Construction Grants and Loans Section
1633 Mail Service Center Raleigh NC 27699-1633
Phone: 919-733-6900/FAX: 919-715-6229/Internet: www.nccgl.net
As you were notified by letter from Governor Easley, the Town of Clayton has been
approved for loan assistance from the Clean Water State Revolving Fund in the amount of
$3,600,000. This loan will assist with the capacity fee to the City of Raleigh for Wastewater
received from the Town of Clayton.
Mr. R. Steven Biggs, Town Manager
Town of Clayton
Post Office Box 879
Clayton. North Carolina 27528
A resolution adopted by the governing body accepting the loan offer and making the
applicable assurances contained therein. (Sample copy attached)
One (1) copy of the original Offer and Acceptance Document executed by the authorized
representative for the project. Retain the other copy for your files.
Offer and Acceptance For a
State Loan for Capacity Fee
Project No. CS370431-05
Clayton, North Carolina
Coleen H. Sullins. Director
Division oi Water Quality
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
I
Enclosed are two (2) copies of an Offer and Acceptance Document extending a State
Revolving loan in the amount of $3,600,000. This offer is made subject to the assurances and
conditions set forth in the Offer and Acceptance Document. Upon executing the Offer and
Acceptance Document, please submit the following items to the Construction Grants and Loans
Section. 1633 Mail Service Center. Raleigh. North Carolina 27699-1633 within forty-five (45)
days of receipt.
William G. Ross Jr.. Secretary
North Carolina Department of Environment and Natural Resources
OneNorthCarolina
Naturally
00/Til I kj
> |
f
ST
Enclosures
cc:
In addition, the enclosed pay request form must be used for all reimbursement requests.
You may make additional copies as needed. Also, enclosed is a copy of a memorandum
requesting your Federal Identification Number. Please contact Mr. Jim Burke at the Local
Government Commission, Department of State Treasurer at (919) 807-2389 for the compliance
pertaining to the North Carolina Clean Water Revolving Loan and Grant Program.
In accordance with G.S. 159-26(b)(6). a capital project fund is required to account for all
debt instrument proceeds used to finance capital projects. It is required that a capital project
ordinance, in accordance with G.S. 159-13.2. be adopted by the governing board authorizing all
appropriations necessary for the completion of the project. A copy of the approved ordinance
must be submitted to this office before requesting the first reimbursement request.
Sincerely,
Daniel M. Blaisdell. P.E., Acting Chief
Construction Grants & Loans Section
Mr. R. Steven Bigg^Jown Manager
February 22, 2008
Page 2
The Wooten Company, Shankar Mistry, Ph.D., P.E.
DWQ Raleigh Regional Office
Valerie Lancaster
SRF
On behalf of the Department of Environment and Natural Resources, I am pleased to
make this offer of State Revolving Loan funds made available by the North Carolina Clean
Water Revolving Loan and Grant Act of 1997 and the Federal Clean Water Act Amendments of
1987.
1 Michael I. Easley. Governor
February' 25. 2008
’7
Dear Mayor McLeod:
GWII vli
cc:
Construction Grants and Loans Section
1633 Mail Service Center Raleigh NC 27699-1633
Phone: 919-733-6900/ FAX: 919-715-6229/Internet: www.nccgl.net
An Equal Opportumty/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
An inspection and progress meeting was held on Thursday February 21 at 10:00 a.m. at
the Clayton Publics Works facility on NC 42 in the Town’s maintenance building. The next
meeting is scheduled for Thursday March 20.
You should review this report and take any actions as noted or recommended in the
attached report and then file for your records. If you have any questions, please contact me
at (919) 715-6219 or via e-mail at gerald.hoi-ton@ncmail.net.
The Honorable, Jody L. McLeod, Mayor
Town of Clayton
Post Office Box 879
Clayton, North Carolina. 27520-0879
Gerald W. Horton, PE
Environmental Engineer
Construction Inspection Unit
Coleen H. Sullins. Director
Division of Water Quality
Tim Simpson, Clayton Director of Public Utilities
Don Gantt. PE, The Wooten Company, Raleigh
Barry Herzburg, Raleigh Regional DWQ Office
Jennifer Kinghorn - CG&L (reimbursements)
SRG
William G. Ross Jr.. Secretary
North Carolina DepannKmt of Environment and Natural Resources
SUBJECT: Town of Clayton
Water Reclamation
Project Number E-SRG-T-02-0136
Interim Inspection
Sincerely,
• I- _ _ _ _ — \ o /III I
NorthCarolinaNaturally
item
CONSTRUCTION GRANTS & LOANS SECTION
o
o
$
$
$
$
Pg 2 of 3
February 21.2008
REQUESTS FOR INFORMATION (RFIs) UPDATE
None pending.
CONSTRUCTION SITE:
Precedent weather conditions have generally been favorable, though it was raining on day of
inspection.
Storage/Protection of Stored Materials and Equipment Adequate? yes
Clayton - Reclai
Interim Inspection Report
E-SRG-T-02-0136
Contract
$ 1,334.896.73
Eligible
$ 1.297,396.73
56,764
162,600
337,563
13.587
GRANT ADMINISTRATION
GRANT DISBURSEMENTSTS
Most recent disbursement was for $ 91,113 on Nov. 27, 2007.
Total amount disbursed is $1.210.527.
GRANT BUDGET
R.D. Braswell Constr. Co.
Contingency
Technical Services $ 162.600.00
Johnston County Capacity Purchase $ 337.563.00
Easement surveys/map prep & Geotechnical______S 13.587.00
Note I: GRANT Amount for this project is limited to $ I.833.333.OO
Note 2: HUCG of SI .833.333 less $432,000 (.IC Capacity purchase = $1.401.333.00
CONSTRUCTION ADMINISTRATION
Contractor - R.D. Braswell Constr. Co., 3241 US70 E., Smithfield, NC 27577 (RDB)
Substantial Completion date was Feb. 6, 2008, there has been no change to contract completion
date.
WORK and status consists of:
o 11,610 ft. 6-inch dia force main - done
o 8.686 ft. 8-inch dia. force main - done
o effluent transfer pump station - placed concrete top slab, wet well tested and Engineer reported no
leakage
Pumps finally arrived and fitting ready at supply house, RBC has flow meter
working on chlorine feed, instrumentation, telemetry, electrical and associated components, will
inject chlorine at mag meter manhole
o testing and tie-in at Pine Hollows Golf Course is pending, as well as radio signal mounting and
location details
o RBC is rerouting electrical duct bank, ref sheet 15
o 6" and 8" isolation valves of change order have been installed, but need to check for completion
of identifying posts at valves and ARVs
o Chlorinator is set up but not hooked up. RBC installing new supply WL to hot box
o Upcoming work includes finishing electrical, mounting ultrasonic meter, and yet to check out and
coordinate connections and controls at Pine Hollow Golf Course.
o Prepare punch list and check on completion requirements for railroad.
CHANGE ORDER UPDATE
No new change order has been received, though hot box, credits and shoring for PS are being
negotiated. Change Order # 1 was approved Dec. 20, 2007. CO#1 was for adding 6” and 8” isolation
valves & boxes on the force main from the WWTP to Pine Hollow GC.
item4
2.
3.
4.
If needed, next meeting March 20, 2008
Clayton, ORC
The Wooten Company, Project Manager
The Wooten Company, Project Admin.
The Wooten Company, constr. observer
919 553-1536
919 828-0531
919 828-0531
919 828-0531
919 291-4853 (C)
919 715-6219
Pg 3 of 3
February 21.2008
Safe Conditions/Methods Observed? yes
Were Unsafe Practices Brought to the Inspectors, Contractors or Recipient’s Attention? NA
Site Comments: - none
ENGINEERING/INSPECTION:
Resident Inspector on site: - Yes
Inspector’s records, reports, shop drawings, files, etc. reviewed: - inspectors daily logs not reviewed
Testing reports (concrete, soil, reports) reviewed: all concrete test reports are within specifications
according to Engineer.
As-Builts being kept up to date: Yes
Comments / Recommendations: Job is behind schedule, completion date was Feb 6. 2008.
CONTRACTORS:
NC OSH A / Labor Laws Posted: RBD stated these were posted at their office.
Up to date Construction Schedule (Bar Graph, CPM) posted: provided at meeting.
Construction coordination of work observed: yes
Comment on any known delays/impacts in completing contracts according to contractor(s): Pumps
were to have been delivered in December, just arrived.
If construction appears that it will not be completed on time, is additional time needed for
completion? Job is beyond contract completion date. No change order or justification for exceeding
contract time has been submitted.
PROJECT PROGRESS/PAYMENTS
1. Payment Milestones Discussed: no
2. Work Completed Acceptable for Reimbursement: yes
Clayton - Reclaii^^Wat^^
Interim Inspection Report
E-SRG-T-02-0136
PROGRESS MEETING PARTICIPANTS
□
□
□
□
□
□
James Warren
Charlie Davis, PE
Don Gantt, PE
Robin Core
Richard D. Braswell RD Braswell Construction Co.
Gerald Horton. PE NC Construction Grants & Loans
COMMENTS / RECOMMENDED ACTIONS
I. With remaining repair to hole in pump station, electrical installation and coordination at Pine
Hollow GC. completion now looks to be end of March.
Feb. UPDATE: Engineer intends to document in writing his concerns about pipe defects and
will seek 2 year warranty for the pipe to include labor and materials. Pipe was tested to 250
psi which exposed the 2 defective pipe joints. Engineer reports the working pressure will be
170psi. RDB noted they have had 2 defective DI pipe sections that seem to have split
longitudinally and it appeared the walls were thin. Owner asked RDB to seek 2 year warranty
on all DIP for the project due to this defect. The pipe was manufactured by Atlantic States.
Feb UPDATE: RBC will provide manufacturer’s O&Ms by week ending Feb. 29. Owner
asked RDB to have all manufacturers provide O&M manuals.
Jan UPDA.TE: Item not discussed. Oct. UPDATE: This item was again brought up. Don
Gantt reiterated importance of RDB providing up to date and accurate “as built” information,
particularly both V & H for location of directional bore.
I. General Information
n p
Responsible Entity: Town of Clayton
Wastewater Treatment Facility Name: Little Creek Water Reclamation Facility (LCWRF)
Operators in Responsible Charge: James Warren-LCWRF Byron Poelman-Collection System
Collection System: WQCS00110
II. Performance
The collection system had 7 overflows during the period that did not meet the reporting criteria. The
collection system had _9_overflows during the period that did require reporting. These are listed below:
The treatment facility treated 501,573,000 gallons during the period.
The treatment facility experienced no spills during the period and met NPDES permit limits.
Sanitary sewer overflows that release 1,000 gallons or more and/or enter surface waters must be
reported to the State of North Carolina.
The collection system recorded a good performance record for the twelve-month period from July 1,
2007 to June 30, 2008. The facility met all the permit conditions during the period.
NPDES Permit: NC0025453 (LCWRF)
Laboratory Certification: 348
!l yr
I
Wastewater System Performance Annual Report
Fiscal Year 2007-2008
Town of Clayton
Description of Treatment Process and Collection System: The LCWRF is comprised of an automated
barscreen, grit chamber, sampling station, flow monitoring, clarigester, trickling filter, dual oxidation
ditches with biological nutrient removal, tertiary filter, ultraviolet disinfection, standby chlorination &
dechlorination, sludge thickening , aerated sludge storage and reclaim water. The wastewater
collection system is comprised of 28 lift stations, approximately 66 miles of gravity sewer and
approximately 17 miles of force main.
Reportable Collection System Sanitary Sewer Overflows
The following improvements were made to the collection system during the twelve-month period:
The cost of these improvements was approximately $ 1,171,515 .
The following improvements were made to the treatment facility during the twelve-month period:
The costs of these improvements was approximately $ 1,736,000 .
Corrective measures for the overflows included cleaning the line(s) involved and the immediate area(s)
in accordance with State guidelines. The system also distributed Grease Public Education materials to
all residents in the basins for each SSO relating to grease. No environmental impacts or adverse health
effects were detected.
9
9
9
9
•
_________Cause_________
Blown fuses at Lift Station
Rocks and sticks in MH invert
Cable contractor bored line
______Debris in line______
_________Grease_________
_________Roots_________
_________Grease_________
_________Roots_________
Debris, Vandalism
_____Location_____
832 Parkridge Dr.
2732 Brigadoon Dr.
Hardaway Point
637 Westbrook Ln.
127 Harvard St.
612 Mitchell St.
522 N. Church St-
429 E. Stallings St.
1001 Woodlawn Way
Date
08/14/07
10/16/07
10/22/07
02/04/08
02/06/08
02/17/08
05/06/08
05/20/08
05/30/08
Gallons
500
600
18,500
48,000
57,600
875
500
500
600
• A nutrient removal enhancement project was completed. $ 421,000 (10%)
• A reclaim water system was installed to Pine Hollow Golf Course. $1,315,000
Design Lift Station by-pass pump installation, $82,235
Utility System Mapping, $109,580
ECIA Force Main Phase 2, Upgrade, $691,147
Alta/Brigadoon Line replacement and easement grading, $35,645
• Copper St. to Mial Line relocation and easement grading, $17,392
• Manhole Rehabilitation Project, $41,445
Appian Details and Specification update, $38,075
• Glen Laurel/Summerlyn FM connection, $ 19,752
• Equipment Purchase for L.S. rebuild,
1) NRLS #2, $59,900
2) Glen Laurel #2, $38,959
Sewer Camera, Aggressive Wheels, $1,691
Matthew Cr. Line stabilization, $4,248
NC 42 to Glen Laurel easement access, $29,982
• Chemical Root Removal, $4,264
I
III. Notification
IV. Certification
This report is drafted to meet the reporting requirements established in House Bill 1160 and the Clean
Water Act of 1999.
A notice of availability is published in the Clayton News-Star and at www.townofclaytonnc.org. A
report may be picked up from the customer service counter at Town Hall or the Operations Center at
653 NC 42 West. Customers may also call 919-553-1530 to request a copy by mail.
R. Steven Biggs
Town Manager
Date
I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I
further certify that this report has been made available to the users or customers of the named system
and thatjh^se users have been notified of its availability.
I. General Information 4 ’
iResponsible Entity: Town of Clayton
Wastewater Treatment Facility Name: Little Creek Water Reclamation Facility (LCWRF)
Operators in Responsible Charge: James Warren-LCWRF Byron Poelman-Collection System
Collection System: WQCSOO110
II. Performance
T
• \
i
i * t
The treatment facility treated 501,573,000 gallons during the period.
The treatment facility experienced no spills during the period and met NPDES permit limits.
The collection system had 7 overflows during the period that did not meet the reporting criteria. The
collection system had 9 overflows during the period that did require reporting. These are listed below:
Sanitary sewer overflows that release 1,000 gallons or more and/or enter surface waters must be
reported to the State of North Carolina.
The collection system recorded a good performance record for the twelve-month period from July 1,
2007 to June 30, 2008. The facility met all the permit conditions during the period.
NPDES Permit: NC0025453 (LCWRF)
Laboratory Certification: 348
Description of Treatment Process and Collection System: The LCWRF is comprised of an automated
barscreen, grit chamber, sampling station, flow monitoring, clarigester, trickling filter, dual oxidation
ditches with biological nutrient removal, tertiary filter, ultraviolet disinfection, standby chlorination &
dechlorination, sludge thickening , aerated sludge storage and reclaim water. The wastewater
collection system is comprised of 28 lift stations, approximately 66 miles of gravity sewer and
approximately 17 miles of force main.
Wastewater System Performance Annual Report
Fiscal Year 2007-2008
Town of Clayton
f .
Reportable Collection System Sanitary Sewer Overflows
The following improvements were made to the collection system during the twelve-month period:
The cost of these improvements was approximately $ 1,171,515 .
The following improvements were made to the treatment facility during the twelve-month period:
The costs of these improvements was approximately $ 1,736,000 .
9
Corrective measures for the overflows included cleaning the line(s) involved and the immediate area(s)
in accordance with State guidelines. The system also distributed Grease Public Education materials to
all residents in the basins for each SSO relating to grease. No environmental impacts or adverse health
effects were detected.
a
_________Cause_________
Blown fuses at Lift Station
Rocks and sticks in MH invert
Cable contractor bored line
______Debris in line______
_________Grease_________
_________Roots_________
_________Grease_________
_________Roots_________
Debris, Vandalism
_____Location_____
832 Parkridge Dr.
2732 Brigadoon Dr.
Hardaway Point
637 Westbrook Ln.
127 Harvard St.
612 Mitchell St.
522 N. Church St.
429 E. Stallings St.
1001 Woodlawn Way
Date
08/14/07
10/16/07
10/22/07
02/04/08
02/06/08
02/17/08
05/06/08
05/20/08
05/30/08
Gallons
500
600
18,500
48,000
57,600
875
500
500
600
• A nutrient removal enhancement project was completed. $ 421,000 (10%)
• A reclaim water system was installed to Pine Hollow Golf Course. $1,315,000
Design Lift Station by-pass pump installation, $82,235
Utility System Mapping, $109,580
• ECIA Force Main Phase 2, Upgrade, $691,147
• Alta/Brigadoon Line replacement and easement grading, $35,645
• Copper St. to Mial Line relocation and easement grading, $17,392
• Manhole Rehabilitation Project, $41,445
• Appian Details and Specification update, $38,075
• Glen Laurel/Summerlyn FM connection, $19,752
• Equipment Purchase for L.S. rebuild,
1) NRLS #2, $59,900
2) Glen Laurel #2, $38,959
Sewer Camera, Aggressive Wheels, $1,691
Matthew Cr. Line stabilization, $4,248
• NC 42 to Glen Laurel easement access, $29,982
• Chemical Root Removal, $4,264
III. Notification
IV. Certification
R. Steven Biggs
Town Manager
This report is drafted to meet the reporting requirements established in House Bill 1160 and the Clean
Water Act of 1999.
Date
A notice of availability is published in the Clayton News-Star and at www.townofclaytonnc.org. A
report may be picked up from the customer service counter at Town Hall or the Operations Center at
653 NC 42 West. Customers may also call 919-553-1530 to request a copy by mail.
I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I
further certify that this report has been made available to the users or customers of the named system
and thattfi^se users have been notified of its availability.
“SERVICE”"ENVIRONMENT"
August 21, 2008
!!’
!
■l;ty
Sincerely,
-2
653 Highway 42 West • P.O. Box 879 • Clayton, North Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541
Timothy S. Simpson, PE
Public Works and Utilities Director
In accordance with House Bill 1160 and the Clean Water Act of 1999, three copies of the Wastewater
System Performance Annual Report for FY 2006-07 are being sent to you for NPDES Permit #
NC0025453, Laboratory Certification # 348 and Collection System Permit # WQCS 00110.
If there are any questions concerning the report or any further information is required, please contact
the Operation Center at (919)553-1530.
VEHICLE MAINTENANCE
(919)553-1530
ELECTRIC SERVICE
(919)553-1530
WATER RECLAMATION
(919) 553-1535
PUBLIC WORKS
(919)553-1530
System Performance Annual Report
North Carolina Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
TOWN OF CLAYTON
OPERATIONS CENTER
' . i
! '
■ ■ • 8
r )
Michael l;. Easley. Governor
October 29, 2008
Subject:
Dear Mr. Biggs:
Sincerely,
(iwii/gh
cc:
Construction Grants and Loans Section
1633 Mail Service Center Raleigh NC 27699-1633
Phone:919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
You should review this report and take any actions as noted. If you have any questions,
please contact me at (919) 715-6219 or via e-mail at gerald.horton@ncmail.net.
Mr. R. Steven Biggs, Town Manager
Town of Clayton
Post Office Box 879
Clayton. North Carolina 27520-0879
Gerald W. Horton, PE
Environmental Engineer
Construction Inspection Group
Coleen H. Sullins. Director
1 )ivision of Waler Quality
Donald Gantt, PE, The Wooten Company
Danny Smith, Raleigh DWQ Regional Office
Jennifer Kinghorn. Mark Hubbard, PE, Gerald Horton, PE - CG&L
SRF
FINAL Inspection
Little Creek Water Rec. Facil. Improvements
SRF Project No. CS370431 -04
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
&
h r
Q’ECJB M
H OCT 3 I 2008
fDENR RALE T'
>iLjIUQ
NorthCarolinaNaturally
A Final inspection was finally conducted on October 27. 2008 on subject project. The
inspection consisted of reviewing matters at meeting at the Clayton’s Public Works building
followed by an inspection at the site. The original completion date of November 8, 2006 was
not met by TARA Group of Lumberton. The contract completion date was revised by
Change Order no. 2 to December 10. 2006. A final Change Order no. 3 as of this date has not
been accepted or executed by TARA. The actual completion dale is difficult to fix but it was
reported that TARA finally completed all work of punch lists the summer of 2008. The Town
ot Clayton received beneficial use of the facilities June 5, 2007 when aeration basin #1 was
placed back in service, enabling contractor to work on aeration basin #2.
I
il.ipvements
1.
II.
111.
□
IV.
V.
□
□
□
□
□
□
□
□
□
□
□
□
Loan amount is $ 4,450,000 on a 20 year. 2.305 % note.
First loan payment was due to State November 2007.
Current Loan Eligible Construction Amount - $3,330, 215.84 through Change Order #2.
FINAL INSPECTION
bctober 29,2008
Pg 2 of 3
Little Creek Water Red
CS370431-04
COMMENTS, REQUIRED AND RECOMMENDED ACTIONS ITEMS
Final inspection and discussions indicated facility was operational but action items must be
addressed or resolved before final reimbursement can be made:
1. Upon satisfactory resolution or response to items herein, submit final sales tax report and
reimbursement request for Final Reimbursement.
2. Submit Final Change order (CO#3) or proceed as recommended by legal counsel. In this matter
please advise CG&L in writing on the disposition of the matter.
3. Submit Owners Certification or statement of what issues are pending before such Certification
can be provided to CG&L.
4. The Engineer conducted several Pre-final inspections. TARA was delinquent in returning to job
to complete work but ultimately finished work to extent tolerable to Town and Engineer on or
around August 2008.
CONTRACT Tara Group of Lumberton, Inc., 2700 NC Hwy 72 West. Lumberton, NC 28360
Original Contract Amount- $3,192,000.00
Revised contract amount through Change Order # 2- $3,330,215.84; eligible $3,299,389.44
Original completion date - Nov. 8, 2006, revised to Dec. 10, 2006 via Change Order #2.
Engineer and Owner have attempted to close contract proposing time and payment on CO#3
and additional work in order to settle up with TARA. At this Final Inspection, it was reported
that the 3 parties met Aug. 21, 2008 to discuss final settlement. TARA has yet to respond.
Owner is still holding retainage and has yet to pay for approved and acknowledged extra
work.
For the record this project went 600+ days beyond the contract completion date and is yet to
be closed.
Contract Description -
new 214,500-gallon anaerobic basin for phosphorous removal
300,000-gallon anoxic tank for de-nitrification
new 200,000-gallon anoxic tank
modifications to existing aeration basins
new 360.000-gallon sludge holding/digestion tank,
new sludge thickener building with rotary drum thickener,
2 blowers, 2 submersible mixers and
instrumentation, site work, piping, electrical work, and associated appurtenances
□ expansion from 1.9 MGD to 2.5 MGD in accordance with NPDES Permit NC0025453.
CHANGE ORDERS- CO#1 was approved Feb. 28, 2006 for $0 eligible and 0 days increase. The
reason the costs of CO#1 were ineligible was because it was for Owner preferred equipment.
CO#2 for numerous items totaling $107,389.44 included a 32 day time extension. A CO#3 has
been in process for several months but TARA has been reluctant to and refused to sign it. Thus a
final Change order is still pending and poses a legal dilemma for Owner.
I
jvements
5.
6.
7.
V.
Clayton
Clayton
The Wooten Co.
NC CG&L
Little Creek Water Rec
CS370431-04
FINAL INSPECTION PARTICIPANTS
Tim Simpson, Public Works Director
James Warren, ORC
Don Gantt, Constr. Admin.
Gerald Horton
FINAL INSPECTION
(October 29, 2008
Pg 3 of 3
CG&L establishes June 5, 2007 as initiation of operations date, as in CG&L’s opinion, this is
the date upon which the Town began beneficial use of facilities thus far constructed.
Engineer stated the one-year warranty period for this project initiated Oct. 17, 2007. Engineer
further stated that all warranty items brought to TARA’s attention were resolved in that time
frame.
Owner and Engineer at this meeting acknowledged that all equipment checkouts, startups, and
training had been successfully completed.
8. Operation and Maintenance manual was approved.
9. Owner must provide “Certification of Owner Review of Operation & Maintenance Manual,” if
this hasn’t already been submitted.
10. Engineer provided Engineer’s Certification. (Received by CG&L Jan. 4, 2008.)
1 I. Engineer stated that the record drawings for the project were in process. CG&L asks that
Engineer confirm in writing when record drawings have been provided to Owner. Further,
CG&L requests Owner acknowledge, in writing, receipt of record drawings and that the Town
provide statement they are satisfied the drawings adequately represent changes made from
original drawings.
12. Engineer shall confirm in writing that spare parts, spare parts list, and warranty information
have been provided to Town of Clayton.
13. Confirm in writing contractor has received provided Release of Liens and Consent of Surety.
^31
3
Engineer's Certification
limits associated with the modifications to expand to 2.5 MGD now
¥Signature Registration No.
Date Ol/o-3/oR
Send to:
11
I certify that the construction ot the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633
Town of Clavton
A To C No7025j
Issued February 17j7t)05
A new 214,500 gallon anaerobic basin; one new 300,000 gallon anoxic tank, one
new 200,000 gallon anoxic tank; modifications to the existing aeration basins; a
new 360,000 gallon sludge holding/digestion tank with two blowers each having
I 100 SCFM of aeration capacity, and two 10 HP submersible mixers,
instrumentation, site work, piping, electrical work, and associated appurtenances,
pursuant to the letter of request received on December 29, 2003, and in
conformity with the project plan, specifications, and other supporting data
subsequently filed and approved by the Department of Environment and Natural
Resources.
I qi ?■
We understand that the new
apply.
L \A/ - 1-1 , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (p^TTU^SjJXveekly/fiill time)
the construction of the modifications and improvements to the Little Creek Water Reclaimation
Facility, located in Johnston County for the Town of Clayton, hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the following construction:
■‘SERVICE”"ENVIRONMENT"
December 12. 2008
ATC requirement. Little Creek WRF Clayton. NC0025453
Dear Mr. Herzburg:
Town of Clayton,
Copy: Tim Simpson
653 Highway 42 West • P.O. Box 879 • Clayton. North Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541
VEHICLE MAINTENANCE
(919)553-1530
ELECTRIC SERVICE
(919) 553-1530
WATER RECLAMATION
(919)553-1535
PUBLIC WORKS
(919) 553-1530
Barry Herzburg
Raleigh Regional Office. DWQ. DENR
1628 Mail Service Center
Raleigh. NC 27699-1628
WN OF CLAYTO
OPERATIONS CENTER
Thanks tor you help.
Sincerely.
—
‘ Tames Warren
WRF Operations Superintendent
As per our conversation on 12/11/08. we have determined that the Town of Clay ton
would not need an Al C to install an air scrubber and cover decking on the oxidation
ditch splitter box. The additional equipment will not affect the process or add or subtract
any capacities.
roi