Loading...
HomeMy WebLinkAbout820179_Routine Inspection_2024092411 Date of Visit: Arrival Time: ,U County: Region: Departure Time: ,` �O /07 Farm Name: oL Q j , Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: L,^4-,fa Title Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: �91?61& L Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes Jam' o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes _O'No ❑ NA ❑ NE ❑ Yes -Ej`Ro ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [2-No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes f2-No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): p� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [a No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes .E]'islo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Q'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q'fVo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Q No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes P7rNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes C�:J'No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? ❑ Yes ,Q'No ❑ NA ❑ Yes EfrNo ❑ NA ❑ Yes E]"go ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ID -No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ,allo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes E]lNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes QKo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:]Yes E]'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes, -No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: qbqbq 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes .,[a -No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes La'�o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ,eNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ZNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Ej'No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ,F(No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes n No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes f 24o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes U;KNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes PKo ❑ NA ❑ NE Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 N Phone:U Date: 511212020 raoligy NO. �7,� y�,� Time In Time Out Farm Name A)S *"� "" Integratw Owner Site R42:, Operator No. _ lack -up No. _ %OC Circle: General , or NIODES Design Current Design Current 1 Wean — Feed Farrow — Feed Wean— Finish Farcow — Firiist Feed _Finish Gilts I Boars Farrow — 'Aeanl IOther_ FREEBOARD: Design Observed Crop Yield Z n %s^ Rain Gauge / aayS ala �&dW Soil Test I-lj3 Wettable Acres Weekly Freeboard Daily Rainfall SpraylFreeboard Drop Sludge Survey/ Calibration/GPM fin! 3(/ < ,y '21D Waste Transfers Rain Breaker PLAT 1-in Inspections !Heather Codes (/ 120 min inspections _ Waste Analysis: Date Nitrogen (N) Date Nitrogen (N)