HomeMy WebLinkAbout820179_Routine Inspection_2024092411
Date of Visit: Arrival Time: ,U County: Region:
Departure Time: ,` �O /07
Farm Name: oL Q j , Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: L,^4-,fa Title
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Phone:
Integrator:
Certification Number: �91?61& L
Certification Number:
Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes Jam' o ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes _O'No ❑ NA ❑ NE
❑ Yes -Ej`Ro ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [2-No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes f2-No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): p�
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
[a No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
.E]'islo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental
threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
Q'No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
Q'fVo
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
Q No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
[:]Yes
P7rNo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes C�:J'No ❑ NA
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from
designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
❑ Yes ,Q'No ❑ NA
❑ Yes EfrNo ❑ NA
❑ Yes E]"go ❑ NA
❑ NE
❑ NE
❑ NE
❑ NE
17. Does the facility lack adequate acreage for land application?
❑ Yes ID -No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes �No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes ,allo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes E]lNo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes QKo
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
[:]Yes E]'No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes, -No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - Date of Inspection: qbqbq
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes .,[a -No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes La'�o ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ,eNo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ZNo ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
Ej'No
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
,F(No
❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
n No
❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
f 24o
❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
U;KNo
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
PKo
❑ NA ❑ NE
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
N
Phone:U
Date:
511212020
raoligy NO. �7,� y�,� Time In Time Out
Farm Name A)S *"� "" Integratw
Owner Site R42:,
Operator No. _
lack -up No. _
%OC Circle: General , or NIODES
Design
Current Design Current 1
Wean — Feed
Farrow — Feed
Wean— Finish
Farcow — Firiist
Feed _Finish
Gilts I Boars
Farrow — 'Aeanl
IOther_
FREEBOARD: Design
Observed
Crop Yield
Z n %s^
Rain Gauge / aayS ala �&dW
Soil Test I-lj3 Wettable Acres
Weekly Freeboard Daily Rainfall
SpraylFreeboard Drop
Sludge Survey/
Calibration/GPM fin! 3(/ < ,y '21D
Waste Transfers
Rain Breaker
PLAT
1-in Inspections
!Heather Codes (/ 120 min inspections _
Waste Analysis:
Date Nitrogen (N) Date
Nitrogen (N)