HomeMy WebLinkAbout090044_Routine Inspection_20240920Operation
for Visit: l-Routine 0
Referral 0 Emergency 0 Other Q Denied Access
Date of Visit: Arrival TiTi�'me: ,Ulf Departure Time: 'O1) ./y 4 County:
Farm Name: /A�,tyf� /�/ � Owner Email:
Owner Name: [���� Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Title:
Latitude:
Region: r )
Phone:
Integrator:
ff
Certification Number:
Certification Number:
Longitude:
Discharges and Stream Impacts
1. is any discharge observed from any part of the operation? Yes .do ❑ NA NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? Yes [—]No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes No Ej NA ❑ NE
Yes effNo ❑ NA ❑ NE
❑ Yes EjNo NA NE
Page 1 of 3 511212020 Continued
Facility Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus stone storage plus heavy rainfall) less than adequate? ❑ Yes ❑-No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: �2
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 3
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes fNo ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ,E]rNo ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes A No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ,�'No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes eNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �o ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 6&No ❑ NA
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops
from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
❑ Yes
❑ Yes
❑ Yes
❑ NA
❑ NA
❑ NA
❑ NE
❑ NE
❑ NE
❑ NE
17. Does the facility lack adequate acreage for land application?
❑ Yes ,�No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes �No
❑ NA
❑ NE
Required Records & Documents
No
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes ❑
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes _F�No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 4nNo ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections []Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes eNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes ❑ No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes ❑ No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge
levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes ❑ No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes ❑ No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes ❑ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[:]No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
❑ No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ No
❑ NA
❑ NE
Reviewer/Inspector Name: j �t N /Tf%L/ �i/v` D A) Phone: C6�? - � n
Reviewer/Inspector Signature: Date: � j70
Page 3 of 3 511212020
r-acrrrry No. 0,9
Time In Time Out
Farm Name �/i ! Integraw
Owner Site R4.
Operator No. _
Back-up No. —
COC Circle: General or NPDES
Data
Des' n
Current I I I Design current J
Wean - Feed
I Farrow - Feed
Wean- Finish
Farrow - Finish
Feed _Finish
Farrow -.Wean
Gilts /Boars
I 1 ref=
FREEBOARD: Design
Observed
Crop Yield
Rain Gauge
Soil Test 2Wettable Acres
Weekly Freeboard Daily Rainfall
SpraylFreeboprd Drop
Weather Codes 12o min Inspections _
Waste Analysis:
Date Nitrogen (N)
a� .2 /-07
9 Y c7 O
Sludge Survey 161A6ii . 5-5— t-�6 " - ° 1 / ;�-Jlav
Calibration/GPM
Waste Transfers 5S
Rain Breaker
PLAT
1-in Inspections
Date Nitrogen (N)
//, a- 9