Loading...
HomeMy WebLinkAbout090044_Routine Inspection_20240920Operation for Visit: l-Routine 0 Referral 0 Emergency 0 Other Q Denied Access Date of Visit: Arrival TiTi�'me: ,Ulf Departure Time: 'O1) ./y 4 County: Farm Name: /A�,tyf� /�/ � Owner Email: Owner Name: [���� Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Region: r ) Phone: Integrator: ff Certification Number: Certification Number: Longitude: Discharges and Stream Impacts 1. is any discharge observed from any part of the operation? Yes .do ❑ NA NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Yes [—]No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No Ej NA ❑ NE Yes effNo ❑ NA ❑ NE ❑ Yes Ej­No NA NE Page 1 of 3 511212020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus stone storage plus heavy rainfall) less than adequate? ❑ Yes ❑-No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �2 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes fNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ,E]rNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes A No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ,�'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes eNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 6&No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? ❑ Yes ❑ Yes ❑ Yes ❑ NA ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ,�No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE Required Records & Documents No 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes _F�No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 4nNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections []Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes eNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [:]No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Reviewer/Inspector Name: j �t N /Tf%L/ �i/v` D A) Phone: C6�? - � n Reviewer/Inspector Signature: Date: � j70 Page 3 of 3 511212020 r-acrrrry No. 0,9 Time In Time Out Farm Name �/i ! Integraw Owner Site R4. Operator No. _ Back-up No. — COC Circle: General or NPDES Data Des' n Current I I I Design current J Wean - Feed I Farrow - Feed Wean- Finish Farrow - Finish Feed _Finish Farrow -.Wean Gilts /Boars I 1 ref= FREEBOARD: Design Observed Crop Yield Rain Gauge Soil Test 2Wettable Acres Weekly Freeboard Daily Rainfall SpraylFreeboprd Drop Weather Codes 12o min Inspections _ Waste Analysis: Date Nitrogen (N) a� .2 /-07 9 Y c7 O Sludge Survey 161A6ii . 5-5— t-�6 " - ° 1 / ;�-Jlav Calibration/GPM Waste Transfers 5S Rain Breaker PLAT 1-in Inspections Date Nitrogen (N) //, a- 9