HomeMy WebLinkAbout820054_Routine Inspection_20240917Date of Visit: ' ! 7 Arrival Time: Departure Time: UCJ County: I::; Regina: �GU
Farm Name: /7217f� 006"I'l� L.-O /�61611 ' Owner Email:
Owner Name:
Mailing Address:
Physical Address:
iM
Phone:
Facility Contact: �� rO �L¢GwCG� Title: Phone: �/%
Onsite Representative: t Integrator: u"�
Certified Operator: J
Back-up Operator:
Location of Farm:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Certification Number:
Certification Number:
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
❑ Yes E] No ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes ❑ No
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes _Q o ❑ NA ❑ NE
❑ Yes .rNo ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: Date of inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes J Vo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5 Structure
6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes �o
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes fj'No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes _LO-No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes 3-No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes J:jNo
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes AErNo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes _4E�f No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s): C � c�r�GZ�// GJ { / Lf�S� (�, G l
/�
r� )/r
1,
13. Soil Type(s): Oc4fi 1� , A14 60 iT
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes _EJ�No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes �No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes jD No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes ENo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes -f!:rNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes [DlNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes Q-No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes [ No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes E]-Ilo
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes [2 No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes�No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ',[31�o ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a PDA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes'�J_No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Jallo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
;:],No
❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
.-No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
..ErNo
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
,❑ No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
fNo
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
Ef No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
[�No
❑ NA
❑ NE
Reviewer/Inspector Name:
L
Reviewer/Inspector Signature:
Page 3 of 3
Phone: 4 %%% 935 '' 9776�_
Date: 15�/ ;%
511212020
I
O ® ( Time In
Time Out
raaimJ No.
miegraro
Farm Name-
/
_
Site R& ,
Owner
Operator
No.
Sack -up
No.
COC
Circle: General
or NPDES
Dale
Des' n
Curtent Desi n Gurrenr
Wean -Feed
Wean- Finish
Farrow -Feed
Farrow - Firiis`
Feed _ Finish
Gilts / Boars
Farrow -Wean
I I Ofhea_
FREEBOARD: Design
Observed
Crop Yield _
Rain Gauge
Soil Test Wettable Acres
Weekly Freeboard __(� Daily Rainfall
Spray/Freeboard DrOF
Weather Codes f24 min Inspections —
Waste Analysis:
Date Nitrogen (N)
�r �-7i�U agg
Sludge Survey
11/��la� •�°
Calibration/GPivl Y4�,1s �� y
Waste Transfers
Rain Breaker
PLAT
1-in Inspections
Date // Nitrogen (N)
4Q1dd/33%.06