HomeMy WebLinkAbout090151_Routine Inspection_20240827Date of Visit: t� Arrival Time: f Departure Time: / : d0 Couuty: 4 Region: ��6)
Farm Name: %/ CJ(� m7 Owner Email:
Owner Name: v���u�, u,yy�,� L Phone:
Mailing Address:
Physical Address:
Facility Contact: �,c� 01e2'elTitle:
Onsite Representative: t
Certified Operator: la" tj�'11464d
Back-up Operator:
Location of Farm:
Latitude:
Phone:
Integrator:��LT�—G�,
Certification Number: C�062s l
Certification Number:
Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes �No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ErNo ❑ NA ❑ NE
❑ Yes [No ❑ NA ❑ NE
Page I of 3 5112120"ntinued
Facility Number: Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZJ'No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: —�
Spillway?:
Designed Freeboard (in): 1—
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes JZ'�No ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ,PrNo ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ONo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 2'Vo ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)T��//////
9. Does any part of the waste management system other than the waste structures require ❑ Yes XNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes )No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Yes
No
❑ Yes
FZKo
❑ Yes
❑ Yes
O No
❑ Yes'
plllo
❑ Yes APO
❑ Yes P1110
❑Other:
❑ NA ❑ NE
❑NA ❑NE
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes TZ]No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes JDNo ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E] No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
lFacility Number: - rj Date of Inspection: 7
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes E No
❑ NA
❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ YesJ� N' o
❑ NA
❑ NE
the appropriate boxes) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge
levels
❑ Non -compliant sludge levels in any lagoon /
List structure(s) date first indicating 11 i02-e(
and of survey non-compliance: G
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes _,allo
❑ NA
❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes ID -No
❑ NA
❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes E -No
❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes EJ"No
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes O'Po
❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes Jj o
❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes ,-No
❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes ErNo
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ONo
❑ NA ❑ NE
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: C//0 e3S -F2K5
Date: ob7b-t/
511212020
No. Time In
Time Out _
raatay
Farm Name ✓
Integrazo'
Site Re_
Owner
Operator
No. _
Back-up
No.
COC Circle: General
or NPDES
Dace
Des' n Current
Design Current
Wean — Feed
Farrow — Feed
Wean— Finish
Farrow — F
Feed :Finish
iiriis.`•
G its / B
FREEBOARD: Design
Observed
Crop Yield
Rain Gauge
Soil Test Wettable Acres
Weekly Freeboard Daily Rainfall,
Spray/Freeboard Drop
1Neather Codes 120 min Inspections
Waste Analysis:
Date Nitrogen (N)
y1 aolay a o�
oars
Sludge Survey
Calibration/GPNt
Waste Transfers
Rain Breaker _
PLAT
1-in Inspections
Date Nitrogen (N)
D a3 23 )• of
�la�l�3 l.as