September 24, 2024
Regulatory Agencies:
RE: CITY OF HENDERSONVILLE NORTH FORK RESERVOIR SEDIMENT RELEASE
DOWNSTREAM MONITORING REPORT
The attached monitoring information is provided to satisfy permit conditions regarding documentation
of downstream impacts associated with sediment release through the bottom valve opening of the
North Fork Reservoir dam. The valve was installed and opened for bottom release in August 2023
following completion of dredging operations. The intent of the bottom release is to discharge cool water
with natural sediment concentrations while maintaining sufficient water volume in the reservoir for the
City's water supply.
The Jennings team visually monitored the six permanent downstream cross -sections quarterly since the
October 2023 monitoring report. No fine sediment accumulation was observed at any of the cross -
sections during the monitoring period. An annual cross-section survey was completed on September 20,
2024. The monitoring data and visual observations of the 6 cross -sections indicated no substantial
accumulation of fine sediment on the stream channel bed downstream of the reservoir.
Future monitoring through 2026 will consist of quarterly visual observations and annual cross-section
surveys per the approved monitoring plan.
Please contact me with any questions.
Respectfully Submitted,
A,rj b, �—�
Gregory D. Jennings, Ph.D., P.E., President
Jennings Environmental PLLC
Attachment: Channel Bed Survey Information and Photographs
Jennings Environmental PLLC is licensed with the North Carolina Board of Examiners for Engineers and Surveyors and is
authorized to practice engineering under the provisions of Chapter 89C and 55B of the General Statutes of North Carolina.
License Number P-1932.
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Cross Section 1 — Riffle
98
97
IL
96
w
0
95
y
a�
—Ar- May 2023
W
94
--*--sep-23
—F 5ep-24
93
0 5 10 15 20 25 30 35 40 45
Distance (feet)
*Channel bed measured perpendicular to flow with laser level and tape from a fixed benchmark
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
May 2023
September 2023
A 74°E (T) O 35.419540°,-82.674764, ±62ft ♦ 2449ft
September 2024
View of Cross -Section 1 Facing Downstream
May 2023 — Before dredging and bottom release opening
September 2023 — After dredging and bottom release opening
September 2024 — Year 1 Cross -Section Survey
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Cross Section 2 — Pool
97
96
95
w
0
94
y
a�
W
—&-- 1iav 2023
93
t Sep-23
—K--Sep-24
92
0 5 10 15 20 25 30 35 40 45
Distance (feet)
*Channel bed measured perpendicular to flow with laser level and tape from a fixed benchmark
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
May 2023
September 2023
® 76°E (T) * 35.4196341,-82.674808° ±32ft ♦ 2454ft
September 2024
View of Cross -Section 2 Facing Downstream
May 2023 — Before dredging and bottom release opening
September 2023 — After dredging and bottom release opening
September 2024 — Year 1 Cross -Section Survey
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Cross Section 3 — Pool
99
98
97
96
w
95
.p
94
93
W
92
—�lfay 2023
91
t Sep-23
—K--Sep-24
90
0 5 10 15 20 25 30 35 40
Distance (feet)
*Channel bed measured perpendicular to flow with laser level and tape from a fixed benchmark
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
May 2023
September 2024
September 2023
View of Cross -Section 3 Facing Downstream
May 2023 — Before dredging and bottom release opening
September 2023 — After dredging and bottom release opening
September 2024 — Year 1 Cross -Section Survey
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Cross Section 4 — Riffle
98
97
96
w
95
0
94
W
—ir—lfav 2023
93
+Se-p-23
—K--Sep-24
92
0 5 10 15 20 25 30 35 40
Distance (feet)
*Channel bed measured perpendicular to flow with laser level and tape from a fixed benchmark
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
May 2023
September 2024
View of Cross -Section 4 Facing Downstream
September 2023
May 2023 — Before dredging and bottom release opening
September 2023 — After dredging and bottom release opening
September 2024 — Year 1 Cross -Section Survey
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Cross Section 5 — Riffle
98
97
96
,-,
w
95
0
94
W
flfay 2023
93 t5ep-23
92 —K--Sep-24
0 5 10 15 20 25 30 35
Distance (feet)
*Channel bed measured perpendicular to flow with laser level and tape from a fixed benchmark
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
May 2023
0 39-NE (T) O 35.419855°,-82.674022" ±26ft ♦ 2449ft
September 2024
View of Cross -Section 5 Facing Downstream
September 2023
May 2023 — Before dredging and bottom release opening
September 2023 — After dredging and bottom release opening
September 2024 — Year 1 Cross -Section Survey
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Cross Section 6 — Pool
97
96
95
94
93
.p 92
91
W 90
—*-- May 2023
t Sep-23
89
—K--Sep-24
88
0 10 20 30 40 50
Distance (feet)
*Channel bed measured perpendicular to flow with laser level and tape from a fixed benchmark
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
May 2023
® 44-NE (T) OO 35.420185°,-82.673978" ±108ft ♦ 2450ft
September 2024
View of Cross -Section 6 Facing Downstream
September 2023
May 2023 — Before dredging and bottom release opening
September 2023 — After dredging and bottom release opening
September 2024 — Year 1 Cross -Section Survey
North Fork Reservoir Sediment Release Program
Downstream Channel Bed Monitoring
City of Hendersonville
Representative Site Photos — September 2024
Dredge Spoil Stockpile Area View Facing Downstream from the Dam
View Facing Upstream Towards the Dam
Reservoir