HomeMy WebLinkAbout20241275 Ver 1_Scalesville Rd Permit Drawings_20240922w
HihWa North Carolina Department of Transportation s=
gStOYIyYlW Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 38571.1.1 TIP No.: 17BP.7.R.139 Count ies : Rockingham Page 1 of 2
General Project Information
WBS Element:
38571.1.1 ITIP Number: 17BP.7.R.139 Project Type: Bridge Replacement Date: 4/3/2024
NCDOT Contact:
Galen Cat, PE
Contractor / Desi ner:
Joshua G. Dalton, PE, CPESC
Address:
NCDOT Hydraulics Unit
1590 Mail Service
Raleigh, NC, 27699-1590
Address:
Sungate Design Group, P.A.
905 Jones Franklin Road
Raleigh, NC 27606
Phone:
919-707-6711
Phone:
919-859-2243
Email:
gcail@ncdot.gov
Email:,jdalton@sungatedesign.com
City/Town:
Summerfield
Count ies :
Rockingham
River Basins :
Ca a Fear
CAMA County?
No
Wetlands within Project Limits?
No
Project Description
Project Length (lin. miles or feet):
0.11 Surrounding Land Use: lWoods, Agriculture, Undeveloped
Proposed Project
Existin Site
Project Built -Upon Area ac.
0.4 ac.
0.3 ac.
Typical Cross Section Description:
Scalesville Road (SR 1002): 2 paved lanes (total 22' wide), 4' shoulder on each side (7'
with guardrail). First 2' of shoulder is paved. Varying cut/fill slopes. See project typical
sections for detail.
Scalesville Road (SR 1002): open shoulder section 2 paved lanes (total 20' wide).
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 1500 Year: 2040
Existing: 1340 Year: 2018
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
The North Carolina Department of Transportation (NCDOT) has proposed to replace Rockingham County Bridge #780018 on Scalesville Road (SR 1002) in Rockingham County
over Haw River. The project is located between east of Witty Road (SR 2305) and Church Street Extension (SR 1001). The existing structure is a 3 span bridge (1@17', 1@40',
1@17') and is a steel I -Beam bridge supported by a timber deck with timber vertical abutments. The existing structure will be removed and replaced with a single span (1@100')
39" Box Beam with 4' end bent caps. Excavation beneath the bridge was kept to a minimum to produce as little impact as possible. Geotextile and rip -rap were utilized in an
attempt to reduce stream bank erosion along the banks of the channel underneath the bridge. To avoid direct discharge of bridge storm water into Haw River, deck drains are not
required for the proposed bridge. The run off from the bridge deck will be collected by inlets and discharged outside of buffer zone 2 into a preformed scour hole. Any stormwater
discharge entering into the buffer will be at non -erosive velocities.
Waterbody Information
Surface Water Body t : Haw River
NCDWR Stream Index No.:
16- 1
NCDWR Surface Water Classification for Water Body
Primary Classification:
Water Supply V WS-V
Supplemental Classification:
Nutrient Sensitive Waters NSW
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: Jordan Lake
Project Includes Bridge Spanning Water Body?
Yes
Deck Drains Discharge Over Buffer? No
Dissi ator Pads Provided in Buffer? INo
Deck Drains Discharge Over Water Body?
IN2
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative) I
Highway North Carolina Department of Transportation
Stormwater
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: TIP No.: 17BP.7.R.139 Count ies : Rockingham Page 2 of 2
Preformed Scour Holes and Energy Dissipators
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water Body
Energy Dissipator
Type
Riprap Type
Drainage
Area
(ac)
Conveyance
Structure
Pipe/Structure
Dimensions
in
Q10
cfs
V10
(fps)
BMP
Associated w/
Buffer Rules?
4
19+25 -L- RT
(1)Haw River
PSH
Class 'B'
0.1
Pipe
15
0.5
0.8
Yes
36.25206,-79.80825
Additional Comments
Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy
Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
0N
•
a
2442
2431
Ml(I a
2480
2479
_
y
17BP.7.R.139 158
Witty, Cros
PROJECT
2399
2958
2930 LIMITS
2351 2925
2946
'Al
1002
2948
2934
1oa1
ROCKINGHAM
2947
2933
COUNTY
2946
2351
395--
2455
--- 2307 1992 —_—_—
—_—.
1001
2454 23a5
cnlvsa+llc
—
21M 2308
GUILFORD
1002 4950
2306
COUNTY
4951
2399 4953
2335
2310
4955
4154
VICINITY MAP
DETOUR ROUTE
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
ROCKINGHAM COUNTY
LOCATION: BRIDGE NO.I8 OVER THE HAW RIVER ON
SR 1002 (SCALESVILLE ROAD)
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
17BP.7.R.139
I
38572.1.1 (B-4802)
BRZ-1002(24)
P.E
38572.2.1 B-4802
BRZ-1002 24
RM/ & UTL.
17BP.7.R.139
CONST.
PERMIT DRAWING
SHEET 1 OF 6
DATE: 4/9/2024
END BRIDGE
-L- Sta. 20+4I.30
\
BEGIN PROJECT 17BP.7.R.139
-L- POC Sto. 17+00.00
�
s\
\
BEGIN APPROACH SLAB
-L- Sto.19+28.00
�l l5
s
TO US�158
SR 1002 tSCALESVILLE ROAD)
NO 150 --
220 ANC
V5
BEGIN BRIDGE
\ \ END APPROACH SLAB
END PROJECT 17BP.7.R.139
-L- POT Sta. 23+00.00
-L- Sto.19+38.70
-L- Sta.20+52.00
N
SITE 1\1
THIS PROJECT WAS FORMERLY KNOWN AS B-4802
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DESIGN DATA
eo PROJECT LENGTH
Prepared in ire Office of Simpson Engineers & Associates for
DIVISION 7
ROADWAY DESIGN ENGINEER
PLANS PREPARED BY:
5640 Oillartl Drive
Oo� NOR?
�� qg
a
s
ADT 2013 = 1300
ADT 2030 = 1500
DHV = 14 %
D = 55 %
T = 7 % *
TTST =3% DUAL = 4%
V = 55 MPH
VDIT = 40 MPH
FUNC CLASS = LOCAL
SUBREGIONAL TIER
_
LENGTH ROADWAY PROJECT = 0.095 MILES
_
LENGTH STRUCTURE PROJECT - 0.019 MILES
TOTAL LENGTH OF PROJECT = 0.114 MILES
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
P.F.
SJGIDATUREr
Suite 200
Car Y. NC 27518
468
9191852-0598 Fox)
„939185 0 98
LICENSE NO.C-4434
2024 STANDARD SPECIFICATIONS
DAVPD° SIMPLYON, PE
RIGHT OF WAY DATE:
J U N E 2 2, 2 017
JOSH G. DALTON, PE
LETTING DATE:
OCTOBER 16, 2025
HYDRAULICS ENGINEER
SIGNATURE: RE
SUNGATE DESIGN GROUP, P.A.
R0 JONES FRANKLIN ROAD
RA 919",'NORr^CARDLINA276o,
ENG FIRM LK:ENSE NO. G- K
LICENSE NO. C-890
���GUCs EnctnEER
/� CONTACT.JAMES YATES
NCDOT CONTACT.
DIVISION E
PROG ISIO MANANAGE
GER
DETAIL C
PREFORMED SCOUR
HOLE
PLAN VIEW
PERMANENT SOIL REINFORCEMENT
MATTING (PSRM)
INSTALL LEVEL AND FLUSH
WITH NATURAL GROUND.
PIPE OR DITCH
OUTLET
A
A
SQUARE PREFORMED
SCOUR HOLE (PSH)
(RIP RAP IN
BASIN NOT SHOWN
ffiF
B=4.0 Ft,
FOR CLARITY)
D-15 Ft
s`op
SECTION A —A
F
STND. ROLL WIDTH
INFLOW
PSRIM
FD
(MINUS TUCK)
NATURAL
GROUND
LINER: CLASS B RIPRAP
I B
IN. FTUCK
WITH GEOTEXTILE
I'�
STATION 19+10 -L- RT
-L- PC Sta. 12+00.00
DETAIL A
DETAIL B PROJECT REFERENCE SHEET NO.
STANDARD 'V' DITCH RIP RAP BANK STABILIZATION 178P.7.R.139 — ROCKINGHAM 18 4
I Nor r� scale) INef fe SC1el ROADWAY DESIGN HYDRAULICS
lo'min. \ ENGINEER ENGINEER Newral � Nnmrnl Dorn Lo'mm.
Ground 2.� ,�.� Ground Gmde 2.0
D
Min. D=1 Ft. GEOTEXFILE
p�,r1 —L— STA. 20+60 TO 21+00 LT Type of Liner= CL II 9-56
\ ZlJ —L— STA. 19+98 TO 19+ 21
PO G ^G —L—STA. 19+G98 TO 20+21
50` 25` 0 50` 100' MOTE MACDONALD 18 E, LLC SUNGATE DESIGN GROUP, PA.
\ LICENSE NO. F LICENSE 0
DOCUMENTT FINAL
NOT CONSIDERED FINAL
SCALE: 1 = 100' UNLESS ALL SIGNATURES COMPLETED
Prepared in the
Office of: IlVll
9W0 rn.�n, Nnoo1�n6 16os Driw, Suife ]00
Raleighc
tt
SUNGATE DESIGN GROUP, P.A.
a.UNA„ 1
DENOTES IMPACTS IN
BANK LIZATPERMIT DRAWING
ION
SURFACE WATER SEE DETAIL
TAILB \� \� BZ2 rp SHEET 2 OF 6
EST. 45 TONS RIP RAP ry FRANK MILLER t
EST. 80 SY GEOTEXTILE W
EST. 35 CY DDE 00�\ BZ T EIP
W`` BANK STABILIZATION OEIP DATE: 4/9/2024
SEE DETAIL 8 pS
EST. 35 TONS RIP RAP 1 O �� r WOODS O
EST, 35 SY GEOTEXAP
\3o cv DDE I N gtiti ) �/ r^�— CEASAR CONE III N JAMES TROVATO y1
S /
END OVERLAY/BEGIN GRADBi,-Z,
-L- POC Sta. 18+00.00 a z
o BEGIN PROJECT 17BP.7.R.139 WOODS S\ SI E i ` 0y
w
s -L- POC Sta. 17+00.00 - STANDARD V DIH
'lew000s�a 1 —EDEDETAILa —L— POT Sto. 25+/8.30
X ODS j 1 EST, . 55 CV DDE
CEASAR CONE E BEGIN
E P
BEGIN SBG
+04 LT
�E ly d
WOODS - - El EiP
REMOVE ENs w�
�_
2GI -L- S KE 5R I002 (SCALESVILLE )I I'PA✓ED
TO SP TB !CHURCH STREET
N 37° 02' 28. EAT)
- PDf I ✓ WOODS EXISTING w!N
F - -E
BEGI RTSBI PSH I �\ I
-L- PT Sta. 18+9/.40 I5 EL Ows I END PROJECT 178P.7.R.139
\ tY Bp1
o tD Sp 23p91// �SSHIORIP RAPPOINT (TYP.)� GODS -L- POT Sta. 23+OO,DO
(STRUCTURE PAY ITEM)
E A C MEN VIEW
/ NGftlw d' \SESHIET4 OF
SZL EXCAVATION >
/.�-7q WOODS LIMITS d2 mn +
CEASAR CONE III
CEASAR CONE III
\ END GRADE/BEGIN OVERLAY
\ -L- POT Sto. 2/+90.00
FOR STRUCTURE PLANS SEE SHEETS S-1 THRU 5-16
DETAIL C
PREFORMED SCOUR
HOLE
PLAN VIEW
PERMANENT SOIL REINFORCEMENT
MATTING (PSRM)
INSTALL LEVEL AND FLUSH
WITH NATURAL GROUND.
PIPE OR DITCH
OUTLET
A
A
SQUARE PREFORMED
SCOUR HOLE (PSH)
(RIP RAP IN
BASIN NOT SHOWN
ffiF
B=4.0 Ft,
FOR CLARITY)
D-15 Ft
s`o
SECTION A -A
p
F
STND. ROLL WIDTH
INFLOW
PSRM
FD
(MINUS TUCK)
NATURAL
GROUND
LINER: CLASS B RIPRAP
I B
IN. I'TUCK
WITH GEOTEXTILE
F�
STATION 19+10 -L- RT
-L- PC Sta. 12+00.00
L
G
0
�N
N�
aN
d�
L
0
s
lei -
DENOTES IMPACTS IN \
BANK STABILIZATION
SURFACE WATER SEE DETAIL B
EST. 45 TONS RIP RAP ry FRANK MILLER
EST. 80 SY-GEOTEXTILE V,
EST. 35� CY DDE�
11 WOODS R>�C\
BANK TAIL BIZATI N V
SEE DETAIL
JJJJ EST
ES . EO?EXTIE
JAMES TROVATO ALL `� ES DLa d ��
��� 1
END OVERLA 7B AD
-L- POC S a.1l8+�
��� w000s�� ��
BEGIN PROJECT 17BP.7.R.139 � � �j � � � � $I E 1 �
-L- POC Sta.17+00.00
Ale
�CE�AY�R (INE III ,�eWe A
Li L_
10BEGI rDPSH
✓� ���/ M�
5R'^C�y.35 I RIP RAPe�
p /� \ / m TO $ OULDER I J
T�--� (STRi1CTURE PAY IT J
L L^ EXCRVATI
r*- q WOODS LIMITS
CEASAR CONE III
1
DETAIL B PROJECT REFERENCE SHEET NO.
DETAIL A STANDARD 'V' DITCH RIP RAP BANK STABILIZATION 17BP.7.R.139 - ROCKINGHAM 18 4
I Nof fa scale!
I Nor r� scale) ROADWAY DESIGN HYDRAULICS
lomin. ENGINEER ENGINEER
NNu,.I Nnm.nl Dn�n Lo'mm.
Ground 2.� ,�.� Ground Gmde 2.0
D
Min. D=1 Ft. GEOTEXTILE
-L- STA. 20+60 TO 21+00 LT Type of U.— CL II NIr-Rap
-L- STA. 19-56 TO 19+77
-L- STA. 19+98 TO 20+21
50' 25' 0 50' 100, MOTE MACDONALD 18 E, LLC SUNGATE DESIGN GROUP, PA
LICENSE NO.F-0— LICENSE NO.C-090
DOCUMENT NOT CONSIDERED FINAL
SCALE: 1 = 100' UNLESS ALL SIGNATURES COMPLETED
Prepared in the �L,�//II
Office of: IlVll
AAm9"P fA(1 930 ^nin Campus iw, Suife ]00
DVd Ruleiyn,Ne 11616
SUNGATE DESIGN GROUP, P.A.
aGLINA-1
Ell 2� / PERMIT DRAWING
B7T� LIP SHEET 3 OF 6
°EP DATE:4/9/2024
CEAfAR CONE III N
TANDAH RD V DI
ss D� AI A / / -L- POT Sto. 25+I8.30
1 E 5 CV wDE 1
1 S J J
EXISTING P/W
lEIe eft
att--
-L- S KE SR 1002 (SCAL E RO) 2P PAVED
TO SR 001
37' 02' 28. �T79 (CHURCH STREET EAT)
—T7fi— TI 719-7
/ T EXISTING wW
S P SODS / r
g� _
E-ND`PP%JECT 178P.7.R.139
I -L- POT Sta.23+00.00
S S 4, PF 6
P
e�° �� �° CEASAR CONE III
e END GRADE/BEGIN OVERLAY
v
-L- POT Sto. 2/+90.00
e.
6 yf
Cl yT
f` Q
td
�mo FOR STRUCTURE PLANS SEE SHEETS S-1 THRU S-16
DENOTES IMPACTS IN
W/04/�
10' 5' 0 10' 20'
SCALE: 1"=2D
PROJECT REFERENCE NO. SHEET NO.
17BR.7.R.139-R0CKINGHAM 18
SHEET NO.
ROADWAY DESIGN HYDRAULICS
SURFACE WATER
ER
ENGINEER ENGINEER
�Qh
APO VJJ
dNC® �Il E E PLANS
QO NOT llSE FOR / W ACQUISITION
it
J
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING
S
1
SHEET 4 OF 6
DATE: 4/9/2024
Q,
,
,
�P E,
PUE PUE
PU
SITE
-'' REMOVE
2G1
SP
TB
R
E-
E Lu
CL
PS H
`�J'
PDE
PERM
Wl
�I \
PROJECT REFERENCE
17BP.7.R.139-ROCKINGHAM 18
SHEET NO.
SF
EET
5
OF
6
ROAEENGIN ERSIGN
DWAY
HYDRAULICS
DATE
4/
/2
24
750
MOTE MACDONALD I& E, LLL SUNGATE DESIGN G _
LICENSE NO_-Y LICENSE NO.0 "
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepared i,, the �L,�//,,��
Office of: INII
740
NDN
EGI
VER
GRADE
Y
BRIDGE
CSTA
19+90.
-L-
B GIN
E D
OVERLAY
BADE
sRaeloeiyMna, nNc:n DL,s eS zoo
]m�iep"o1
TA. 1
L
+0
717.17'
00
WX DE
1
P;CAP
0'SKE
S 2
E
+90
718.3
00
'
SUNGATE DESIGN GROUPP.A.
OH_'.Ao
EILEiI RILIIN-t,A2—
730
EGIN
EGN
PROJECT
OVERLAY
ND
OVE
LAY
`a
VERTICAL SCALE
NTAL SCALE
22
1L 717
I
EL
1
TTHORIZO
720
RI
EIMSTOIVG
B
E
DGE
720
ST
20+6
00 LT
710
—L— S
EL =
A 21+
00
L
710
I
P.
.000
'.
'
SLOPE
(NoR
2:1 (2
AU EOP
T. THI
YAP)I
K)
]P(
ELEV
= 711'
t�7[i3700
690
ELEV.
DATE:
707.a
7-1-20
'
6
690
680
EXCAV
(STRUC
TION
URE
190
P Y ITEM(
CY
H
I
I
I
I
I
15 16 17 18 19 20 21 22 23 24 25
N
C
�3/31'J.Gm���
rI'7►ld.7r�71J»►leti�l�ll�iii�!�„
��
O G7
N �
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
19+56 to 19+86 -L-
BANK STABILIZATION
< 0.01
56
19+90 to 20+19-L-
BANK STABILIZATION
< 0.01
TOTALS*:
0.01
1
1 56
10
0
*Rounded totals are sum of actual impacts
NOTES:
2018 Feb