HomeMy WebLinkAbout20241275 Ver 1_Scalesville Rd Buffer Drawings_202409220N
•
a
2442
2431
Ml(I a
2480
2479
_
y
17BP.7.R.139 158
Witty, Cros
PROJECT
2399
2958
2930 LIMITS
2351 2925
2946
'Al
1002
2948
2934
1oa1
ROCKINGHAM
2947
2933
COUNTY
2946
2351
395--
2455
--- 2307 1992 —_—_—
—_—.
1001
2454 23a5
cnlvsa+llc
—
21M 2308
GUILFORD
1002 4950
2306
COUNTY
4951
2399 4953
2335
2310
4955
4154
VICINITY MAP
DETOUR ROUTE
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
ROCKINGHAM COUNTY
LOCATION: BRIDGE NO.I8 OVER THE HAW RIVER ON
SR 1002 (SCALESVILLE ROAD)
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
BUFFER IMPACTS PERMIT
17BP.7.R.139
I
38572.1.1 (B-4802)
BRZ-1002(24)
P.E
38572.2.1 B-4802
BRZ-1002 24
RM/ & UTL.
17BP.7.R.139
CONST.
BUFFER DRAWING
SHEET 1 OF 4
DATE: 4/9/2024
END BRIDGE
BEGIN PROJECT 17BP.7.R.139
-L- POC Sto. 17+00.00
�
s\
\
BEGIN APPROACH SLAB
-L- Sto.19+28.00
::
�l l5
s
TO US�158
--
SR 1002 (SCALESVILLE ROAD)
NO 150
220 ANC
V5
BEGIN BRIDGE
\ \ END APPROACH SLAB
END PROJECT 17BP.7.R.139
-L- POT Sta. 23+00.00
-L- Sto.19+38.70
-L- Sfa.20+52.00
N
SITE 1
THIS PROJECT WAS FORMERLY KNOWN AS B-4802
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DESIGN DATA
eo PROJECT LENGTH
Prepared in ire Office of Simpson Engineers & Associates for
DIVISION 7
ROADWAY DESIGN ENGINEER
PLANS PREPARED BY:
5640 Oillartl Drive
Oo� G�ORQ�
�� qg
a
s
ADT 2013 = 1300
ADT 2030 = 1500
DHV = 14 %
D = 55 %
T = 7 % *
TTST =3% DUAL = 4%
V = 55 MPH
VDIT = 40 MPH
FUNC CLASS = LOCAL
SUBREGIONAL TIER
_
LENGTH ROADWAY PROJECT = 0.095 MILES
_
LENGTH STRUCTURE PROJECT - 0.019 MILES
TOTAL LENGTH OF PROJECT = 0.114 MILES
A,SIG.NATURR:
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
P.F.
SJGIDATUREr
Suite 200
Car Y. NC 27518
52-0468
'9391852-0598 Fox)
„939185?-0598
LICENSE NO.C-4434
2024 STANDARD SPECIFICATIONS
DAVPD° SIMPLYON, PE
RIGHT OF WAY DATE:
J U N E 2 2, 2 017
JOSH G. DALTON, PE
LETTING DATE:
OCTOBER 16, 2025
HYDRAULICS ENGINEER
HYDRA
P.F.
SUNGATE DESIGN GROUP, P.A.
R0 JONES FRANKLIN ROAD
RA 9� L. NORTH CARDLINA276o,
ENG FIRM LK:ENSE NO. G- K
LICENSE NO. C-890
���GUCs EEG,AEER
/� CONTACT.JAMES YATES
NCDOT CONTACT.
DIVISION E
PROGRAA4 MANANAGE
GER
DETAIL C
PREFORMED SCOUR
HOLE
PLAN VIEW
PERMANENT SOIL REINFORCEMENT
MATTING (PSRM)
INSTALL LEVEL AND FLUSH
WITH NATURAL GROUND.
PIPE OR DITCH
OUTLET
A
A
SQUARE PREFORMED
SCOUR HOLE (PSH)
(RIP RAP IN
BASIN NOT SHOWN
ffiF
B=4.0 Ft,
FOR CLARITY)
D-15 Ft
s`op
SECTION A -A
F
STND. ROLL WIDTH
INFLOW
PSRM
FD
(MINUS TUCK)
NATURAL
GROUND
LINER: CLASS B RIPRAP
I B
�
IN. FTUCK
WITH GEOTEXTILE
I-
STATION 19+10 -L- RT
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
O
S
-L- PC Sta. 12+00.00
DETAIL A DETAIL B
STANDARD 'V' DITCH RIP RAP BANK STABILIZATION
(No�r� Scale) (Na�ta Scale]
m'min.
Newrel on6 Lo'mie.
/� Ground 2.� ,�.� Ground Gmde 2'G
Min. D=1 Ft. GEOTEXFILE
p�,r1 —L— STA. 20+60 TO 21+00 LT Type of Liner= CL II P \ ZlJ —L— STA. 19 —56 +98 TO 19+
O —L— STA. 19+98 TO 20+2121
�P 50' 25' 0 50' 100'
\ SCALE: 1=100'
\ BANK STABILI-L 2�
ZATION \
SEE DETAIL I- \ \ 8
EST. 45 TONS RIP RAP ry FRANK MILLER \ \
EST. 80 SY GEOTEXTILE W
EST. 35 CY DDE � � \\ \ 82 T
fi
W,,OS ` BANK STABILIZATION \\ \ OEIP
t4, SEE DETAIL B
EST. 35 To
RIP RAP 1 qP LT
EST, 60 SY GEOTEXTILE
JAMES TROVATO \ EST. 30 CY DDE O,
END OVERLAY/BEGI7GRAD�
-L- POC Sta. 18+00.
BEGIN PROJECT 17BP.7.R.139 W000s\ \ \� $I E/i eti
-1 - Pnf Ctn 17+nnnn \ Yam'/ �. ,� /i r, STANDARD V DF�H
/CEASAR
5 Imlttr aD
TD
WOODS
r*-
/S
SEE DETAIL A
EST. 55 CY DDE
BUI
P S
WoOos DATI
CEASAR CONE III
I F
F
F
SR 1002 (SCALESVILLE RD) i 2I' PAVED
BEGIN RTSBGa"F
+04-/ p\✓�"/\
WOO
1514-
I
� — — — — END PROJECT 3-B00..R.139
CLASS II RIP RAP -L- POT Sta. 23+OO.DO
TO SHOULDER POINT (TYP.)J dOOOS.. NH CEM NT VIEW
(STRUCTURE PAY ITEM) N E E D S~ E ET 3 F 4
EXCAVATION i
WOODS LIMITS dr \ P �
CEASAR CONE III
CEASAR CONE III\
\ END GRADE/BEGIN OVERLAY
-L- POT St,.21190.00
SR 001
STREET EATI
ALLOWABLE
IMPACTS ZONE 1
10' 5' 0 10' 20'
PROJECT REFERENCE NO. SHEET NO.
17BR.7.R.139-R0CKINGHAM 18
PW SHEET NO.
ALLOWABLE
IMPACTS ZONE 2
SCALE: V=20'
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
J
SITE 1
�
J
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
BUFFER DRAWING
S
1
SHEET 3 OF 4
DATE: 4/9/2024
��
cD
Yl
PUE FUE
rR
� -�
��
x � � � '�' R
EMOVE-----
_--------
y
2G1
SP
TB
A- J
R
E w
�
w
PS H
PDE
RIPARIAN BUFFER IMPACTS SUMMARY
IMPACTS
BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
Site Station Structure ROAD PARALLEL
No. (From/To) Size / Type CROSSING IMPACT BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
(ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
1
18+64 to 19+40-L-
ROADWAY FILL
X
1306
701
2007
19+40 to 20+40-L-
BRIDGE
X
2263
2263
20+40 to 20+91-L-
ROADWAY FILL
X
1110
547
1657
TOTALS*:
4679
1 1248
1 5927
1 0
1 0
1 0
1 0
0
NOTES:
2018 Feb