HomeMy WebLinkAboutNCC242937_Site Plan or Location Map_20240924 le SHEET INDEX:
COVER
SEALED SURVEY(SHEET 1)
SEALED SURVEY(SHEET 2) , i-1-
C 1.0-OVERALL SITE PLAN
C 1.1 -SITE&UTILITY PLAN
C 1.2-SITE&UTILITY PLAN t Seal of Approval
C 1.3-SITE&UTILITY PLAN SOMERSET HEIGHTS
C 1.3A-OVERALL PHASE PLAN / 1�
C 1.4-SITE NOTES&STORM DRAINAGE CHART �I %U� I
C 1.5-SOMERSET DRIVE ROAD IMPROVEMENT PLAN(NOT USED) V
City City EngineerIJC 1.6-SOMERSET DRIVE PAVEMENT MARKING PLAN of Winston-Salem /C 2.0-CANNINGTON WAY STA 10+00 TO STA 20+50 PLAN&PROFILEUBDI ISIOI� PHASE 107/03/2024 /
C 2.1 -CANNINGTON WAY STA 20+50 TO STA 32+00 PLAN&PROFILE
` '
C 2.2 CANNINGTON WAY STA 32+00 TO STA 39+91 PLAN&PROFILE ` '
C 2.3-WEATHERED EDGE WAY PLAN&PROFILE WINSTON-SALEM, NC `�
C 2.4-AMBER GATE WAY STA 10+00 TO STA 22+00 PLAN&PROFILE
C 2.5-AMBER GATE WAY STA 22+00 TO STA 29+05 PLAN&PROFILE
\C 2.6-WHEAT HILL WAY STA 10+00 TO STA 19+50 PLAN&PROFILE , Applicant responsible for providing 2 copies of the
C 2.7-WHEAT HILL WAY STA 19+50 TO STA 22+51 PLAN&PROFILE approved plans to the Engineering Field Office.
C 2.8-SANITARY SEWER STA:10+00 T018+20 PLAN AND PROFILE 's°�,fls�
C 2.9-SOMERSET DRIVE ROAD X-SECTIONS 09 Contact Engineering Field Office (EFO) staff to set
C 2.10-SOMERSET DRIVE PLAN&PROFILE � g g up
C 2.11 -ROUNDABOUT TRANSPORTATION MANAGEMENT PLAN PHASE 1 preconstruction meetings and inspections via email Fred
C 2.12-ROUNDABOUT TRANSPORTATION MANAGEMENT PLAN-PHASE 2A&PHASE 2B �Qa� o� Royal (Engineering Field Office Manager)
C 2.13-ROUNDABOUT TRANSPORTATION MANAGEMENT PLAN-PHASE 3 ya ,'904 Fredr@cityofws.org and Erick Smith (Construction
C 2.14-SOMERSET DRIVE ROAD X-SECTIONS(NOT USED) / \ Inspector Supervisor)jameses@cityofws.org
C 3.0-OVERALL INITIAL CLEARING&GRUBBING PLAN --- o�
C 3.1 -INITIAL CLEARING&GRUBBING PLAN y
C 3.2-INITIAL CLEARING&GRUBBING PLAN srluPowrDR r
C 3.3-INITIAL CLEARING&GRUBBING PLAN ti�
C 3.4 /INITIAL CLEARING&GRUBBING PLAN I
C 3.5-OVERALL INTERMEDIATE GRADING&EROSION CONTROL PLAN V I T E / '�
C 3.6-INTERMEDIATE GRADING&EROSION CONTROL PLAN
C 3.7-INTERMEDIATE GRADING&EROSION CONTROL PLAN //
C 3.8-INTERMEDIATE GRADING&EROSION CONTROL PLAN
, __4//)
C 3.9-INTERMEDIATE GRADING&EROSION CONTROL PLAN
C 3.10-INTERMEDIATE GRADING&EROSION CONTROL PLAN
C 3.11 -OVERALL FINAL GRADING&EROSION CONTROL PLAN �( LAKE POINT DR
C 3.12-FINAL GRADING&EROSION CONTROL PLAN \•;/
C 3.13-FINAL GRADING&EROSION CONTROL PLAN p1/ HUNTERS FOREST DR
C 3.14-FINAL GRADING&EROSION CONTROL PLAN
CARAWAY LN �1 i
\
C 3.15-FINAL GRADING&EROSION CONTROL PLAN BRIAR LAKE RD
BRIAR LAKE RD
C 3.16-FINAL GRADING&EROSION CONTROL PLAN / ___1
C 3.17-OVERALL FINAL GRADING&STORMWATER MANAGEMENT PLAN ` I
LITTLE CREEK
C 3.18-FINAL GRADING&STORMWATER MANAGEMENT PLAN CR
%
C 3.19-FINAL GRADING&STORMWATER MANAGEMENT PLAN a
C 3.20-FINAL GRADING&STORMWATER MANAGEMENT PLAN 1 s,34
C 3.21 -FINAL GRADING&STORMWATER MANAGEMENT PLAN
C 3.22-FINAL GRADING&STORMWATER MANAGEMENT PLAN
C 3.23-WETPOND#1 ENLARGEMENT PLAN LOCATION MAP
C 3.24-WETPOND#2 ENLARGEMENT PLAN SCALE: 1" =500'
C 3.25-WETPOND#3 ENLARGEMENT PLAN
C 4.0-DRAINAGE AREA MAP
C 4.1 -DRAINAGE AREA MAP
s C 4.2-DRAINAGE AREA MAP SITE DEVELOPER/OWNER SURVEYOR
C 4.3-SKIMMER BASIN DRAINAGE AREA MAP TRUE HOMES, USA COE FORESTRY & LAND SURVEYING
C 4.4-SKIMMER BASIN DRAINAGE AREA MAP
C 4.5-SKIMMER BASIN DRAINAGE AREA MAP MR. JEFF GUERNIER P.O. BOX 36
C 4.6-PRE-DEVELOPMENT DRAINAGE AREA BASIN MAP 336-451-6682 WALLBURG, NC 27373
ry C 4.7 PRE DEVELOPMENT DRAINAGE AREA BASIN MAP JGUERNIER@TRUEHOMESUSA.COM 336-769-4673
0
C 4.8-POST-DEVELOPMENT DRAINAGE AREA MAP C 4.9-POST-DEVELOPMENT DRAINAGE AREA MAP 121 SHIELDS PARK DRIVELaBella
C 4.10-DRAINAGE,MAINTENANCE&ACCESS EASEMENT MAP KERNERSVILLE, NC 27284
C 5.0-EROSION CONTROL DETAILS •`�cN4A!?o'
FE0 Powered by partnership.
t C 5.1 -EROSION CONTROL DETAILS '�'_`
C 5.2-NCGO1 GROUP STABILIZATION/SELF INSPECTION zzosi 939 Burke Street, Suite H
-,,.o. 0, E.�. `` Winston-Salem, NC 27101
i,4../CA.......',` (704) 560-8514
':1 �I/� 't� C#0430
E Email: pstimpson@labellapc.com
REVISION NO DATE: DESCRIPTION.
2 1 3/25/24 MODIFICATIONS FOR PROJECT NO: 2230105
ROUNDABOUT
2 6/12/24 CITY COMMENTS
n \ i,