HomeMy WebLinkAboutFigure 16 LayoutWithOutfalls Ga\a�e �a
� ,• ,� Quality Inn Project Location
i P
M;,,C Shelby
O
oGastonia
o� a
s
s S
j 0Charlotte
o
ooa �! Perimeter Po_n�d `. ------- North Carolina
r' T 71 M S
� ' - ` � -C-
�o, ,� ♦ South arolina,'-
r Pt N �d�� O ,
Beason`
Creek,Buffalo
Creek Watershed '
• 1
o ='; Permit Boundary
NC Jurisdictional Waters 50 Foot Buffer
/ s of
gsCreek arc° Property Setback
Gaae\\ 216 Perim �Pond ; O No Buffer
1
o = Proposed Walking Path
® Undisturbed Enhanced Evergreen Buffer
® Undisturbed Naturally Vegetated Property Buffer
= Undisturbed Planted Vegetated Buffer
PAN
PJe ,♦ ° ,
r/7 Vegetated Berm
S a fir; Proposed Outfalls
co O � ei r
O Outfall Location
,p O Temporary Outfall Location
\
i t o c CO
S-1313 �`� "�,' ; Contours
Collection 20 Foot Contour
�♦ Pon d M81 S-A13 \ �' ,, ` 9�0� w O�O�♦ ,� O� o "' ,�' C0�;y T I'
e ♦ � W-B11
raP G^6 qdry ` . -- N . S-B14 0
Hydrology♦ W-B05 , WB-001
♦ S-B0
♦
• .• '
-1306 .''s=cos Conduits and Culverts
goo S-Bo7 90 ��� - Drainage Infrastructureis
zoa ° Note 5 ,� , ,/S=Co7 , '
2- Named Flowline
SS, ;� 9°` � , -' o ,-' ,.°°° w-coo o
F - - Unnamed Flowline
�960� 940 OOp -J ► e ," ,� ♦ 90 '
W-0O2 i ,.--- -- oo�" •' ♦`♦ ,•' S-008 U
w6-A02 ; ;' 202� 10 0 Year F I o o d p I a i n 9 �� ' - °°j ♦ � a
- 14
SePn " ♦ uwaorse,W Collection "' ♦♦ j ✓
w-o7A �, \ a,o� - s-A25 °° P o n d
960 °j i90 H �_ M12 c " ,' ♦ "� �
` #0 Collection ♦ ♦� ° a
_ �,✓ w . . W-A1s °6 " E7 Proposed Dam a
S,A0;7 1' o �� Pond CO3
o Sed on
• ,• i
-100
° - � Water Storage Basin 1
y ,9 062 63
WB-B02
� NC Hydrology
8 S-B03 s
a � O os� W-B08 ,
880 -,- �� - 2 NC Jurisdictional Stream (S-A02)
o o �•�" w=A1s 920 � NC Jurisdictional Waterbody S-B08
s=Aos� w-B02 p O o - 8go ( ) m
a
S=A10 •° , s=BoB�° ,,," ,♦,." NC Jurisdictional Wetland (W-A02)
8�0 �80 201 h d W-A15
~" S-105 *Collection �- zi
ti° I Pond M11 - CO ,� Headwaters
• 96° 4th. / W-B09 � a Kings Creek
Watershed x
� �rJ
Collection w-B14
��° • `poo Pond C01 ��
CD
0 900 1 .� W-B14 8s0
9so �o Notes:
w6-B01 - Note 1 : Permit Boundary updated by ERM on September 3 2024. Y
W-A01 -'
W-Ba4 - Note 2: Project Features are based on Draft Site Layout Rev K m
o s-Bo$ 203 provided by Hatch on July 18 2024.
880� P ly, - Note 3: Wetland delineation data provided by SWCA on May 29 2024.
OO,Sf , �,• 103 ° -,, - Note 4: Contours derived from GPI LiDAR April 2022 flight. J
Collection W=B14 g6 ,
- Note 5: Area excluded from the permit boundary, existing
PyoWA12/ wB-Bo2 facilities are not related to mining activity in North Carolina.
♦ 065�
,♦�o° S-917 °6 N 0 0. 1 0.2 0.3 �,
O S-A05 , • WB-A09
� • TO
. m
%/ 064 c(0 O/ o
9Z° j 02 ad Pond 64 ' 8to) '
W439
WRC Pond Miles
Y,
ro
" ` S-A'44 W-A11
w
°°° % / 1 inch = 0. 1 mile when printed at 24"x36"
Q
� ' z
Figure 16
�� g
rK
s.B°$ z
0KMM Layout with Outfalls
" Ga9ePd Ga\\\e Kin s Mountain Lithium Mine, g
m
Albemarle
cd9 Kings Mountain
� Cleveland County,
CO
v North Carolina
a a