Loading...
HomeMy WebLinkAboutFigure 9 LifeOfMinePhase2Year5 °°o O ldd� aF\tea Pod Shelby Project Location Gastonia Rd * to ,Charlotte North Carolina South Carolina Perimeter Pond M71 O `0r h4rSf t� Ge� Dewatering - - - O Q aC9te Storage Y C,,=Permit Boundary Heavy Electric r ` - 'f - p NC Jurisdictional Waters 50 Foot Buffer Charging Station {/L/ } Property Pro ert Setback Laydow>� I h , ` O No Buffer c l Q Q Proposed Walking Path . Open Pit o \CC ®Undisturbed Enhanced Evergreen Buffer Perimeter Truck Maintenance Shop Pond M72 / "_ / ®Undisturbed Naturally Vegetated Property Buffer Lube Storage Temp.Perimeter 216 - Q Undisturbed Planted Vegetated Buffer UtilityAreaRool Room Pond M73 W&F Shop Layd�o�rea ® o Q Vegetated Berm Mine Change Housel jnt�ri" i Mine Design Feature Mine Offices r (� Warehouse 4 Growth / \\�\' �Open Pit Contour 0 Stto algeOde\ /> r\,,Overburden Storage Facility Contour 4 GS Rock Storage Facility Contour North Gate 1 Open Pit �d P� Security Offices Ready Line Wash Bay& � ❑Overburden Storage Facility e Water Recir.Area / 1 G Fire Water Tanks ) - Q Rock Storage Facility to &Pumps y Truck �el Station boo �, ♦ 1 t� /�, Tech Center Gate l� I Mine Stockpile Area Dominion Gast Collection Weighing yap \ \ Securily' Offic'e �4 16 Metering Station Pond M61 4if, —Run-of-Mine Pad Pie 6d7 0�. Tire Yard Ada "� I South Gate ' ��Y g Storage Dewaterin a 4 Run-of=Mine Security Office O p ^ , „_ ♦ h o Growth Media Storage Water Truck I♦♦ -\- Pad /�/� Laydown Area Tailin sLoadout Fill Area Note 3 - Q�w s St i Overburden Primary\ Infrastructure 1�mm Building\ Crusher; 0 Misc.Waste Storage ! , ter- Fence Line - - Storage Facility 2 1 �� ♦ ,t —Pipe Line a k000 Sed Pond 1 , ♦ Processing Features and Infrastructure 0 010 .� Colley lion 85 PIan4Feed j ` Overburden_ 9i �� e / �.' a ` �100o f e4o O Gee And M12 Stockpile Area �� 161 Proposed 44kV Route a _ Storage sio y d Existing Building Facilit :1 g40 062 Y ®Conveyors mac/ Laydown South Creek �,// Secondary +Proposed Building c Sed Po7mc! 2 Arch Culvert Rail'Car,Fueli'Station Crusher Collection g / if Pond CO3 Proposed Dam &Infra St le \/ Tertiary / ♦ E o ° Transportation 0 /Sed Pond 63 Crusher Tooling 0 ♦ Crusher // Area&Shc Flotation p ♦ Existing Road p 1 \ Sorting Building .1 — ConcentratorrTruck\ Building Reagan ` Riprap Diffuser Railroad Load-Ouii�ilrliri' �r�Storage 4� \ �f ♦ Rrockf�Checkdam Haul Road Concentrator- y Electricals Electrical Building y Rock Storage 9 Site Road Load�-IO,ut Bins Natural Gas Building Facility /� 6�/, i M�te�ingStation , Concentrator Gate/Security Office Hydrology LL Collection Pond M11 Future DMS Building Collection • Outfall Location o , Pond'C01 DMS Building —Conduits and Culverts Warehouse c,. a n Filtration Building 2-Drainage m Rock Storage p g Named Flowline G 1 m I tie I Raw Compressor S° FaCllltyA f i o03 Water Pump Pond x Concentrator Of lice/ hO0/ �� f� Laydownl Q ♦ Canteen/Change House Water Storage Basin 1 Sr Water Storage Xi' WRC Pond 51 m� Concentrator Water Notes: 7 Collection PondCO2 \� Basin 1 Treatment Plant 9s �� 5 Note 1:Permit Boundary updated by ERM on September 3 2024. x Dam �� Note 2:Mine phases were provided by SRK on April 19 2024. °d 064 ♦ y o05 Embankment Note 3:Area excluded from the permit boundary,existing d/ facilities are not related to mining activity in North Carolina. —vv.,:Pond61 Se�nd64 ,�� ,� N a Overburden : := 12 — ,Sto�agey }� 0 0.2 0.4 a Facility 3 ��� �� rJ+ Miles 0.`�C� 1 inch = 0.2 mile when printed at 11"x17" ,�� Gaffe Rd a z Qcd9� Figure 9 Sequence Map: Interim Operations g (End of Mining Year 5) LOM Ph 2 Kings Mountain Lithium Mine Albemarle Kings Mountain ��` Q o ea City Cleveland County, 1 o a0e Lake o North Carolina g