HomeMy WebLinkAboutFigure 9 LifeOfMinePhase2Year5 °°o O ldd� aF\tea Pod Shelby Project Location
Gastonia
Rd
* to ,Charlotte
North Carolina
South Carolina
Perimeter
Pond M71
O `0r
h4rSf t� Ge� Dewatering - - -
O Q aC9te Storage Y C,,=Permit Boundary
Heavy Electric r ` - 'f -
p NC Jurisdictional Waters 50 Foot Buffer
Charging Station {/L/ } Property Pro ert Setback
Laydow>� I h , ` O No Buffer
c l Q Q Proposed Walking Path
. Open Pit o \CC ®Undisturbed Enhanced Evergreen Buffer
Perimeter
Truck Maintenance Shop Pond M72 / "_ / ®Undisturbed Naturally Vegetated Property Buffer
Lube Storage Temp.Perimeter
216 - Q Undisturbed Planted Vegetated Buffer
UtilityAreaRool Room Pond M73
W&F Shop Layd�o�rea
® o Q Vegetated Berm
Mine Change Housel jnt�ri" i Mine Design Feature
Mine Offices r (�
Warehouse 4 Growth / \\�\' �Open Pit Contour
0 Stto algeOde\ /> r\,,Overburden Storage Facility Contour
4 GS Rock Storage Facility Contour
North Gate 1 Open Pit
�d P� Security Offices Ready Line Wash Bay& � ❑Overburden Storage Facility
e Water Recir.Area / 1
G Fire Water Tanks ) - Q Rock Storage Facility
to &Pumps y Truck �el Station boo �, ♦ 1
t� /�, Tech Center Gate l� I Mine Stockpile Area
Dominion Gast Collection Weighing yap \ \ Securily' Offic'e �4
16
Metering Station Pond M61 4if, —Run-of-Mine Pad
Pie 6d7 0�. Tire Yard Ada "� I South Gate ' ��Y g Storage
Dewaterin
a 4 Run-of=Mine Security Office O p ^ , „_ ♦ h o Growth Media Storage
Water Truck I♦♦ -\- Pad /�/� Laydown Area
Tailin sLoadout Fill Area Note 3 -
Q�w s St i Overburden Primary\ Infrastructure
1�mm Building\ Crusher;
0 Misc.Waste Storage ! , ter- Fence Line -
- Storage Facility 2 1 �� ♦ ,t —Pipe Line a
k000 Sed Pond 1 , ♦ Processing Features and Infrastructure
0 010 .� Colley lion 85 PIan4Feed j `
Overburden_ 9i �� e / �.'
a ` �100o f e4o O Gee And M12 Stockpile Area �� 161 Proposed 44kV Route a
_ Storage sio y
d Existing Building
Facilit :1 g40 062 Y ®Conveyors mac/ Laydown South Creek �,// Secondary
+Proposed Building
c Sed Po7mc! 2 Arch Culvert Rail'Car,Fueli'Station Crusher Collection
g / if Pond CO3 Proposed Dam
&Infra St le \/ Tertiary / ♦ E
o ° Transportation
0 /Sed Pond 63 Crusher Tooling 0 ♦ Crusher
// Area&Shc Flotation
p ♦ Existing Road
p 1 \ Sorting Building .1 —
ConcentratorrTruck\ Building Reagan ` Riprap Diffuser Railroad
Load-Ouii�ilrliri' �r�Storage 4� \ �f ♦ Rrockf�Checkdam
Haul Road
Concentrator- y Electricals Electrical Building y Rock Storage 9 Site Road
Load�-IO,ut Bins Natural Gas Building
Facility /� 6�/, i M�te�ingStation , Concentrator Gate/Security Office Hydrology LL
Collection Pond M11 Future DMS Building
Collection • Outfall Location
o , Pond'C01 DMS Building —Conduits and Culverts
Warehouse
c,. a n Filtration Building 2-Drainage m
Rock Storage p g Named Flowline G 1 m I tie I Raw Compressor
S° FaCllltyA f i o03 Water Pump Pond x
Concentrator Of lice/
hO0/ �� f� Laydownl Q ♦ Canteen/Change House Water Storage Basin 1
Sr Water Storage
Xi' WRC Pond 51 m� Concentrator Water Notes:
7 Collection PondCO2 \� Basin 1 Treatment Plant
9s �� 5 Note 1:Permit Boundary updated by ERM on September 3 2024. x
Dam �� Note 2:Mine phases were provided by SRK on April 19 2024.
°d 064 ♦ y o05 Embankment Note 3:Area excluded from the permit boundary,existing
d/ facilities are not related to mining activity in North Carolina.
—vv.,:Pond61 Se�nd64 ,�� ,�
N
a Overburden : := 12
—
,Sto�agey }� 0 0.2 0.4
a Facility 3 ��� �� rJ+ Miles
0.`�C� 1 inch = 0.2 mile when printed at 11"x17"
,�� Gaffe Rd a z
Qcd9� Figure 9
Sequence Map: Interim Operations g
(End of Mining Year 5) LOM Ph 2
Kings Mountain Lithium Mine
Albemarle
Kings Mountain ��` Q
o ea City Cleveland County, 1
o a0e Lake o North Carolina g