Loading...
HomeMy WebLinkAboutFigure 8 LifeOfMinePhase1Year0 oo O `day e�\ea pad Shelby Project Location Or Gastonia Rd f- _ Charlotte 7 j _ North Carolina South Carolina Perimeter A. 1P� O `0r i7eh4r p^ g� �a 800� \ a Sf t� GP'O Dewatering 700 - •C;'Permit Boundary� P �ac9ta Storage Y Heavy Electric r - 'f 0 0 NC Jurisdictional Waters 50 Foot Buffer Charging Station > Property Setback ■ Q No Buffer LaydownArea y fir I 'open it J Q( Q Proposed Walking Path Undisturbed Enhanced Evergreen Buffer Perimeter / �I ® 9 Pond M72 p0 Undisturbed Naturally Vegetated Property Buffer Truck Maintenance Shop f. e Lube Storage 216 Temp.Perimeter ✓ /' p t)Undisturbed Planted Vegetated Buffer Utility Arearrool Room Area Pond M73 Vegetated Berm W&F ShopLaydown Mine Change House/Canteen ,�i �r' a / Mine Design Feature Mine Offices / n \ ' ` / �p f\j Open Pit Contour Warehouse Growth \� Media f"V Overburden Storage Facility Contour 0 ° Storage r� a�0 /> �Rock Storage Facility Contour In-Pit PAG _ 4Sfr! In-Pit PAG Storage North Gate 1 Storag'Area / d PV Security Offices Ready Line Wash Bay& d/Or` Open Pit Fi y ► 1 Q Overburden Storage Facility e Fire Water Recir.Area ,'/ G re WaterTaoks � 1�� Q to ) � Rock Storage Facility &Pum t� Pumps y f w Truck t�Fuel Station , /� J�7 Mine Stockpile Area Dominion Gas' CoWei hin Tech Center Gatelag 9 tiSecurityOffice 4* Metering Station PoneySouth Gate � Run-of-Mine Pad ' g Tire Yard \ �' SecurityOffice Dewatering Storage 0 Growth Media Storage �o `-Building s Loadout• Building ater Truck Pad �� /�/� �Laydown Area r Fill Area Note 3 - �' ary �' m Overburden ar- Fence Line m� lm s st � so4 Storage �r c;sne�,w � Infrastructure _ Miso.Waste \ r/� 'a Storage Facility 2/ 1 202 ♦ —Pipe Line �000 Sed Pond1 I` —Processing Features and Infrastructure a Overburde7 9,0 �� 010 c°°. =% ss Plad a �Stora e oo Pond M12 —Proposed 44kV Route ypp G� Stockpile Area �� 161 Q� rag_ 970 61 / Existing Building N Facility:1 g40 062 South Creek ®__"3°f� e/La n Secondary +Proposed Building c Sed Pond'62 �Arch Culvert Rail'Car, elin Station / Crusher Collection Proposed Dam N 063%067 O &Infra Storage)ge) Pond CO3 L• _rrj� Tertiary I Transportation o `/Sed Pond 63 Crusher Tooling Q Crusher E x v� A Area a&rSliop Flotation —Existing Road o Future Rock Storage /, �N�� Sorting Building ., - — Railroad — p ConcentratorrTruck\ Building Reage\ Riprap Diffuser Facility Phase 2 �' #1 Storage 4�, \ /� Haul Road Load-Ouf�Buildin'g .� Rrockfill Checkdam ri Concentrator- •�201 �f`, '� Site Road o ♦ Electrical Electrical Building Load-Out Bins Natural Gas Building 4* Hydrology Rock Storage /1�/// MeteiingStation Concentrator Gate/Security Office m Collection Pond M11 'F Outfall Location FacilityX Phase 1 r Collection FutureDMSBuilding �...�_. Temporary Outfall Location LL Pond,L; DMS Building a o Warehouse —Conduits and Culverts a a n Filtration Building Drainage m Rock Storage Q g * m tree' .♦ 203 Raw Compressor Building 2j•Named Flowline z S'0 Facility "- I 003 Water Pump Pond x Concentrator Offiicel h00/ �� f;� Laydownl Q CanteenlChange House d Water Storage Basin 1 Sr l ,, Water-Storage �' WRC Pond 51r m� \ Concentrator Water Notes: 1 Collection Pond CO2 ,qs � ��/ �- 4,11 Basin 1 Treatment Plant -Note 1:Permit Boundary updated by ERM on September 3 2024. x Dam �� Note 2:Mine phases were provided by SRK on April 19 2024. 005 Embankment Note 3:Area excluded from the permit boundary,existing facilities are not related to mining activity in North Carolina. LL WRCPond�61 Se�nd64 ,� ,� N E a Overburden ,.r 11� 0 0.2 0.4 12 Storage // _0 Facility3 �� �� rJ+ Miles `�C� , 1 inch = 0.2 mile when printed at 11 rrx17rr ,�� Gaffe Rd a z no Q) Figure 8 Sequence Map: End of Construction g (End of Mining Year 0) LOM Ph 1 Kings Mountain Lithium Mine Albemarle Kings Mountain ��` Q o Qa City Cleveland County, 1 o a0e Lake North Carolina o g