Loading...
HomeMy WebLinkAboutFigure 6 Stormwater Mgt Flowsheet rev 2024-09-14 Figure 6 - KMM Stormwater and Water Management Flowsheet NC-DV6 OVERBURDEN STOCKPILE ACCESS ROAD AND BATTLE ACCESS ROAD FACILITY 1 O WATERSHED SOUTH CREEK NPI GROUND ROAD AND BATTLE Overtop WATERSHEDS� pond Pumpout WATERSHEDS GROUND ROAD BATTLE ss p"m m WATERSHEDS GROUND ROAD — O g —p�---tee--- m WATERSHEDS 31.2 gpm / = 5.7 gpm o y y EXISTING f Overtop ; U 5.9 gpm e a SED POND 62 AND 63 O6 �63 I z I a 0. NC-P43c 17.2 gpm RAILROAD I x a 1= 22 gpm Oa9e CULVERTS POND M81 z v I c z z 157 gpm CteeK I z I --l---�---� \ / So�cr I a 12.9 gpm m n SOUTH CREEK yy O MULTI-PLATE ARCH M \ 7.7 gpm / I vertop a'1 U U CULVERT NC-DV4&5 I *—NC-CULV-P43— s os� z z �y RSF-A RUN-ON v PIT PERIMETER POND 73 O a IUO/I NC-H51 WATERSHEDS o HAUL ROAD AND RAILROAD ' I Overtop c I " s CORRIDOR WATERSHEDS I v A o` I 0 I PIT PERIMETER POND 71 ROCK STORAGE z i PHASE 1&2 PIT ONLY FACILITY X C-NWR51a-g PAG Contact Water _ I UNDIVERTED PIT v 'o NC-DV61 _ 80gpm —p�� WATERSHED a) 12 gpm I HAUL ROAD I KINGS CREEK RSF-A RUN-ON I I l� +�11 WATERSHEDS o WATERSHED WATERSHED � I Overtop I I a a I a O RSF COLLECTION POND 51 I I = = Overtop OVERBURDEN z Oz \ , STOCKPILE I PIT PERIMETER POND 72 CARDIO HILL FACILITY 3 ROCK STORAGE I AND PIT O C-NWR61a-f FACILITY A L— 10.6 gpm (REMOVED IN PIT PHASE 3) UNDIVERTED PIT \ / PERIMETER ---—Pill -CULV-H21— 150 m -- co WATERSHEDS WATERSHEDS Overtop 06J43�pm e I Pit Sump Pumpout a NC-P25a PIPE--- PFE-- p�---PIPE---per---PPE---q�— PIPE---PIPE---pI s\ SED POND 64 j m gp OPEN PIT �Qd Non-Process Contact Water O 7.8 9P U z - Overtop I I HAUL ROAD OVERBURDEN w SEDIMENT POND 1 E 58 pm WATERSHEDS PIT SUMP E z z Of I WATERSHEDS m N \ g / STOCKPILE o w> RSF COLLECTION POND 61 = NC-CULV-H43— FACILITY 2 o x= wUU I WATER � z NoNC-P64& w 11 Dischar e _ Overtop(D PLANT Flow M�oring\ I WE SEDIMENT POND 1 Overtop KMSW8 \ Pond I Kings Creek Drainage s SOUTH CREEK RESERVOIR �J Release I I Pond Pumpout Flow Monitoring � Pond I Pumpout 93 � KMSW3 O gO Overtop ORE SORTING AREAOvertop I arn I WATERSHEDS I s POND M11 POND M12 E z s l L— Pond Pumpout {p�, LEGEND -fNPE---RR---PPE---PPE---ff9PE —PIPE---pff---qpE---RR---PIPE--ga yP� N R=7 �— I� I w U Contact Water Pipeline s Pond Pumpout � Non-Contact Water Stream Pumped Flow —%� PE--—� —� —q� —� —� %� —Are —% ~— gP Open Water --PIPE Treated Effluent i O m O PFE 4i?M N Non-Process Contact Water Stream ��JJ — —� —PFE — — —per — E — — � I f Upset Condition Overtopping Flow 1 I Overto / PROCESS AREA Overtop N PAG Contact Water Stream O - Flow Monitoring Location RawPIPWEate2t0— t Use Pill i WATERSHEDS Monitored Flow Release gpm I Water Transfer Pipeline PONDS C01&CO2 --- � O I I POND CO3 \ / CREEK Off-site Discharge O p __I._ �\ Culvert NCG02 Discharge Location Overto }f�n._.. r' NC-H42a Non-contact Water Channel ID Flow Monitoring 03 28�0E�pm Contributing Watershed KMSW7 —, O� WSB-1 Release C-NWR61a Contact Water Channel ID .10e KINGS CREEK WATER STORAGE BASIN 1 WATERSHED 7.8 gpm Average Annual Flow(50th percentile year) 2100 gpm REVISIONS DESIGN:DPH REVIEWED:JO PREPARED BY: DRAWING TITLE: REV. DESCRIPTION DATE DRAWN:DPH APPROVED:JO KINGS MOUNTAIN MINING PROJECT A ISSUED FOR CLIENT REVIEW 06/25/2024 COORDINATE SYSTEM: mow srk consulting KINGS MOUNTAIN STORM WATER MANAGEMENT 0 ISSUED FOR PERMIT 07/03/2024 N/A PREPARED FOR: FLOWSHEET KINGS MOUNTAIN DATE: REVISION: DRAWING NO.: Jk ALBEMARLE MINING PROJECT 07 0 IF THE ABOVE BAR Operated by: SRK PROJECT N NO.: FIGURE 6 DOES NOT MEASURE 1 INCH, FILENAME:SRK Surface Water Flowsheet 03JUL2024.dwg THE DRAWING SCALE IS ALTERED Albemarle-Lithium USPR000576.1800 C:\Users\dhoekstra\SRK Consulting\NA USPR000576 Albemarle Corporation Kings Mountain 2022 Pre Feasibility Study-Internal\0300_Hydrology\Wbal Flowsheet\SRK Surface Water Flowsheet 03JUL2024.dwg