Loading...
HomeMy WebLinkAboutFigure 13 Phase 2 Construction Stormwater Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ♦% ��� TCF S. BATTLEGROUND AVE. LEGEND. PERIMETER RIP-RAP � � ���'�� PROPOSED TOE OF FILL SLOPE A CHANNEL (TYP.) ♦/ / __ _ _ �♦ / 1 PROPOSED TOP OF CUT SLOPE ♦ ------ ���\ / I I FLOW PATH ♦ / ♦ `� \\� / I / _ POND OUTLET PIPE � ♦�♦ ```���`��� / � DISCHARGE TO PHASE 3B — — —EXISTING GROUND DEVELOPMENT PHASE BOUNDAR 1 1 1 \ \ I LIMITS OF DISTURBANCE \ OVERBURDEN \ \ POND OUTLET PIPE STOCKPILE \�N DISCHARGE TO ,/ ��i (LOD) \ \ EXISTING CULVERT PHASE-3A �� GROWTH MEDIA OSF-1 \ \ \ ROCK CONSTRUCTION ( ) -'- O (AREA=63 AC.) STOCKPILE �- ENTRANCE & EXIT NS SEDIMENT I I j (PRACTICE 6.06) POND 3A EROSION CONTROL C BLANKET (PRACTICE 6.17) OSF SEDIMENT POND 1A �` I / \ /,� SUPER SILT FENCE/COMPOST TCF ♦ � � ♦ � � SEDIMENT FILTER SOCK (CFS) (TYP.) j PROPOSED 18" � PROPOSED 18 ®I _ ♦ POND 36 (PRACTICE 6.66.6.62) CULVERT CULVERT CFS �� ��� �♦ / POND OUTLET PIPE SEDIMENT BASIN WITH SKIMMER OSF SEDIMENT / \ L DISCHARGE TO ( ) / I POND 1 �P >' ♦ PRACTICE 6.61 V ,., a 1 / \ EXISTING GROUND = NOTE: STORMWATER ENTERING THE D — � ��� \ � --------- RIPRAP LINED CHANNEL l � � I 1♦ \ PROPOSED 18" OPEN PIT IS DISCHARGED VIA (PRACTICE 6.21) / _ do j I CULVERT PUMPS AS PER NPDES PERMIT V�� 1 I OUTLET PROTECTION LEVEL PERIMETER RIP- lr� � --------- / OVERBURDEN I RAP SPREADER (PRACTICE 6.4) STOCKPILE I CHANNEL (TYP.) FACILITY (OSF-2) I I ------ DIVERSION BERM I CFS CREEK (TYP.) E I DRAINAGE AREA PIT PUMP AND PIPING CONTRIBUTING TO I CULVERT j //N / \ ; ; i r- 24-INCH CULVERT TEMPORARY CONSTRUCTION � I 1 DISCHARGE (5.7 ACRES) FENCE (TCF) � 0 RSF—A � �� / \ �� CULVERT DRAIN/ / � � \ \ % 4 RSF-A / / / \� STORMWATER / /j ���` INSTALL 24 ;, FRENCH DRAIN \ � \ ' I CULVERT / SRK ROAD \ COLLECTION F CHANNEL DITCH w � ♦ �� �� j� _ — — — _ STORM SEWER/OUTLET \ j RSF-X \ \ \ SOUTH CREEK / STORMWATER V A ♦ - �i\ STRUCTURE � � � ♦ SEDIMENT PERMANENT OUTFALL % COLLECTION \ � � POND DITCH \ �.�� ♦ � � V / � TEMPORARY OUTFACE \ TIN MINE ROAD � OSF SEDIMENT , RSF-X \� \ POND 2 / f / \ POND OUTLET PIPE `��\ `���` / '�✓ I DISCHARGE TO KINGS SEEK EXISTING STORM DRAINAGE FEATURE i CFS I . \ .� �/ / ; 1 TECH CENTER - H SEDIMENT POND WRC-61 � / / _(TYP.) 1 PROPOSED 24" � / / I ' ;Ol_ggllaw- _ --- REC ------ -- = RECB B _ _�_�� RECB CULVERT ® •__ \ — _ SOUTH CREEK PHASE-1A I ' ��\ RESERVOIR --- ---------- FRENCH DRAIN SEDIMENT m � SEDIMENT POND � � � \\ HOLIDAY INN DRIVE- PERIMETER RIP-RAP ��_ ` —► / POND W 2A (FUTURE (TYP.) �-� = =�� WRC-51 SEDIMENT POND 1A m I PHASE-1B j I LJL PHASE-1C \\\\ CHANNEL TYP. ` POND OUTLET PIPE DISCHARGE \'� I I (AREA=27.5 AC.) � � OPERATIONAL I � (AREA=21 AC.) (FUTURE OPERATIONAL \ I POND M-12 I OSF SEDIMENT TO SOUTH CREEK - OVERBURDEN STOCKPILE POND 3 POND M-1 1) -- POND OUTLET PIPE DISCHARGE — ----1- -------------------�- -- -- -- — ------ -------- r FACILITY OSF-3 TO SOUTH CREEK -___ _ RECB ______—_____ ____ ______ __----------- DISCHARGE POND OUTLET PIPE RECB -_---- --------TO POND-M11 ECB I I CFS LOD - DIVERSION BERM KINGS CREEK (TYP.) j� (TYP.) (TYP.) 1-85 ------------ ----_-----I L--- _ _ K KINGS CREEK i I INDUSTRIAL DRIVE CFS I �, I I i (TYP.) PHASE-2A I II POND OUTLET PIPE TEMP SEDIMENT \` (AREA=38.5 AC.) TOP OF DISCHARGE TO I POND B1 \ I CUT CLOPE KINGS CREEK - PHASE-213 Z - �� (AREA=13.4 AC.) I L --- `MISC. WASTE TEMP SEDIMENT TEMP SEDIMENT i l I �� ��STORAGE POND B2 POND B3 I I — _ ---- �� 1 `� i I TOE OF - v �----- II POND OUTLET PIPE SLOPE �- DISCHARGE TO --- I TOP OF KINGS CREEK KINGS CREEK ---J CUT CLOPE __ I TOE OF SLOPE — — -- POND-CO2 - _ - I -- - POND OUTLET PIPE - i POND OUTLET PIPE - _,[-DISCHARGE TO DISCHARGE TO WATER STORAGE EXISTING GROUND J EXISTING GROUND BASIN (WSB-1) SEE ENLARGED DRAWING NUMBER (H371132-5200-222-270-0002) FOR - N CONSTRUCTION STORMWATER MANAGEMENT 1 PLAN FOR DUKE'S SUBSTATION PAD GALILEE CHURCH I ROAD OVERALL SITE DRAINAGE PLAN � �YORK ROAD P -------------- SCALE: 1"=400'-0" HATCH ___ -- ___ ALBEMARLETM KINGS MOUNTAIN DRAFTSPERSON E. MOPENO NR 03 28 24 -- C 0 R P 0 R A T 1 0 N 348 HOLIDAY INN DRIVE DESIGNER E. MOPENO NR 03 28 24 --- KINGS MOUNTAIN, NC 28286 Q CHECKER S. ALUGUVELU t,g—eua,,sr 024-07-12 This drawing is the confidential property of Albemarle Corporation and is issued with the express understanding and agreement that it DESIGN COORD. T. KAISER Kaiser, -r�,� 024-07-12 --- is not to be copied or reproduced,or used in any way detrimental to the interest of Albemarle Corporation and is to be returned on request. ISSUED F 0 R PERMITTING RESP. ENG. S ALuGUVE2u '^^� sr ' 024-07.12 --- __= MINING AND CONCENTRATOR FACILITY LEAD DISC. ENG. S. ALUGUVE221 �'" `"dat'"'s " - ___ MINE SELECT PHASE ENG. MANAGER PRO J. MANAGER K. YOUNG C 024-07-12 PHASE 2 CONSTRUCTION STORMWATER PLAN NOT FOR CONSTRUCTION . ISSUED FOR PERMITTING ELM SRA TPK 07/11/24 ROLE NAME SIGNATURE DATE B ISSUED FOR PERMITTING ELM SRA TPK 04/03/24 JOB NO. DRAFTER: DRAWING NO. KM61-Cl-GA-00106 SHT. 1 of 1 REVISION R INTERNAL&CLIENT REVIEW KM22040 E. MORENO HATCH DRAWING NUMBER: H371132-4000-222-270-0004 A --- ELM SRA TPK 03/29/24 SCALE- DATE FIGURE 13 C REV# DESCRIPTION CADD CHK'D APPR'D DATE AS NOTED 03/28/24