Loading...
HomeMy WebLinkAboutFigure 12 Phase 1 Construction Stormwater Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TCF LEGEND: (TYP.) S. BATTLEGROUND AVE. PERIMETER RIP-RAP � i� -�- PROPOSED TOE OF FILL SLOPE A CHANNEL (TYP.) �% i� � ��� _ PROPOSED TOP OF CUT SLOPE FLOW PATH POND OUTLET PIPE PHASE 3B � 11111017DISCHARGE TO — DEVELOPMENT PHASE BOUNDAR EXISTING GROUND ' LIMITS OF DISTURBANCE \ \\ OVERBURDEN �\ \ POND OUTLET PIPE (COD) \ STOCKPILE ��A DISCHARGE TO FACILITY EXISTING CULVERT PHASE-3A �� (OSF-1) �\ \� - _ (AREA=63 AC.) i GROWTH MEDIA ---- J I I111 STOCKPILE ROCK CONSTRUCTION t ENTRANCE & EXIT SEDIMENT (PRACTICE 6.06) 10 POND 3A t�l i i i RECB EROSION CONTROL BLANKET (PRACTICE 6.17) SUPER SILT FENCE/COMPOST TCF ,��� - ®� , /� \ - SEDIMENT FILTER SOCK (CFS) (TYP.) i� PROPOSED 18 \ PROPOSED 18" / I_ �' POND 3B (PRACTICE 6.66.6.62) CULVERT, - � f' CULVERT OSF SEDIMENT 1 CFS/ POND OUTLET PIPE SEDIMENT BASIN WITH SKIMMER POND 1 (TYP.) �i� _� \\ DISCHARGE TO (PRACTICE 6.61) i ---_ r^ l \ EXISTING GROUND NOTE: STORMWATER ENTERING THE _________ \\ RIPRAP LINED CHANNEL PROPOSED 18" OPEN PIT IS DISCHARGED VIA (PRACTICE 6.21) CULVERT PUMPS AS PER NPDES PERMIT I OUTLET PROTECTION LEVEL tit PERIMETER RIP-RAP �� OVERBURDEN � SPREADER (PRACTICE 6.4) STOCKPILE t CHANNEL TYP. ✓�i ( 1� FACILITY (OSF-2) I --------- DIVERSION BERM 1 / SOUTH / \ - 1 / CREEK CFS S ) DRAINAGE AREA f �P PIT PUMP AND PIPING E r i i� ��� �� t t CONTRIBUTING TO CULVERT t t 24-INCH CULVERT TEMPORARY CONSTRUCTION / DISCHARGE (5.7 ACRES) FENCE (TCF) it / it RS� / ,.' i/ �i � \\�� \®\\�� II 0 CULVERT DRAIN RSF-A i !� i ���� �\��` j INSTALL 24" PERMANENT OUTFACE SRK ROAD STORMWATER �� li .��� I I CULVERT F COLLECTION / I TEMPORARY OUTFACE CHANNEL DITCH vv v SOUTH CREEK / i i/i i RSF-X \ //� STORMWATER \ ��� , SEDIMENT ------- POND DITCH % A\ TIN MINE ROAD �� ��� // �� �1 "Y // G / / I ���, ., A - _ ., RSF-X '� - POND OUTLET PIPE `� II DISCHARGE TO ; KINGS CREEK EXISTING STORM DRAINAGE FEATURE J �� (TYP.) TECH CENTER H SEDIMENT POND WRC-61 � / l� / , O/ RECB - PROPOSED 24 CULVERT \ � �_ �� --- _� �� _ — ------ ---_------------------ C)---- (/ _ I I SEDIMENT II SOUTH CREEK PHASE 1A I POND Al SEDIMENT SEDIMENT RESERVOIR ap I POND A5 �\ HOLIDAY INN DRIVE I PERIMETER RIP-RAP _ wPOND ISEDIMENT PHASE-1 C CHANNEL (TYP.) WRC-51 POND OUTLET PIPE DISCHARGE SEDIMENT POND A2 �_ PHASE-1 B f (AREA=21 AC.) ■ - = . .) SEDIMENT OVERBURDEN STOCKPILE OSF SEDIMENT TO SOUTH CREEK ---- -------- AREA275 AC � POND A3 ( I POND A4 --___- I --- ----------- - POND 3 POND OUTLET PIPE DISCHARGE _ __ __ __ _ _�— FACILITY OSF-3 TO SOUTH CREEK POND OUTLET PIPE POND-M1 1 RECB =_- - RECB __________________ ___ __ ___________________________ --- --------i ---- ---- ------------ DISCHARGE TO KINGS CREEK �T,P ) �T,P ) I-85 - ------ -------I L--- _ _ _ _ _ _ K KINGS CREEK PO INDUSTRIAL DRIVE I I I _ — — PHASE-2A I POND OUTLET PIPE SEDIMENT PHASE-2B (AREA=38.5 AC.) DISCHARGE TO I POND 131 (AREA=13.4 AC.) \\\ Z_ KINGS CREEK v �� L SEDIMENT SEDIMENT/r' I I MISC. WASTE ��_ ` ��\ POND B2 POND B3 l STORAGE _- — — --- TOE OF _ _ --------------------- POND OUTLET PIPE �___ I SLOPE DISCHARGE TO I - ` I -=----------------- - I KINGS CREEK KINGS CREEK - �— _ POND-0O2 l _ M POND OUTLET PIPE - _ _ POND OUTLET PIPE DISCHARGE TO -- i WATER STORAGE I - - — DISCHARGE TO J EXISTING GROUND i EXISTING GROUND BASIN (WSB-1) = / I _ SEE ENLARGED DRAWING NUMBER N (H371132-5200-222-270-0002) FOR f/ CONSTRUCTION STORMWATER MANAGEMENT L� -- PLAN FOR DUKE'S SUBSTATION PAD / GALILEE CHURCH ROAD OVERALL SITE DRAINAGE PLAN SCALE: 1"=400'-O" ""�YORK ROAD P HATCH ___ -- ALBEMARLETM KINGS MOUNTAIN DRAFTSPERSON E. MORENO NR 03 18 24 C 0 R P 0 R A T 1 0 N 348 HOLIDAY INN DRIVE DESIGNER E. MORENO NR 03 1 8 24 KINGS MOUNTAIN, NC 28286 CHECKER S. ALUGUVELU AL,gjgv A,l,v,SVLAr^,� 2024-07-12 This drawing is the confidential property of Albemarle Corporation and is issued with the express understanding and agreement that it DESIGN COORD. T. KAISER T`' 2024-07-1 --- is not to be copied or reproduced,or used in any way detrimental to the interest of Albemarle Corporation and is to be returned on request. ISSUED F 0 R PERMITTING RESP. ENG. S. ALUGuvELu � SY 024.07.1 ___ __= MINING AND CONCENTRATOR FACILITY LEAD DISC. ENG. S. ALUGUVELLI Oyu ,S °" ___ MINE SELECT PHASE ENG. MANAGER N0 FOR R CONSTRUCTION PRO,J. MANAGER K. YOUNG - 7- ISSUED FOR PERMITTING PHASE 1 CONSTRUCTION STORMWATER PLAN T C ELM SRA TPK 07/11/24 C ROLE NAME SIGNATURE DATE B ISSUED FOR PERMITTING ELM SRA TPK 04/03/24 JOB NO. DRAFTER: DRAWING NO. KM61-Cl-GA-00105 SHT. 1 of 1 REVISION R INTERNAL&CLIENT REVIEW KM22040 E. MORENO HATCH DRAWING NUMBER: H371132-4000-222-270-0003 A ELM SRA TPK 03/29/24--- SCALE- DATE FIGURE 12 C REV# DESCRIPTION CADD CHK'D APPR'D DATE AS NOTED 03/18/24