HomeMy WebLinkAboutFigure 10 LifeOfMinePhase3Year9.4 �o O `day e�\ea P4� Shelby Project Location
Gastonia
Rd
� Ito Charlotte
North Carolina
93 o I` 1 7 South Carolina
Perimeter Pit Backslope Contours
Pond M71 Pit Backslope Boundary
h4rSfO Pt� �aoe� Dewatering 1 C,,=Permit Boundary
�ac9 Storage Y O NC Jurisdictional Waters 50 Foot Buffer
Heavy Electric r f } Property Charging Station P Y Setback
No Buffer
Lay down Area ,
l � Q i0 Proposed Walking Path
Perimeter Open Pit / \�C ®Undisturbed Enhanced Evergreen Buffer
Truck Maintenance Shop Pond M72 / ®Undisturbed Naturally Vegetated Property Buffer
Lube Storage Utility AreaRool Room 216 f 0 Q Undisturbed Planted Vegetated Buffer
W&F Shop Laydown Area
Q Vegetated Berm
Mine Change HouselCanteen Mine Design Feature
Mine Offices ( Growth
Warehouse + Media01
Open Pit Contour
® Storage yob a�0� /> r\,Overburden Storage Facility Contour
4 �o GS r\,j Rock Storage Facility Contour
1 �o fr
North Gate o00 } �1 d/0 (]Open Pit
N
�d P Security Offices Ready Line Wash Bay& ^oo \ �� I ❑Overburden Storage Facility
e Water Recir.Area oo ?? 1
`aG Fire Water Tanks ) o, -� I I II 1 Q Rock Storage Facility
&Pumps t� y Truck Fuel Station /�, Tech Center Gatel� I Mine Stockpile Area
Dominion Gast Collection Weighing yap \ Security�Office II
G Metering Station Pond M81 4if- ��
P,te 6 'm y 1 South Gate I -�Y —Run-of-Mine Pad
Tire Yard ♦..� � �Dewatering Storage
4 p ♦ Run-of-Mine Security Office oJOa Q� ' �^ r ♦ o Growth Media Storage
Water Truck I♦ - Pad ��/� Laydown Area
Build sLoadout Fill Area Note$ - -
Q�w s � OverbUrden -Primary � Infrastructure
1�mm Buildings I Crusher;
0 Misc.Waste Storage ! I , I ter- Fence Line
Storage Facility-2 1 �� I ♦ ,t —Pipe Line
O4erburden 0 Be Pond'b �` Collections I I Processing Features and Infrastructure
yt I `PIan4Feed I
d Storage loon f gp0 0100 G`¢¢�F Pon M12 85 Stockpile Area II- 161 —Proposed 44kV Route —
9if y
Facllit / / I I d Existing Building
>y— 9ao 062 ®Convey°r �c Laydown s
South Creek � �,// Secondary � I +Proposed Building
c SedPond:62.�. Arch Culvert Rail'Car,Fuelin'g Stan / j Crusher Collection
0 76 O l 063� ��&Infra'Storage ProTertiary PondCO3 / I Proposed Dam E
o / —� ° I Transportation
x YSed Pond 63 � � Crusher Tooling� 0 ♦ rusher C —
// Area&Wo I Flotation
p ♦ Existing Road
p 1�r� Sorting I`\ o Building ., e
ConcentrNotr3ruck\ I Building Rea9e\ Riprap Diffuser Railroad
Load-Oui`Buildiri'g I Irk Storage �� RrockfCheckdam
Rock=Stora e
IV f`♦ r �Haul Road
�F�� og Concentrator- y Electricals Electrical Building 9 Site Road o
acilit l.X Load-OufBins Natural Gas Building
\ oy /, i Metering Station Concentrator Gate/Security Office Hydrology
°� Collection Pond M11
O� � r or I Future DMS Building Collection g • Outlet Location a
o hond't101 DMS Building a
P pb g —Conduits and Culverts
Wa se n Filtration Building 2-Drainage m
Rock-Storage �¢
Raw Compressor Building 2,Named Flowline e
Faclli4 JAIL III < WaterPum
SQh Iv.fit pl �I I 003 P I ConcentratorOffcel Pond x
00/ �� t iii Ill Laydownl Q CariteenlChan a House Water Storage Basin 1
,F St 1140J J ,, d II �t �. Water•Storage I g d g
J WRC Pond 51 m� Concentrator Water
Collection PondCO2 �� Basin 1� Treatment Plant NOteS:
Note 1:Permit Boundary updated by ERM on September 3 2024. x
Dam �� Note 2:Mine phases were provided by SRK on April 19 2024.
005 t Note 3:Area excluded from the ermit boundary,existing
4�/ 9so 064 II y �Embbaankment ,♦ facilities are not related to mining activity in North Carol a.
be on 64
WRC Pond 61 � II ♦' N�
Over
aged I } +/1 0 0.2 0.4 12
�"I
`�F.acility 3 II ,� J+ l Miles
-o
o° ♦ /J ¢�� /( 1 inch = 0.2 mile when printed at 11"x17"
III Gene Rd a z
cdg� Figure 10
Sequence Map: End of Operationso
g
(End of Mining Year 9.4) LOM Ph 3
Kings Mountain Lithium Mine
Albemarle
Kings Mountain ��` Q
o ea City Cleveland County, 1zo
o a0e Lake o North Carolina g