Loading...
HomeMy WebLinkAboutFigure 10 LifeOfMinePhase3Year9.4 �o O `day e�\ea P4� Shelby Project Location Gastonia Rd � Ito Charlotte North Carolina 93 o I` 1 7 South Carolina Perimeter Pit Backslope Contours Pond M71 Pit Backslope Boundary h4rSfO Pt� �aoe� Dewatering 1 C,,=Permit Boundary �ac9 Storage Y O NC Jurisdictional Waters 50 Foot Buffer Heavy Electric r f } Property Charging Station P Y Setback No Buffer Lay down Area , l � Q i0 Proposed Walking Path Perimeter Open Pit / \�C ®Undisturbed Enhanced Evergreen Buffer Truck Maintenance Shop Pond M72 / ®Undisturbed Naturally Vegetated Property Buffer Lube Storage Utility AreaRool Room 216 f 0 Q Undisturbed Planted Vegetated Buffer W&F Shop Laydown Area Q Vegetated Berm Mine Change HouselCanteen Mine Design Feature Mine Offices ( Growth Warehouse + Media01 Open Pit Contour ® Storage yob a�0� /> r\,Overburden Storage Facility Contour 4 �o GS r\,j Rock Storage Facility Contour 1 �o fr North Gate o00 } �1 d/0 (]Open Pit N �d P Security Offices Ready Line Wash Bay& ^oo \ �� I ❑Overburden Storage Facility e Water Recir.Area oo ?? 1 `aG Fire Water Tanks ) o, -� I I II 1 Q Rock Storage Facility &Pumps t� y Truck Fuel Station /�, Tech Center Gatel� I Mine Stockpile Area Dominion Gast Collection Weighing yap \ Security�Office II G Metering Station Pond M81 4if- �� P,te 6 'm y 1 South Gate I -�Y —Run-of-Mine Pad Tire Yard ♦..� � �Dewatering Storage 4 p ♦ Run-of-Mine Security Office oJOa Q� ' �^ r ♦ o Growth Media Storage Water Truck I♦ - Pad ��/� Laydown Area Build sLoadout Fill Area Note$ - - Q�w s � OverbUrden -Primary � Infrastructure 1�mm Buildings I Crusher; 0 Misc.Waste Storage ! I , I ter- Fence Line Storage Facility-2 1 �� I ♦ ,t —Pipe Line O4erburden 0 Be Pond'b �` Collections I I Processing Features and Infrastructure yt I `PIan4Feed I d Storage loon f gp0 0100 G`¢¢�F Pon M12 85 Stockpile Area II- 161 —Proposed 44kV Route — 9if y Facllit / / I I d Existing Building >y— 9ao 062 ®Convey°r �c Laydown s South Creek � �,// Secondary � I +Proposed Building c SedPond:62.�. Arch Culvert Rail'Car,Fuelin'g Stan / j Crusher Collection 0 76 O l 063� ��&Infra'Storage ProTertiary PondCO3 / I Proposed Dam E o / —� ° I Transportation x YSed Pond 63 � � Crusher Tooling� 0 ♦ rusher C — // Area&Wo I Flotation p ♦ Existing Road p 1�r� Sorting I`\ o Building ., e ConcentrNotr3ruck\ I Building Rea9e\ Riprap Diffuser Railroad Load-Oui`Buildiri'g I Irk Storage �� RrockfCheckdam Rock=Stora e IV f`♦ r �Haul Road �F�� og Concentrator- y Electricals Electrical Building 9 Site Road o acilit l.X Load-OufBins Natural Gas Building \ oy /, i Metering Station Concentrator Gate/Security Office Hydrology °� Collection Pond M11 O� � r or I Future DMS Building Collection g • Outlet Location a o hond't101 DMS Building a P pb g —Conduits and Culverts Wa se n Filtration Building 2-Drainage m Rock-Storage �¢ Raw Compressor Building 2,Named Flowline e Faclli4 JAIL III < WaterPum SQh Iv.fit pl �I I 003 P I ConcentratorOffcel Pond x 00/ �� t iii Ill Laydownl Q CariteenlChan a House Water Storage Basin 1 ,F St 1140J J ,, d II �t �. Water•Storage I g d g J WRC Pond 51 m� Concentrator Water Collection PondCO2 �� Basin 1� Treatment Plant NOteS: Note 1:Permit Boundary updated by ERM on September 3 2024. x Dam �� Note 2:Mine phases were provided by SRK on April 19 2024. 005 t Note 3:Area excluded from the ermit boundary,existing 4�/ 9so 064 II y �Embbaankment ,♦ facilities are not related to mining activity in North Carol a. be on 64 WRC Pond 61 � II ♦' N� Over aged I } +/1 0 0.2 0.4 12 �"I `�F.acility 3 II ,� J+ l Miles -o o° ♦ /J ¢�� /( 1 inch = 0.2 mile when printed at 11"x17" III Gene Rd a z cdg� Figure 10 Sequence Map: End of Operationso g (End of Mining Year 9.4) LOM Ph 3 Kings Mountain Lithium Mine Albemarle Kings Mountain ��` Q o ea City Cleveland County, 1zo o a0e Lake o North Carolina g