HomeMy WebLinkAboutNCG021046_Erosion & Sediment Control Plan_20240923 Erosion and Sediment Control Plan
Addendum 2. 1
Kings Mountain Mining Project
Report Date: June 25, 2024
Report Prepared for
A ALBEMARLE'
Albemarle Corporation
4250 Congress Street
Charlotte, NC 28209
Report Prepared by
=%*opff srk consulting
SRK Consulting (U.S.), Inc.
999 171h Street, Suite 400
Denver, CO 80202
SRK Project Number: USPR000576
Albemarle Document Number: KM60-EN-RP-9052
North Carolina Firm License Number: C-5030
Author:
David Hoekstra, BS, PE, NCEES, SME-RM, Principal Consultant
Reviewed by:
Gary Hurban, M.S., PE, Principal Consultant
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page ii
Table of Contents
1 Project Description...................................................................................................... 1
1.1 Site Description...................................................................................................................................1
1.2 Property History ..................................................................................................................................3
1.3 Project Overview.................................................................................................................................3
1.3.1 Adjacent Properties.................................................................................................................4
1.3.2 Existing Drainage System.......................................................................................................6
1.4 Soils 6
MapUnit Legend ............................................................................................................... 8
2 Site Development Plan ................................................................................................ 9
3 Construction Schedule.............................................................................................. 11
4 Planned Erosion and Sedimentation Control Practices ......................................... 12
4.1 Permanent Development and Operational Stage Practices.............................................................12
4.1.1 Permanent Sediment Control Ponds.....................................................................................12
4.1.2 Sediment Control Pond 1 (Skimmer Sediment Basin-Practice 6.64)....................................13
4.1.3 Sediment Control Ponds 62 and 63 (Skimmer Sediment Basin-Practice 6.64)....................13
4.1.4 Sediment Control Pond 64 (Skimmer Sediment Basin-Practice 6.64)..................................13
4.1.5 Permanent Grass-Lined Channels (Practice 6.21 and Practice 6.30)..................................13
4.1.6 Permanent Riprap-Lined Channels (Practice 6.21 and Practice 6.31).................................13
4.1.7 Permanent Outlet Protection Level Spreader (Practice 6.40)...............................................14
4.1.8 Operational Dust Control (Practice 6.84)..............................................................................14
4.1.9 Permanent Revegetation Practices.......................................................................................14
4.1.10 Closure Surface Grading (Practice 6.02)..............................................................................14
4.1.11 Closure Surface Topsoiling, Roughening, and Revegetation (Practices 6.04, 6.03, and 6.11)
14
5 Maintenance Plan....................................................................................................... 15
6 Detail Drawings and Specifications for Practices Specified.................................. 16
7 Vegetation Plan.......................................................................................................... 17
8 Supporting Calculations............................................................................................ 18
9 Financial Responsibility/Ownership Form......................Error! Bookmark not defined.
10 Checklist............................................................................Error! Bookmark not defined.
11 References.................................................................................................................. 19
Disclaimer........................................................................................................................ 20
Copyright ......................................................................................................................... 20
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page iii
List of Tables
Table 4.1: Summary of Sediment Ponds Characteristics.................................................................................13
Table 7.1: Preliminary Seed Mix Composition and Schedule ..........................................................................17
List of Figures
Figure1-1: Location Map....................................................................................................................................2
Figure 1-2: Stream Network and Adjacent Properties........................................................................................5
Figure1-3: Soil Survey Map...............................................................................................................................7
Figure 1-4: Soil Survey Map Legend..................................................................................................................8
Figure2-1: Site Location Map ..........................................................................................................................10
Figure 6-1: Skimmer and Riser Sediment Basin with Permanent Wet Pond .... Error! Bookmark not defined.
Figure 6-2: Section through Sediment Pond 1 .................................................. Error! Bookmark not defined.
Figure 6-3: Section through Sediment Pond 62 ................................................ Error! Bookmark not defined.
Figure 6-4: Section through Sediment Pond 63 ................................................ Error! Bookmark not defined.
Figure 6-5: Section through Sediment Pond 64 ................................................ Error! Bookmark not defined.
Figure 6-6: Typical Riprap Channel Cross Section ........................................... Error! Bookmark not defined.
Figure 6-7: Outlet Stabilization Structure........................................................... Error! Bookmark not defined.
Appendices
Appendix E-1A: Runoff Estimation for the Kings Mountain Mining Project
Appendix El-B: Channel Design for the Kings Mountain Mining Project
Appendix El-C: Sediment Pond Designs
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page iv
List of Abbreviations
The US System for weights and units has been used throughout this report. Tons are reported in short
tons of 2,000 lbs. All currency is in U.S. dollars (US$) unless otherwise stated.
Abbreviation Unit or Term
AOI area of interest
° degree(degrees)
dia. diameter
ECP erosion and sediment control plan
ft foot feet
ft2 square foot feet
ft3 cubic foot feet
al gallon
m gallons per minute
HAV horizontal to 1 vertical
HDPE high density of eth lene
lb pound
LI li ht industrial
LoM life-of-mine
MSHA Mine Safety and Health Administration
PAG potentially acid generating
% percent
PFS prefeasibility stud
PMP probable maximum precipitation
PMF probable maximum flood
RoM run-of-mine
sec second
sed pond Sedimentation Pond
SG specific gravity
SR suburban residential
t/d tons per day
t/Y tons per year
Tailings finely ground waste rock from which valuable minerals or metals
have been extracted.
TSF tailings storage facility
TSP total sus ended particulates
m micron or microns
WSB water storage basin
year
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 1
1 Project Description
The Kings Mountain Mining Project(the Project) is a legacy open pit lithium mining operation located
in the city of Kings Mountain, North Carolina, in the southeastern United States.The Project is a lithium
pegmatite deposit being investigated for redevelopment by Albemarle Corporation (Albemarle)as part
of a prefeasibility-level analysis. Albemarle commissioned SRK Consulting (U.S.), Inc. (SRK) to
develop prefeasibility-level (evaluate and Select phases, per Albemarle's internal conventions)
designs for an expansion of the existing pit, waste rock management, water management, and
ancillary infrastructure to aid Albemarle in making informed decisions concerning advancement of the
Project.
As part of this study, SRK is developing a prefeasibility study surface water design of stormwater
management controls to divert clean, non-contact water around the facilities. At the same time, the
design intercepts waters that have encountered mining activities and routes them to monitoring or
treatment facilities prior to discharge into the existing natural drainage system.
The Surface Water Management Plan (SWMP) for the project is expected to be a living document,
and as such will include occasional addendums to address modifications to the SWMP that do not
warrant a complete revision of the original SWMP. The current SWMP for the project is Version 2.0
and this document is Addendum 2.1, representing the first addendum to SWMP Version 2.0.
1.1 Site Description
Situated in Cleveland County, the mine is approximately 35 miles west of Charlotte, North Carolina.
Located amidst rolling hills of the Piedmont Plateau, the Project is in a rural setting within the city of
Kings Mountain. The mine site covers a significant area of land, which includes both the proposed
extraction areas and associated processing infrastructure. Figure 1.1 shows the location of the mine.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 2
a�
main �f.ce4 p.r -----,
rr � BeaaemerGlCy `_------______..,_
Yanlitle
1
h.
A� ti� 91ue Riuge 7-0
ti Pa kNMy
Rntlt.y, �
S� f
Oak Grove Gr6}r9 hi.
Sk Ly cunl:ain vlow
�� Ifings hAountairi
' I
Cmeyders
MlriFs���� I Mountain Sieie
Kings • Park y f
Mountain
A,cr,UlIE Project
5rd[eWllie
� Idr4ry
•hniilc L� South
Mountains
State Park Mavresville
North Carolina
t
f ~
r
Gasmnia
ChdfiQCte
4
17Ay
0Spartar burg 1000�'
O M1+#}
GreerwIlle
South Carolina
371
Source:Environmental Systems Research Institute,Inc.(ESRI),2023(modified by SRK)
Figure 1-1: Location Map
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 3
1.2 Property History
The following summary highlights the history of the site, compiled from records available to SRK:
• Mining started in 1883 with the discovery of cassiterite, a tin-bearing mineral, within the
outcropping pegmatites.
• Subsequently, open pit mining for tin occurred sporadically between 1903 and 1937 (Horton
and Butler, 1988).
• Between 1943 and 1945, under the sponsorship of the U.S. government, Solvay established
a processing plant and mined for spodumene from the outcropping pegmatites(Garrett,2004).
• In the early 1950s, Foote Mineral Company (Foote), a subsidiary of Newmont Mining
Corporation, purchased the property and began open pit mining (assumed at the beginning of
1955) and extracting lithium from the spodumene.
• In 1993, exploration and mining operations ceased when the open pit bottom reached
approximately 660 feet(ft) above mean sea level (amsl).
• In early 1994, an open pit lake started to form due to rebounding groundwater, and the pit lake
reached an elevation of 818.67 ft amsl (as of November 2023).
• During the groundwater recovery period (1994 to present), water was sporadically pumped
from Kings Mountain pit lake to a nearby quarry (Martin Marietta)to support quarry operation.
• Albemarle acquired the site in 2015, resuming exploration and mine development activities.
1.3 Project Overview
The Project ore deposit is a lithium-bearing rare-metal pegmatite intrusion that has penetrated along
the Kings Mountain shear zone, a regional structural feature known to host multiple lithium-bearing
pegmatites along its trend. The pegmatite field at Kings Mountain is approximately 1,500 ft wide at its
widest point in the legacy pit area and narrows to approximately 400 to 500 ft in width at its narrowest
point south of the legacy pit. The field has a lithium mineralization strike length of approximately
7,500 ft and is predominantly contained in the mineral spodumene. The spodumene pegmatite bodies
exhibit a texture-based variation in lithium grade, spodumene grain size, mineral alteration, and rock
hardness.
After dewatering the legacy pit, the lithium deposit is to be mined using conventional open pit mining
techniques. Overburden soils associated with pre-mining activities and foundation preparation will be
removed and stockpiled in the Overburden Stockpile Facilities (OSF). Blasting will fragment the ore
and waste rock where it will be loaded and hauled to either the processing facilities (ore) or the rock
storage facilities (RSF) (overburden). The current plan includes mining in the existing pit and
expanding the pit to the southwest. Ore will be drilled, blasted, loaded, and transported by haul truck
to a new processing plant at a rate of approximately 2.98 million tons per annum of ore (approximately
8,150 tons per day) and processed to produce 380 to 420 thousand tons per annum of spodumene
concentrate. The concentrate will be filtered to approximately 11 percent (%) moisture by weight and
transported off-site for further refinement into lithium hydroxide monohydrate at a separate facility.
Tailings from the spodumene concentrate process will be filtered to approximately 10% to 15%
moisture content by weight and transported off-site to a nearby facility for disposal. A portion of the
waste rock with economic value as aggregate will also be transported off-site for sale.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 4
1.3.1 Adjacent Properties
The natural drainage network near the Project is heavily influenced by legacy and active mining
activities. Land use in the area is a mix of suburban residential(SR)and light industrial (LI).The Project
area is bounded by Battleground Avenue to the north, Tin Mine Road to the west, Church and York
roads to the south and east, and Cardio Hill (a legacy RSF) to the northeast. Properties to the north
and east of the Project site are typically residential along Tin Mine Road and Battleground Avenue,
while the Martin Marietta Kings Mountain quarry bounds the Project area to the east and southeast.
The Project area is bisected by Interstate Highway 85 (185), passing northeast to southwest to the
property, with most Project construction activities occurring north of the highway. Commercial
properties are located south of 185 and north of Water Storage Basin (WSB)-1, a remnant from
previous mining activities. The southern edge of the property is bounded by York Road and Galilee
Church Road, with residential and commercial properties along these roads. South of Galilee Church
Road lies the Kings Mountain Number One Lake. Figure 1.2 shows these features.
MH/DH April 2024
. ..-
r
Kiwgsm,,'Iur-tain rt• .. - .; -
- - flayry
■ x
eV
U� -
�n
JS`J!7
��c9j�' i■ f .c +F i
• • a 5 ti� � '=f0
i111Y21aY'hZ��
MIB mom& @*
Ub
Q' k
o a M1
F
4.
e�q
Ra.
r O
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 6
1.3.2 Existing Drainage System
The Project areas include two major drainages: Kings Creek passing from the northeast to the
southwest of the Project and South Creek, which forms within the northwestern portion of the Project
area and joins with Kings Creek north of 185. The Project area includes a number of constructed water
bodies remaining from previous mining activities, including the Kings Mountain pit lake(a closed water
body in the legacy Kings Mountain open pit), the South Creek reservoir (a reservoir constructed
adjacent to the legacy mine tailings facility), and WSB-1 (a shallow water body formed by the remnants
of a legacy mine tailings facility).
South Creek flows along the west side of the Project area before entering the South Creek reservoir.
The spillway from the South Creek reservoir is two 32-inch-diameter culverts that discharge into a
rock-lined downchute that routes flow to the confluence with Kings Creek.
The closed depression formed by the existing tailings facility (also known as Foote Mineral Tailings
Pond) has no overland outlet, but increased groundwater contributions to South Creek are observed
in the vicinity of the tailing's embankment.
Kings Creek is intercepted upstream of the Project area by the Martin Marietta quarry, and most flow
in Kings Creek is the result of pumping from the existing Martin Marietta quarry (also known as Kings
Mountain Mica Company Lake) into Kings Creek. The pumping system was recently upgraded to
2,500 gallons per minute (gpm). Kings Creek passes to the south of the existing Kings Mountain pit in
a steep ravine and is routed under the Albemarle research building through an existing 4-ft-diameter
culvert. Downstream of the culvert, Kings Creek joins with the discharge from the South Creek
reservoir before crossing under 185 through three 7-ft x 10-ft concrete box culverts. Flowing to the
southwest, Kings Creek joins with the discharge from WSB-1 before flowing off the Project area to the
southwest.
There are numerous small ponds in the Project area; the most significant is Pond#1, centrally located,
which intercepts runoff from the area before intermittently discharging to Kings Creek. Figure 1.2
shows the stream network.
1.4 Soils
Soil mapping provided by the United States Department of Agriculture — Natural Resources
Conservation Service (USDA NRCS) (2023) indicates that the soil composition in the Kings Mountain
area is characterized by a mixture of loamy and clayey soils with varying degrees of organic matter
content, gravels, and sands. Figure 1.3 shows the soil unit mapping, with the map legend included as
Figure 1.4. Within the area of interest, the soil mapping indicates approximately 50% of the soil is
represented by two soil types: 24% of the area of interest (AO1) is the Madison-Bethlehem complex,
and 25% of the AO1 is the Uwharrie silt loam. Both the Madison and Uwharrie soils are classified as
Hydrologic Soil Group B, while the Bethlehem soil unit is Hydrologic Soil Group C.
MH/DH April 2024
�K ya adowtiroo'f ! ` _ � -4
v OS G� 'q` .) "9� r � eiy ,•S ,f �,
It I
73,
.Mb62 • '�Y k
tgd y.. UxB r, ` Y.
7;�r�3 ���B W Pw � �r - - .l _� �rowdgr$.G�eO
U.dC
�. . C Mb62 � 5... ` �•"
mtc• f
c+rr McC2 Y f vG
MbB2�'
f �aa GrQ� - i4l TaQ UTT`2
f ar
` 3 UdC MCC2 i.
v w• ,+
MnB ^1 UtB'
McC2 Z TaB H
ChA �
w � if
r. MbB2' Tao W ChA
F . MbB2
t7AM �
UtB
McC2 CaB2 Uvo ChA USG
�( TaC '-aB \
'LItB \ U 2
uB UwC2'
Tal]• U0 2AL • tm r TaDI
�• 'k. '4*. LwG UDC
� u �
A. R:
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template-Kings Mountain Page 8
MAP LEGEND MAP INFORMATION
Area of Ini1erest(AOI) Spoil Area The soil surveys that comprise your ADl were mapped at
0 Area at Interest(AOI) 1:24 X0.
� �°"'� ot Map Unit Legend
s01lsIM very Stony spot Please rely on the bar scale on each rnap sheet far map
0 Sail Map Unit Polygons measurements. Map Unit Map Unit Name Acreage in Percentage
r.o Sail Map Unit Lines Symbol
Cecil sandy clay loam,2%to 8%slopes,moderately
Wet Spot bol AOI(acres(ac)) of AOI
Other Source of Map: Natural Resources Conservation Service eroded 18.2 0.8
Sail Map Unit Points Web Soil Survey URL: ° °
/°
�. Special Line Features ChA Chewacla loam,0/°to 2 slopes,frequently flooded 37.2 1.7
Special Point Features Coordinate System: Web Mercator(EPSG:3657) DAM Dam 31.1 1.4-
VO
Blowout Yhrter Features GrD Grover gravelly sandy loam, 15%to 30%slopes,rocky 44.2 2.0
Borrow Pit Streams and Canals Maps from the Web Soil Survey are based on the Web Mercator HhB Hulett gravelly sandy loam,2%to 8%slopes 10.1 0.5
projection,which preserves direction and shape but distorts
Transportation HtC Hulett gravelly sandy loam,8%to 15%slopes,stony 28.6 1.3
X distance and area_A projection that preserves area,such as the
Clay SW Rails Albers equal-area conic projection,should be used if more Madison-Bethlehem complex,2%to 8%slopes,stony,
� P ] MbB2 179.0 8.2
'
Closed Depression accurate calculations of distance or area are required. moderate) eroded
Interstate Highways very Madison-Bethlehem complex,8%to 15%slopes,ve
McC2 100.9 4.6
Gravel pit US Rolfes stony,moderate) eroded
This product is generated from the USDA-MRCS certifies data a- Madison-Bethlehem-Urban land complex,2%to 8%
Gravelly Spat M3JOr Roads of the version date(s)listed below. MnB slopes 252.5 11.5
tyi Landfill MoE Montonia very channery silt loam,25%to 60%slopes, 1.8 0.1
Local toads
Soil SunreyArea: Cleveland County,North Carolina very stony
Lava Flow Background Survey Area Data. Version 26,Sep S, 2022 Pw Pits,quarry 105.7 4.8
Marsh or swamp Aerial Photography TaB Tatum-Montonia complex,2%to 8%slopes 19.4 0.9
Sail map snits are labeled(as space allows)for map scales TaC Tatum-Montonia complex,8%to 15%slopes 13.1 0.6
4* Mine or Ouarry 1:50,000 or larger_ TaD Tatum-Montonia complex, 15%to 30%slopes 55.2 2.5
Miscellaneous Water UdC Udorthents,loamy,0%to 15%slopes 652.7 29.7
Date(s)aerial images were photographed: Apr 22,2022-May UtB Uwharrie silt loam,2%to 8%slopes 120.9 5.5
0 Perennial Water 10, 2022 Uwharrie silty clay loam,2%to 8%slopes,moderately
UuB2 eroded 178.E 8.1
Rock Outcrop
The orthophoto or other base map on which the soil lines were UvC Uwharrie-Tatum complex,8%to 15%slopes 146.1 6.7
Saline Spot compiled and digitized probably differs from the background UwC2 Uwharrie-Tatum complex,8%to 15%slopes, 90.9 4.1
imagery displayed on these maps_As a result,some minor moderate) eroded
_'• sandy Spat shifting of map unit boundaries may be evident_ UxB Uwharrie-Urban land,2%to 8%slopes 9.8 0.4
Severely Eroded Spot W Water 99.4 4.5
Sinkhole Totals for Area of Interest 2,195.4 100.0
Slide or Slip
Sodic Spot
Source:USDA NRCS,2023
Figure 1-4: Soil Survey Map Legend
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 9
2 Site Development Plan
Figure 2.1 shows the Kings Mountain Lithium Mine site development plan and shows facilities
addressed in Version 2.0 SWMP (April 2024) and included in the associated Erosion control plan that
are expected to be constructed by the end of Mine Year 8.
The existing pit and pit lake are in the northeast corner of the site. The ultimate (Phase 1) open pit
outline is shown in the northeast area of the Project. Haul roads are shown connecting the pit to the
RSFs; RSF-X, located south-centrally for potentially acid generating(PAG)waste, and RSF-A, located
in the southwest for non-PAG (NAG) waste. All PAG waste will be re-mined and used as pit backfill
during reclamation and closure. The haul roads will also connect to the non-processing infrastructure
(NPI), located in the northwest portion of the site, and the ore sorting area and the ore stockpiles,
located on the east side of the Project just north of 185.
A bridge over 1-85 will connect the ore stockpile area to the processing area, located immediately south
of 1-85. WSB-1 will be constructed by restoring WSB-1 in the far southern portion of the Project area.
WSB-1 will collect all contact water produced within the Project area before being discharged from the
site.
Linear infrastructure, such as access roads, haul roads, railroads, pipelines, water management
ponds, and diversion channels, are located throughout the site, as needed. Facility expansion will
occur over the life-of-mine, but, where feasible, surface water features will be constructed to address
the final configuration.
This addendum Version 2.1 addresses the addition of three overburden stockpiles (OSF-1,2, and 3)
and their ancillary surface water management infrastructure. OSF-1 located north of RSF-A in a
watershed contributing to South Creek, OSF-2 immediately west of the Pit Haul Roads in a watershed
primarily contributing to Kings Creek, and OSF-3 located immediately south of RSF-A in a watershed
contributing to South Creek.
MH/DH April 2024
PERIMETER pJ�j
N POND71 CIA LEGEND
LAYARE OWN
56p- SEDIMENT FENCE
� 003 NCG02 DISCHARGE
PERIMETER �j POINT ID
POND 72
PROPERTY /
LINE
GROWTH MEDIA
STORAGE
LAYDOWN /
AREA
TRUCK MAINTENANCE
SHOP MINE PIT
WAREHOUSE-
I / -
r �
EXISTING ROM PAD
FACILITY/LABORATORY \J-
NATURAL GAS
LINE RE-ROUTE — ♦ ,� ����P o
READY LINE HAUL ROAD
o
,
�o
CONCENTRATE
\\ /
RAIL LOADOUT
1 81 EXISTING
( / \ PROCESS
/ BOOSTER PUMP FACILITY ki
,
OVERBURDEN STORAGE \
FACILITY 2 (OSF-2) \ SED POND 1 °�
,
OVERBURDEN � _ ® � / •���' STOCKPILE
STORAGE SEDIMENT
FACILITY 1 (OSF-1) � WETLAND AREA FENCE (TYP.) RAIL CAR 010�
SETBACK FUELING STATION
& INFRA STORAGE
�'I SOUTH CREEK
OSF-1 WATER CULVERT�� � _ ❑ CRUSHING FACILITIE
MANAGEMENT PONDS — \� _ /
063 a, /
163 MUD POND#2 V
- 10671 GRADE TO DRAIN KING S CREEK ��, �� • j�
62 162 J _ CONCENTRATE TRUCK O
SOUTH CREEK LOADING BUILDING
- f �
HAULROAD
i - _
/ FILL CHECKDAM
PROPOSED ROCK
066 , ROCK 0
STORAGE
FACILITY X
=:_CONCENTRATOR
-�
- � ' FACILITIES
,
v
p OF
/
'9\ ROCK rWRC POND 51
STORAGE G�-
FACILITY A / 101 003
151 - - WATER STORAGE
068 ��� /00, / BASIN 1 (CURRENT
102
OUTLINE)
WRC POND 61 161 �'"—' i EXISTING 230kV
164 POWERLINE ALIGNMENTOSF-3 WATER
�
` - MANAGEMENT POND WETLAND AREA 1 03 /
SETBACK
— � � PROPOSED WATER
� STORAGE
- -- EMBANKMENT
SEDIMENT _ VERBURDEN STORAGE FACILITY 3 (OSF-3)-
FENCE (TYP.) �� LAYDOW MAX WATER LEVEL
♦ YARD PIMP EVENT
�004 PROPOSED TOE (845 FT AMSL)
� BUTTRESS
/ I
230/24.9KV ELECTRICAL
PROPOSED SUBSTATION
SPILLWAY
REVISIONS DESIGN:EL/JO REVIEWED:DPH PREPARED BY: DRAWING TITLE: ISSUE:
REV. DESCRIPTION DATE DRAWN:EL APPROVED:JO SITE LOCATION MAP WITH TEMPORARY
0 ISSUED FOR PERMITTING 07/02/2024 Srk consultingDATE:
COORDINATE SYSTEM: SURFACE WATER MANAGEMENT AND
7/2/2024
NC83F PREPARED FOR: SEDIMENT CONTROL FEATURES SRK PROJECT NO.: REVISION:
PROJECT: USPR576.800 0
0 250 500 1000 KINGS MOUNTAIN
MINING PROJECT DRAWING NO.
FEET IF THE ABOVE BAR .1 ALBEMARLE KINGS MOUNTAIN MINING PROJECT
Operated by:
DOES NOT MEASURE 1 INCH, FIGURE 2. 1Albemarle-Lithium
FILE NAME: Site Map_Rev 8_Silt Fencing_Linked.dwg
THE DRAWING SCALE IS ALTERED
C:\Users\elynn\SRK Consulting\NA USPR000576 Albemarle Corporation Kings Mountain 2022 Pre Feasibility Study-GIS\04 CAD\20240619_Simplified SiteMap\Site Map_Rev 8—Silt Fencing_Linked.dwg
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 11
3 Construction Schedule
Construction at the Project will be significant and are still in the feasibility stage when this ECP was
developed. The individual stages of the Project are described in the Kings Mountain surface water
management plan version 2.0 at the time this document was prepared (SWMP) (SRK, 2024) and are
summarized below:
• Stage A: Early Works and Pre-Development: Construction activities that are planned prior to
the start of mine development
• Stage B: Development: Construction activities that are planned during mining but prior to
lithium production
• Stage C: Mining: phased development of the pit that will take place during active mining
• Stage D: Closure: closure activities that will commence upon the completion of lithium
production
Individual ECPs for the various facilities of the mine have or will be provided as the necessary
information is developed. This document addresses the ECP for the construction of the OSFs during
Stage B, which will be required prior to the development of the RSFs and subsequent mine
development.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 12
4 Planned Erosion and Sedimentation Control
Practices
Sediment and erosion control practices will be implemented at the site for OSFs as they are developed
during Stage B of the Project. The sediment and erosion control features, including the non-contact
discharge structures around the OSFs will be permanent and will remain after the Project enters the
post-closure phase. Other features, such as the sediment control basins and outlet works associated
with discharges from the OSFs,will be in use during the operational period of the mine, approximately
10 years when the development stage is included. Permanent and operational features of the ECP for
the OSFs will be implemented as they are constructed during the development phases of the Project
and are described in detail below. Additional temporary practices are recommended for the individual
components as necessary during their initial construction until vegetation has been established.
• Removal and stockpiling of growth media within the footprint of the OSFs and associated
infrastructure
• Installation of silt fences at the toe of any fill slope until vegetation has been established
• Stabilization and revegetation of the slopes and grading associated with native ground
• Temporary sediment controls at the outlet of the sediment ponds until the outlet structures are
completed
Specific practices numbers identified in the erosion and sediment control practices reference the North
Carolina Erosion and Sediment Control Planning and Design Manual (NCCCC) (2013), Chapter 6,
Practice Standards and Specifications.
4.1 Permanent Development and Operational Stage Practices
During the development stage of the Project, surface water management structures will be developed
to control flows and sediment during the life of the Project (operational) or during operations and
through the post-closure (permanent). These controls are shown in the surface water features
drawings include with version 2.1 of the SWMP that this document is supporting. Temporary controls
will be removed or reconfigured once they have been supplanted by the operational or permanent
surface water controls. Figure 2-1 above shows silt fence locations recommended for temporary
sediment control practices required until more permanent controls are implemented. Appendix E-1A
includes supporting calculations for the erosion control measures.
Discharge from the OSF facilities will be controlled through the release of impacted water at designated
points only as much as possible. Those designated points are labeled on Figure 2-1 for the OSFs
discharges presented in this Addendum, as well for the other discharges associated with the Kings
Mountain Project.
4.1.1 Permanent Sediment Control Ponds
Permanent sediment basins are designed to serve areas larger than 5 ac and remain in function for
longer than 1 year. Three permanent sediment ponds (Sediment Ponds 62, 63, and 64) are required
for the development of the OSFs during the Project. The Sediment Ponds will receive non-contact
water from the disturbed and undisturbed natural soils and runoff from the overburden material both
prior to and after the surfaces being revegetated after placement. Non-contact runoff collected by these
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 13
channels will be diverted around the OSFs into the sediment ponds prior to release the waters into the
existing South Creek as it passes through the Project area.
Table 4.1: Summary of Sediment Ponds Characteristics
Storage (cubic Design Surface Skimmer
Name Contributing Disturbed feet ft3 x 1,000 Area(square Depth Size
Area(ac) Area(%) Required Design feet(ft2)x (ft) (Float/
1,000 Orifice
Sed_Pond 1
(described in 112 90% 181.4 417 52.5 11 8"/6.5"
SWMP V2.0
Sed_Pond_62 9.3 13% 16.7 20.4 20.7 4 3"/3"
Sed_Pond_63 30.6 27% 55.1 57.0 22.6 6 6"/5"
Sed_Pond_64 13.3 54% 23.9 24.8 13.4 4 6"/3.5"
Source:SRK,2024
4.1.2 Sediment Control Pond 1 (Skimmer Sediment Basin-Practice 6.64)
Sediment Pond 1 will be constructed as a skimmer sediment basin at the downstream portion of the
non-contact water channel system to manage flows from the pit perimeters, haul roads, NPI areas and
OSF-2. All runoff from the OSF-2 associated with Addendum 2.1 will be conveyed to Sediment Pond
1 before being released into Kings Creek. The primary outlet for Sediment Pond 1 will be a Floating
skimmer with an emergency outlet culvert as shown in Detail X of Figure XX.
4.1.3 Sediment Control Ponds 62 and 63 (Skimmer Sediment Basin-Practice 6.64)
Sediment Ponds 62 and 63 will be constructed as skimmer sediment basins at the downstream portion
of the non-contact water channel system associated with OSF-1.All runoff from the OSF-1 associated
with Addendum 2.1 will be conveyed to either Sediment Pond 62 or Sediment Pond 63 before being
released into an unnamed tributary of South Creek. The primary outlet for Sediment Ponds 62 and 63
will be Floating skimmers with an emergency overflow weir.
4.1.4 Sediment Control Pond 64 (Skimmer Sediment Basin-Practice 6.64)
Sediment Pond 64will be constructed as a skimmer sediment basin at the downstream portion of the
non-contact water channel system associated with OSF-3. All runoff from the OSF-1 associated with
Addendum 2.1 will be conveyed to Sediment Pond 64 before being released into an unnamed tributary
of South Creek.The primary outlet for Sediment Pond 64 will be Floating skimmers with an emergency
overflow weir.
4.1.5 Permanent Grass-Lined Channels (Practice 6.21 and Practice 6.30)
Permanent non-contact diversions channels will be constructed to route non-contact flow through the
Project area, as shown on Figure 4.1. Where calculations indicate that grass-lined channels will have
adequate erosion resistance, these channels will be stabilized and revegetated as part of the channel
construction.
4.1.6 Permanent Riprap-Lined Channels (Practice 6.21 and Practice 6.31)
Permanent non-contact diversions channels will be constructed to route non-contact flow through the
Project area, as shown on Figure 4.1. Where calculations indicate that riprap-lined channels will be
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 14
required to provide adequate erosion resistance, these channels will be constructed with riprap
channel armoring. Emergency overflow spillway weirs will be designed as permanent riprap channels.
4.1.7 Permanent Outlet Protection Level Spreader (Practice 6.40)
Permanent pond Sediment Ponds will discharge into either South or Kings Creek using a skimmer as
well as an emergency spillway. The outlet pipe from the skimmer and the discharge from the
emergency spillway will use a riprap apron leading to a level spreader at the discharge point into the
downstream drainage to minimize erosion.
4.1.8 Operational Dust Control (Practice 6.84)
Haul traffic on dirt roads between the mine facilities will be ongoing during the mine development,
operations, and closure activities and will require regular application of water for dust control. Dust
control water will be supplied by the pit dewatering forcemain prior to discharging into WSB-1 or directly
from WSB-1 if needed. Air monitoring will be implemented at the site to evaluate the effectiveness of
the dust control and adjust sprinkling application rates as necessary to meet Mine Safety and Health
Administration (MSHA) guidelines.
4.1.9 Permanent Revegetation Practices
During development, the OSFs will be graded to final surface configuration. When placement is
complete, the surfaces will be revegetated as described below:
4.1.10 Closure Surface Grading (Practice 6.02)
Final OSF surfaces will be constructed at an overall slope of 3H:1V.
4.1.11 Closure Surface Topsoiling, Roughening, and Revegetation (Practices 6.04,
6.03, and 6.11)
OSF Surfaces that will remain at closure will consist of overburden soils and are not anticipated to
require the addition of growth media.The surfaces will be roughened prior to permanent seeding using
a vegetation plan developed and validated for the mine.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 15
5 Maintenance Plan
Regular maintenance practices are important to prevent adverse negative impacts to the environment.
Routine inspections of all sediment control facilities will be conducted at least once per week and after
every rainfall event that results in observable runoff. An inspection report template will be prepared.
Based on the observations, the following activities will be conducted.
• Sediment ponds:
o All erosion and sediment control measures, including sediment ponds, seepage ponds,
check dams, silt curtains will be checked for stability and operation. Any needed repairs
or adjustments will be implemented immediately.
o The three permanent sediment basins associated with the OSF ECP: Sediment Pond 62,
Sediment Pond 63 and and Sediment Pond 64 will be cleaned out when the sediment
accumulation reaches 50% of the available storage. For each facility the cleanout level
will be pre-determined in the inspection report.
o Floating trash and debris will be removed.
o Vegetation at the top and faces of the embankment will be removed.
o All outlet structures from the sediment ponds will be inspected for clogging and/or
structural damage. Debris will be removed, and any repairs needed will be done
immediately. Outflow locations will be inspected to make sure tailwater conditions are not
impeding discharge from the pond.
• Riprap channels:
o Riprap channels will be inspected at least once a year and after every major storm event
for displaced stones, slumping and erosion at edges, particularly in steeper segments.
o Woody vegetation will be removed from the riprap annually to avoid potential impacts
associated with the roots, such as dislodgement of the rocks
• General guidance:
o Placement of field markers to denote areas of concern and in need of repairs or
maintenance.
o A plan to access appropriate riprap (e.g., on site stockpiles) will be in place, to allow for
timely repairs of eroding channels.
o For each inspection, the inspector should bring a copy of the as-built drawings to mark
potential corrections and problem areas. The marked-up drawings will be stored digitally
so that confirmation of the works needed were completed in subsequent inspections. The
reports will also include photographic records to document the following:
- Vehicle access
- Overview of facility
- Overview of spillway
- Overview of discharge infrastructure
- Upstream view of the facility
- Downstream view of the facility
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 16
6 Detail Drawings and Specifications for Practices
Specified
References have been made to specific sections of the NC Erosion and Sediment Control Manual.
Detail drawings and specifications are provided on the included Figures C3.01, C3.02, C3.03 and
C3.04.
Detail D on Drawing C3.03 shows a typical Sediment Pond plan and profile with riser and skimmer
outlet. Detail A on Drawing C3.04 presents sections through Sediment Ponds 62 and 63, associated
with OSF-1. Detail B on Drawing C3.04 presents a section through Sediment Ponds 64, associated
with OSF-3
Detail C on Drawing C3.01 shows a section through a typical permanent riprap-lined channels
(Practice 6.21). Dimensions for the channels are shown in the table adjacent to the detail.
Detail D on Drawing C3.01 shows the permanent and operational outlet stabilization structure(Practice
6.41).
MH/DH April 2024
A B C D E F G H I J
NON CONTACT WATER CHANNEL DIMENSIONS
BOTTOM WIDTH
Depth Bottom Sideslope Bed Slope D50 (in.)
Channel ID (ft) Width (ft) (xH:1V) (ft/ft) Revetement Level Spreader (not to scale)
NC-P62 Steep 2.00 8 2 0.085 Riprap 10
NC-P62 Mod 2.00 8 2 0.049 Riprap 8 \/
NC-P62 Low Grass-lined �.- �j\
2.00 12 2 0.01 (•. Rr ►�.�+•vlwt- ��• �i,� DEPTH
NC-P63 SteepRiprap
2.00 12 2 0.084 p p 10 l ,his, .��.• �,...-
NC-P63 Mod 2.00 12 2 0.061 Ri ra 12 Ve '"' "� ' ' �`<< �.,��'N•'.►""�''
..: Transition p p 9 etated
2.50 12 2 0.01 diversion � �� � �•� •�- "� w,••••`
NC-P63 Low Grass-lined �`."'�"'Yy+� ys�''•f, "`"`;; �• "' to 0 grade
NC-P64 Steep 2.50 12 2 0.166 Riprap 16 �'ek k- ^�" �� � �� J ''`�• 4• , .•� " GRASS LINED CHANNEL
NC-P64 Mod 2.50 12 2 0.059 14
Riprap 14 �', 1'11+h�awt,�;,� 3 ,, ��^• �1` l ,,1�►• SEE TABLES
NC-P64 Low 3.00 12 2 0.01
►'� �....`4.,.v- '�-`I �. " `�" , �� ►�'' �► ��.. ,fir 1�� BELOW FOR
Grass-lined ; `,Si�+ ��'�'' „�,."tl• :Q ,..4; / � . ` �'" CHANNEL
NC-P65 Steep1 2.00 10 2 0.136 Riprap 14 A'�s--4L :;+ �.�' y1'' "''�.'•""� '• v �� 45�. y w \"' ►fit' DIMENSIONS
NC-P65 Steep2 2.00 10 2 0.086 Riprap 10r �,. �A�, .�4,�,.1., ;*` ,:� �""---`f a `' � ,� ,,' �' .��`• ' f�.
NC-P65 Mod 2.00 10 2 0.036 Riprap 6 ' �.�' ;�� + ,):,'+ 'At, I ''t`• \ /ram ' 'k%b RIPRAP SIZE
,+p• „1• + k "' ' ' �.' „4 BOTTOM WIDTH
2.50 10 2 0.01 ��'^ 1"r" �r•"� '14. ,k"� ;• +A '`j�,. ► �w " ' , Ha Stabilized
NC P65 Low Grass-lined � ti�� ,u• +���� >.d•• .•� .��. „fh►• � ,��• M� (SEE TABLE)
,a; ,vMl• �,. slope
NC-P66a Steep 2.00 8 2 0.062 Riprap 6 ,1. ' �►�' �� '' 1n •1• �v a� �"•
NC-P66a Mod 2.00 8 2 0.031 Riprap 6 Stable i � . �`' ,�,? Y. `+ ` /'� SIDE
undisturbed ,. 1� d�.b �t. (1' „l,- 1 , ,. � SLOPE
NC-P66a Low 2.00 8 2 0.0081 Grass-lined Outlet �I, u,. µ�, %"" '•-� �X'
j�, V. "I' .a"' �1 DEPTH i
NC-P67 2.00 0 2 0.052 Grass-lined 1,.1i wl, ,. 1,• t•. '�` ii..,l.. �' I r)```� \.11 �'' �`` off,.. ;0 1 0 0
NC-P68 Steep 2.00 0 2 0.09 Riprap 9 `l' n�, v.ia Ali,
NC-P68 Mod 2.00 0 2 0.045 Grass-lined ��I w�l'" `� ��'• ' \u. �''' �� `� ,�
NC-P69 Steep 2.00 8 2 0.117 Riprap 9 �' k"' �'� wlr.. +„ xl`�'• ti, „l
NC-P69 Mod 2.00 8 2 0.069 Riprap 8 k�• +' �5�� .4• �� .1 ,Wt n" ti+� '��' 101, FILTER FABRIC
NC-P69 Low 2.00 8 2 0.017 Grass-lined 1 �� .A • �'• r I'�`` 11`` +� RIPRAP THICKNESS 1.5X
�, � �, �l�• .a�.. 1 �+. w RIPRAP D co
NC-P66b Steep 2.00 8 2 0.081 Riprap 10 + t��' � ,,� wi`` w'•
NC-P66b Mod 2.00 8 2 0.031 Riprap 6 ( �� "' �, ���• Its.• l„' �+� RIPRAP CHANNEL
NC-P66b Low 2.00 8 2 0.02 Grass-lined
NC-DV6 Mod 4.00 0 2 0.044 Riprap 12 Figure 6.40a Level spreader is designed to disperse small volumes of concentrated flow across stable slopes.
NC-DV6 Low 5.00 0 2 0.008 Grass-lined
C TYPICAL CHANNEL DETAIL
C3.01 NOT TO SCALE
Cross Section
Material Variable
stapled in
{glace
6
� I11101
rein f
Level lip
� 0
o
spreader --� `._., r l = ,
Buried
min
3
v
J
WI Figure 6.44b Detail Of level spreader cross Section-
CA
m
O
O
W
PSOURCE: Erosion and Sediment Control Planning and Design Manual, North Carolina Department of Environmental and Natural Resources
W
W
Cn
J_
Q
W
coo o B TYPICAL LEVEL SPREADER DETAIL AND SECTION
U00 La C3.O1 NOT TO SCALE
LO
0
C) O
Cn
B o �� O� B Q �� x
C3.01 0 o O C3.01 C�RvP
DIA. ;I 11,„III-III '_ ` III=1 I I I I 1-1 i I-
LL o 0 0 0 0 -III-I ��� - III-III=1 - ROAD/BERM ARMOR
111-1 11-111=111= _ - - - - - SEE TABLE
o�o � � -III-I 11=1 11=1 11=1 11=1 I IJ I IJ I I-1 I I-1 I I-1 I I-1 I I
o 0 0 oQU ooU o 0
� o 0
a
FILTER FABRIC ao
y
o SECTION D-D N
RIPRAP CLASS B
POND '"
0�0�0 O SEE DETAIL C ON THIS SHEET
= FOR RIPRAP SPECIFICATIONS \/ LEVEL
of �\\�\//\y/ / MAN
co ////j i//i
PLAN /\\�\\�\���..� .. 40%
TYPICAL OUTLET PROTECTION �' /%\"/
�, �,�\,�\\r �\,�\,/\\,/\\//\ o DISCHARGE TO
D STABILIZATION DETAILNATURAL DRAINAGE
,� C3.01 NOT TO SCALE FILTER FABRIC \ � \\�\\\\\
----------
N
No TOP OF BERM
cli
3 3 0 /N/ LEVEL SPREADER
RIPRAP CLASS B 1� \\�/ SEE DETAIL D, SHEET C3.01
25�\�\i�\i\\j/\\\/�\j/�\j/�//�/�
Q FILTER FABRIC
0 O
U
a
E POND SPILLWAY DETAILS
Q C3.O1 NOT TO SCALE
Q0
C)
0
0
0
a- A PREPARED FOR CLIENT REVIEW DPH DPH 12/15/2023 ISSUED FOR:
DPH DPH 3/21/2024 PERMIT
- consulting A\\ ALBEMARLE
� DPH 6/25/2024
DRAWING TITLE:
0
DRAFT
SURFACE WATER CHANNEL PLANS
U IF THE ABOVE BAR SURFACE WATER CHANNEL
Y DOES NOT MEASURE 1 INCH, DESIGN: DRAWN: REVIEWED:
c��n PREPARE PREPAREP FOR CLIEN f�FgVWINGSCALEISALTERED MEH DLB JLH
KINGS MOUNTAIN MINING DETAIL SHEET (1 OF 4)
CHECKED: APPROVED: DATE:
DPH DPH 6/25/2024
N DRAWING NO. DRAWING TITLE NO. DESCRIPTION CHK'D APP'D DATE DRAWING NO. SHEET REVISION NO.
0
REFERENCE DRAWINGS REVISIONS PROFESSIONAL ENGINEERS STAMP FILE NAME: USPR000576-C3.01-C3.02 DETAIL SHEETS REVOOB2_EL.dwg SRK JOB NO.: USPR000576 C3.01 30 of 33 B
U
A B C D E F G H I J
SEE TABLES ON
SHEET C3.01 FOR
CHANNEL
RUNOFF FROM DIMENSIONS
HAUL ROAD 80 FT TYP
NATURAL GROUND
NON—CONTACT WATER DITCH SAFETY BERM 1.5 (TYP.) HAUL ROAD 80 FT TYP
SEE TABLES ON
� SAFETY BERM
F SHEET C3.01 FOR
Fx/S NC C 3 DEPTH SAFETY BERM CHANNEL C
Ti GRO Tc� �. 4 1 DIMENSIONS
SAFETY BERM
RUNOFF AND SEEPAGE WASTE ROCK �1
-RCN �5 FT MIN I �---WIDTH� \�/,\� 2% TYP.) CONTACT WATER DITCH FROM WASTE ROCK 3
e)kle�AoGGVOv ALTERNATE SECTION �iV4/4/ 4/4 ����CATCH BENCH 4/�4j�4j�4j�4j�4j4 2% Typ.)
IF HAUL ROAD IN FILL V�444�` 1 4 DE TH 4��4��4/�� ��4��4����44V�4V�/
I I 3
WII
TYPICAL HAUL ROAD SECTION D TYPICAL HAUL ROAD SECTION IN FILL
('A' ADJACENT TO ROCK STORAGE FACILITY c3.O2 SCALE: 1"=5' M
C3.O2 SCALE: 1"=5'
SEE TABLES ON
SHEET C3.01 FOR
RUNOFF FROM CHANNEL
HAUL ROAD 80 FT TYP
NATURAL GROUND DIMENSIONS
NON—CONTACT WATER DITCH SAFETY BERM SEE TABLES ON
4 4 SHEET C3.01 FOR
CHANNEL
F'rSTNCTOc3 1 DEPTH �1 SAFETY BERM DIMENSIONS OFF FROM
4 NON—CONTACT WATER DITCH NAT RALGROUND
5 FT MI �WIDTH� V��V�
Na��Go�No
EX�� GGR ALTERNATE SECTION DEPTH
IF HAUL ROAD IN FILL /�4/ // 4 3
I D TH LO
B TYPICAL HAUL ROAD SECTION IN CUT
C3.O2 SCALE: 1"=5'
3
J
W
N
Ca
O
O
Uj
W
H
W
W
_
Cn
SEE TABLES ON
SHEET C3.01 FOR
o CHANNEL
o DIMENSIONS HAUL ROAD 80 FT TYP SEE TABLES ON
SHEET C3.01 FOR
co RUNOFF FROM CHANNEL
0
NATURAL GROUND NON—CONTACT WATER DITCH SAFETY BERM DIMENSIONS
RUNOFF FROM PERIMETER ROAD 35 FT TYP r�
NATURAL GROUND
SAFETY BERM
0 1� DEPTH �1 SAFETY BERM
NON—CONTACT WATER DITCH SAFETY BERM
ry
IL
3 4 ' 4 2% TYP.) 2%
-------
-Willi T �444�4� 2% TYP.) 4�S��iypl4l DEPTH �1 �/4�/4� 4 4
.L T7 O�R O'Cti /��4 4 44 3
C14 / � � 1 3 �G� �5 FT MIN-► do �—WIDTFYf4� �j�
co
�X(EN0G GRO��O ALTERNATE SECTION IF
PERIMETER ROAD IN FILL F TYPICAL PIT RIM ROAD SECTION
a, C3.O2 SCALE: 1"=5' 00
N
0
U
0
TYPICAL HAUL ROAD
zi ( C' SECTION IN PARTIAL CUT
CD C3.O2 SCALE: 1"=5'
0
U)
a
a
.N rn
m
-
m
d
N
N
0
N
C
C
7
O
N
O
C
Y
c
0
`O
a
`O O
U
m
m
E
am
Q
0
LO
CD
0
0
0
A PREPARED FOR CLIENT REVIEW DPH DPH 12/15/2023 ISSUED FOR:
Z) B PREPARED FOR CLIENT REVIEW DPH DPH 3/21/2024 PERMIT
r
kconsulting
J\ ALBEMARLE DRAWING TITLE:
N SURFACE WATER CHANNEL PLANS
0
0
U IF THE ABOVE BAR DRAFT
SURFACE WATER CHANNEL
ry DOES NOT MEASURE 1 INCH, DESIGN: DRAWN: REVIEWED:
THE DRAWING SCALE IS ALTERED MEH DLB JLH KINGS MOUNTAIN MINING DETAIL SHEET (2 OF 4)
CHECKED: DPH APPROVED: DPH DATE: 3/21/2024
u, DRAWING NO. DRAWING TITLE NO. DESCRIPTION CHK'D APP'D DATE DRAWING NO. SHEET REVISION NO.
REFERENCE DRAWINGS REVISIONS PROFESSIONAL ENGINEERS STAMP FILE NAME: USPR000576-C3.01-C3.02 DETAIL SHEETS REVOOB2_EL.dwg SRK JOB NO.: USPR000576 C3.02 31 of 33 B
U
A B C D E F G H I J
HAUL ROAD WIDTH 80 FT. TYP.
SAFETY
SAFETY
BERM 2% BERM
TYP.�
3
HAUL ROAD H51
} CENTERLINE
EL. 917 FT. N
HAUL ROAD FILL
MULTI-PLATE ARCH CULVERT
SEE DETAIL
C3.03
EXISTING SOUTH
CREEK CHANNEL
M
CULVERT INLET ON NATURAL STREAM BOTTOM
EXISTING SOUTH
EXISTING CHANNEL INVERT 0
EL. 867 FT. RESTORED ORIGINAL CHANNEL BED
a
v�o�Lvr>� � '; � �� ,r��' � � - � CREEK CHANNEL
CULVERT LENGTH 461 FT. \ CULVERT OUTLET ON
EXISTING CHANNEL INVERT
EL. 857 FT.
HAUL ROAD SURFACE MULTI-PLATE ARCH CULVERT AT HAUL
('A_" ROAD H51 CROSSING SOUTH CREEK
/ C3,Q3 SCALE: 1"=20'
HAUL ROAD FILL
LO
MULTI-PLATE ARCH CULVE
STEEL POSTS STONE PAD
SELECT FILL
PER DESIGN FLOW DEPTH 100-YR,24-HR BELOW SKIMMER
STORM EVENT-4.2 ft RISE
10.76 ft
SKIMMER
EMBANKMENT
DEPTH 2
24FLOW HR STORM EVENT / ORIGINAL GROUND PLASTIC SLOPE
ORIGINAL GROUND
J FOOTER DRAIN PIPE remove
RISER
NI STRUCTURE
Ca 0 0 0 0 0 0 o PERMANENT DITCH
RESTORED ORIGINAL
w CHANNEL BED
Ww> 1
= SPAN 27.3 ft
ft
U)
wROAD
p WIDTH
N
O
co
MULTI-PLATE ARCH CULVERT c c STONE ENERGY
o C3.03 C3.03
M DISSIPATOR
B AT SOUTH CREEK CROSSING DETAIL
APPROACH CORRUGATED STEEL DISCHARGE BELOW SKIMMER
STONE PAD
C3.03 SCALE: 1"=5' CHANNEL PIPE(CSP)CULVERT CHANNEL
0
ry COIR FIBRE BAFFLES
U)
ROPE EMERGENCY
o SPILLWAY
0
WOOD STAKE OR
cli
METAL POST
INLET PROTECTION
SEE DETAIL C3.01 OUTLET PROTECTION
co
SEE DETAIL C3.01 PLAN VIEW
o-
P PLAN VIEW 00
N
0
TOP OF EMBANKMENT
U
0
0
TRASH BACK 1
SKIMMER Z
iii-- =l I=1T=I I=I I—
o RISER - f EMERGENCY SPILLWAY
o ROAD STRUCTURE Q =I 1 I—I I I—I —I I I—I I I—I I I—III=III=Tf=I
WIDTH m- 2 5 —I I=III—III—III—I I I=III=I I I=I I I=III=I I I=I I I — 2.5
I I—III—III=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I—III—I
w t III—III—I11=III=III=III=III=III=III=11 I=III=1 I=I I I=1I1=I I=I I I— 1 BARREL PIPE
Aw - - I=1 I-1 I-1 I-1 I-1 I-1 11=1 11=1 1=1 1=1 11=1 11-1 I, I I� I II i II I II II —
Y � =111=—=—IJ�I 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 I I - - �I I_I
N SAFETY If 4'¢M//V _ — — — — — — — — — — STABILIZED OUTLET
Ca
BERM /
ROAD FILL
APPROACH ti
CHANNEL CORRUGATED STEEL ��- j�� �� �� �� �� �� /a -
N ���� PIPE(CSP)CULVERT GRADE— DISCHARGE ����� ����������������� �����FMF����������������1 ��� ����������������������
No �V /% CHANNEL
C
� CLASS B STONE PAD ANTI-SEEP COLLAR
DIAMETER (4'X 4'X 1'MIN.)
o (SEE TABLE)
INLET PROTECTION D ANTIPLOTATION BLOCK CUT-OFF TRENCH
U) SEE DETAIL C3.01 OUTLET PROTECTION 2'DEEP
SEE DETAIL C3.01
SECTION C-C
0
a
SECTION VIEW
`o O
LD C TYPICAL CULVERT DETAIL
D TYPICAL SEDIMENT BASIN PLAN AND SECTION
a
C3.03 NOT TO SCALE C3,03 NOT TO SCALE
LO
CD
0
0
0
A PREPARED FOR CLIENT REVIEW DPH DPH 12/15/2023 ISSUED FOR:
Z) B PREPARED FOR CLIENT REVIEW DPH DPH 3/21/2024 PERMIT
;rkconsulting
J\ ALBEMARLE DRAWING TITLE:
N SURFACE WATER CHANNEL PLANS
0
U IF THE ABOVE BAR DRAFT
SURFACE WATER CHANNEL
ry DOES NOT MEASURE 1 INCH, DESIGN: DRAWN: REVIEWED:
THE DRAWING SCALE IS ALTERED MEH DLB JLH KINGS MOUNTAIN MINING DETAIL SHEET (3 OF 4)
CHECKED: DPH APPROVED: DPH DATE: 3/21/2024
u, DRAWING NO. DRAWING TITLE NO. DESCRIPTION CHK'D APP'D DATE DRAWING NO. SHEET REVISION NO.
REFERENCE DRAWINGS REVISIONS PROFESSIONAL ENGINEERS STAMP FILE NAME: USPR000576-C3.01-C3.02 DETAIL SHEETS REVOOB2_EL.dwg SRK JOB NO.: USPR000576 C3.03 32 of 33 B
U
A B C D E F G H I J
D TYPICAL SEDIMENT BASIN
C3.03 PLAN AND PROFILE
x
O
k
O
O —
OVERFLOW SPILLWAY
SEE DETAIL C3.01
/ 840•D0 TLAND BU ER
ZONE
r7 _
-- -----
rn
O
Z
SKIMMER D
------------ O Z'
O O
U
W
0
�A �,V --
920.00 --
O� M
OVERFLOW SPILLWAY E
TYPICAL SEDIMENT BASIN SEE DETAIL C3.01
3.03 PLAN AND PROFILE
\ N 0
0
Ln \ `' S50 0
O
I
O
WETLAND BUFFER k0 SKIMMER
ZONE O
i
---------------------
0 00
2
2� O20 0 j
OVERFLOW SPILLWAY E
SEE DETAIL C3.01
D TYPICAL SEDIMENT BASIN
C3.03 PLAN AND PROFILE
i
2
0 1 BERM 2
> 1 POND 2 EXISTING GROUND
w BOTTOM _ 1
ml SECTION C-C'
j OSF-1 SLOPE WETLAND BUFFER
� BERM BOUNDARY
w 1 POND
BOTTOM B
WETLAND BUFFER OSF-3 SEDIMENT PONDS PLAN AND PROFILE
Q SECTION A-A' BOUNDARY 1C,3,04 1" = 30'
w
0
N
O
M
U
0
M
U BERM
LO
2 1 2 2 EXISTING GROUND
o BOTTOM -----
r
<Un SECTION B-B'
g WETLAND BUFFER
0
BOUNDARY
v
N
a)
LL
0)
A OSF-1 SEDIMENT PONDS PLAN AND PROFILE
co
00
C3.04 1" = 30'
0
U
0
0
2-o
2
0
0
M
0
U)
a
a
.N rn
as
a)
LL
m
d
N
N
O
N
C
C
7
O
N
C
Y
c
0
p
`o
a
`o O
U
m
m
E
m
Q
LO
CD
0
0
0
A PREPARED FOR CLIENT REVIEW DPH DPH 12/15/2023 ISSUED FOR:
Z) DPH DPH 3/21/2024 PERMIT
Q
z srkconsulting0 DPH 6/25/2024 J� ALBEMARLE
DRAWING TITLE:
U) SURFACE WATER CHANNEL PLANS
r_
C
U IF THE ABOVE BAR DRAFT
SURFACE WATER CHANNEL
aryi FOR CLIEN MEH DLB JLH DOES NOT MEASURE 1 INCH, DESIGN: DRAWN: REVIEWED:
PEPARE
l / WINGSCALEISALTERED KINGS MOUNTAIN MINING DETAIL SHEET (4 OF 4)
CHECKED: DPH APPROVED: DPH DATE: 6/25/2024
u, DRAWING NO. DRAWING TITLE NO. DESCRIPTION CHK'D APP'D DATE DRAWING NO. SHEET REVISION NO.
REFERENCE DRAWINGS REVISIONS PROFESSIONAL ENGINEERS STAMP FILE NAME: USPR000576-C3.01-C3.02 DETAIL SHEETS REVOOB2_EL.dwg SRK JOB NO.: USPR000576 C3.04 33 of 33 B
U
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 17
7 Vegetation Plan
In accordance with the North Carolina Application for a Mining Permit, a reclamation plan must include
plans for year-round seeding, including the time of seeding and the amount of seed, type of seed,
fertilizer, lime, and mulch per acre. The recommendations must include general seeding instructions
for both permanent and temporary revegetation.
A preliminary seed mix and schedule provided by SWCA is included in Table 7.1.
Table 7.1: Preliminary Seed Mix Composition and Schedule
Seed Mix Type Seeding Dates Seeding Rates
NC Steep Slope Mix ERNMX-310 All dates 45 Ibs/acre
Native Habitat Strip Mine Mix ERNMX-111 All dates 20 Ibs/acre
Native Steep Slope w annual rye(ERNMX-181) Feb 15-Aug 15 60 Ibs/acre
Native Steep Slope w grain rye ERNMX-181-2 Aug15-Feb 16 75 Ibs/acre
Source:SRK,2023
Temporary cover species for erosion control would include:
• Brown Top Millet: Feb 15-Aug 15 20 lb/acre
• Annual Rye Grain: Aug 15- Feb 15 30 lb/acre
No fertilizer is recommended at the site due to the success of volunteer regrowth seen during site
visits. Seed would be procured from Ernst Conservation Seeding or other approved seeding
contractor.
Wildlife habitat is typically established by creating ecosystems of native species, and reshaping
landscapes to create suitable habitat. Monitoring and measurement criteria for vegetation and wildlife
success will be developed as mine plans progress.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 18
8 Supporting Calculations
Hydrological and hydraulic calculations were primarily conducted using WinTR-55 models developed
for the project. Appendices E-1A ("Runoff Estimation") and E-11B ("Channel Design") present a
summary of hydrological and hydraulic calculations and modeling results used for the design of erosion
and sediment control measures.Appendix E-1 C presents a summary of calculations conducted for the
design of the sediment ponds with skimmers.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 19
9 References
North Carolina Sedimentation Control Committee, North Carolina Department of Environmental and
Natural Resources, and the North Carolina Agricultural Extension Service. Erosion and Sediment
Control Planning and Design Manual, May 2013.
Surface MINING Manual (1996). State of North Carolina, Department of Environment, Health and
Natural Resources, February 1996.
SRK, 2024. Conceptual Report Closure Plan Kings Mountain Mining Project September 2024
SWCA, (2023a). Baseline Soil Sampling and Analysis for the Albemarle Kings Mountain Lithium Mining
Project Cleveland County, North Carolina, prepared for Albemarle U.S., by SWCA Environmental
Consultants, Kelley House, Andrew Harley Broomfield, Colorado, April 2023.
SWCA, (2023b). Biological Resources Summary Report for the Kings Mountain Lithium Mine,
Cleveland County, North Carolina Interim Draft, prepared for Albemarle U.S., by SWCA Environmental
Consultants, Colorado, April 2023.
USDA Agricultural Research Service (2019). Small Watershed Hydrology (WinTR-55). United States
Department of Agriculture. Model. https://hdl.handle.net/l0113/AA22714
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Page 20
Disclaimer
The opinions expressed in this Report have been based on the information supplied to SRK Consulting
(U.S.), Inc. (SRK) by Albemarle Corporation (Albemarle). These opinions are provided in response to
a specific request from Albemarle to do so, and are subject to the contractual terms between SRK and
Albemarle. SRK has exercised all due care in reviewing the supplied information. Whilst SRK has
compared key supplied data with expected values, the accuracy of the results and conclusions from
the review are entirely reliant on the accuracy and completeness of the supplied data. SRK does not
accept responsibility for any errors or omissions in the supplied information and does not accept any
consequential liability arising from commercial decisions or actions resulting from them. Opinions
presented in this report apply to the site conditions and features as they existed at the time of SRK's
investigations, and those foreseeable. These opinions do not necessarily apply to conditions and
features that may arise after the date of this Report.
Copyright
This report is protected by copyright vested in SRK Consulting (U.S.), Inc. It may not be reproduced
or transmitted in any form or by any means whatsoever to any person without the written permission
of the copyright holder, SRK.
MH/DH April 2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Appendices
Appendix E-1A: Runoff Estimation for
the Kings Mountain Mining Project
MH/DH April 2024
BMK USPR0576
Albemarle KM OSF-1 Hydrology
Cleveland NOAA-B County, North Carolina
Storm Data
Rainfall Depth by Rainfall Return Period
2-Yr 5-Yr 10-Yr 25-Yr 100-Yr 500-Yr 9999-Yr
(in) (in) (in) (in) (in) (in) (in)
--------------------------------------------------------------------------------
3.63 4.56 5.3 6.32 7.98 10.1 28.5
Storm Data Source: User-provided custom storm data
Rainfall Distribution Type: Type II
Dimensionless Unit Hydrograph: <standard>
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:43:49 PM
BMK USPR0576
Albemarle KM OSF-1 Hydrology
Cleveland NOAA-B County, North Carolina
Watershed Peak Table
Sub-Area Peak Flow by Rainfall Return Period
or Reach 10-Yr 100-Yr
Identifier (cfs) (cfs)
----------------------------------------------------------------------------------
SUBAREAS
RF1 21.89 42.76
RF2 25.29 49.40
RO1 55.87 140.51
RO2 24.94 60.82
RF3 8.35 15.45
RF4 5.52 9.14
REACHES
OUTLET 89.92 218.81
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:43:49 PM
BMK USPR0576
Albemarle KM OSF-1 Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Summary Table
Sub-Area Drainage Time of Curve Receiving Sub-Area
Identifier Area Concentration Number Reach Description
(ac) (hr)
--------------------------------------------------------------------------------
RF1 6.46 0.134 71 Outlet
RF2 7.30 0.121 71 Outlet
RO1 60.90 0.655 59 Outlet
RO2 23.12 0.571 60 Outlet
RF3 2.01 0.100 75 Outlet
RF4 1.00 0.100 85 Outlet
Total Area: 100.79 (ac)
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:43:49 PM
BMK USPR0576
Albemarle KM OSF-1 Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Time of Concentration Details
Sub-Area Flow Mannings's End Wetted Travel
Identifier/ Length Slope n Area Perimeter Velocity Time
(ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr)
--------------------------------------------------------------------------------
RF1
SHEET 100 0.2163 0.150 0.059
SHALLOW 198 0.3110 0.050 0.006
CHANNEL 1608 0.0385 0.040 10.00 12.00 6.473 0.069
Time of Concentration .134
RF2
SHEET 100 0.2120 0.150 0.060
SHALLOW 200 0.3114 0.050 0.006
CHANNEL 1280 0.0381 0.040 10.00 12.00 6.465 0.055
Time of Concentration .121
RO1
SHEET 100 0.0100 0.400 0.443
SHALLOW 1458 0.0383 0.050 0.128
CHANNEL 1273 0.0409 0.050 14.00 24.00 4.210 0.084
Time of Concentration .655
RO2
SHEET 100 0.0100 0.400 0.443
SHALLOW 865 0.0341 0.050 0.081
CHANNEL 853 0.0291 0.050 20.00 20.00 5.041 0.047
Time of Concentration .571
RF3
User-provided 0.100
Time of Concentration 0.100
RF4
User-provided 0.100
Time of Concentration 0.100
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:43:49 PM
BMK USPR0576
Albemarle KM OSF-1 Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Land Use and Curve Number Details
Sub-Area Hydrologic Sub-Area Curve
Identifier Land Use Soil Area Number
Group (ac)
--------------------------------------------------------------------------------
RF1 Meadow -cont. grass (non grazed) C 6.46 71
Total Area / Weighted Curve Number 6.46 71
RF2 Meadow -cont. grass (non grazed) C 7.3 71
Total Area / Weighted Curve Number 7.3 71
RO1 Residential districts (2 acre) B 23 65
Woods (good) B 37.9 55
Total Area / Weighted Curve Number 60.9 59
RO2 Residential districts (2 acre) B 12 65
Woods (good) B 11.12 55
Total Area / Weighted Curve Number 23.12 60
RF3 Paved parking lots, roofs, driveways D .31 98
Meadow -cont. grass (non grazed) C 1.7 71
Total Area / Weighted Curve Number 2.01 75
RF4 Paved parking lots, roofs, driveways D .5 98
Meadow -cont. grass (non grazed) C .5 71
Total Area / Weighted Curve Number 1 85
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:43:49 PM
BMK USPR0576
Albemarle KM OSF Hydrology
Cleveland NOAA-B County, North Carolina
Storm Data
Rainfall Depth by Rainfall Return Period
2-Yr 5-Yr 10-Yr 25-Yr 100-Yr 500-Yr 1000-Yr
(in) (in) (in) (in) (in) (in) (in)
--------------------------------------------------------------------------------
3.63 4.56 5.3 6.32 7.98 10.1 11.0
Storm Data Source: User-provided custom storm data
Rainfall Distribution Type: Type II
Dimensionless Unit Hydrograph: <standard>
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:47:21 PM
BMK USPR0576
Albemarle KM OSF Hydrology
Cleveland NOAA-B County, North Carolina
Watershed Peak Table
Sub-Area Peak Flow by Rainfall Return Period
or Reach 10-Yr 100-Yr
Identifier (cfs) (cfs)
----------------------------------------------------------------------------------
SUBAREAS
RF1 77.22 150.26
RF2 30.40 59.07
RF3 4.54 12.82
REACHES
OUTLET 110.79 218.44
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:47:21 PM
BMK USPR0576
Albemarle KM OSF Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Summary Table
Sub-Area Drainage Time of Curve Receiving Sub-Area
Identifier Area Concentration Number Reach Description
(ac) (hr)
--------------------------------------------------------------------------------
RF1 26.45 0.247 71 Outlet
RF2 9.44 0.173 71 Outlet
RF3 3.39 0.100 53 Outlet
Total Area: 39.28 (ac)
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:47:21 PM
BMK USPR0576
Albemarle KM OSF Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Time of Concentration Details
Sub-Area Flow Mannings's End Wetted Travel
Identifier/ Length Slope n Area Perimeter Velocity Time
(ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr)
--------------------------------------------------------------------------------
RF1
SHEET 100 0.0300 0.130 0.116
SHALLOW 360 0.3000 0.050 0.011
CHANNEL 3120 0.0353 0.035 12.00 14.00 7.222 0.120
Time of Concentration 0.247
RF2
SHEET 100 0.0300 0.130 0.116
SHALLOW 360 0.3000 0.050 0.011
CHANNEL 1458 0.0520 0.035 12.00 14.00 8.804 0.046
Time of Concentration .173
RF3
SHEET 50 0.3000 0.130 0.027
SHALLOW 270 0.3000 0.050 0.008
CHANNEL 343 0.1310 0.045 10.00 15.00 9.528 0.010
Time of Concentration 0.1
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:47:21 PM
BMK USPR0576
Albemarle KM OSF Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Land Use and Curve Number Details
Sub-Area Hydrologic Sub-Area Curve
Identifier Land Use Soil Area Number
Group (ac)
--------------------------------------------------------------------------------
RF1 Meadow -cont. grass (non grazed) C 26.45 71
Total Area / Weighted Curve Number 26.45 71
RF2 Meadow -cont. grass (non grazed) C 9.44 71
Total Area / Weighted Curve Number 9.44 71
RF3 Meadow -cont. grass (non grazed) B 1.695 58
Brush - brush, weed, grass mix (good) B 1.695 48
Total Area / Weighted Curve Number 3.39 53
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:47:21 PM
BMK USPR0576
Albemarle KM SSP Hydrology
Cleveland NOAA-B County, North Carolina
Storm Data
Rainfall Depth by Rainfall Return Period
2-Yr 5-Yr 10-Yr 25-Yr 100-Yr 500-Yr 1000-Yr
(in) (in) (in) (in) (in) (in) (in)
--------------------------------------------------------------------------------
3.63 4.56 5.3 6.32 7.98 10.1 11.0
Storm Data Source: User-provided custom storm data
Rainfall Distribution Type: Type II
Dimensionless Unit Hydrograph: <standard>
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:51:12 PM
BMK USPR0576
Albemarle KM SSP Hydrology
Cleveland NOAA-B County, North Carolina
Watershed Peak Table
Sub-Area Peak Flow by Rainfall Return Period
or Reach 10-Yr 100-Yr
Identifier (cfs) (cfs)
----------------------------------------------------------------------------------
SUBAREAS
RF1 6.96 13.57
RF2 5.64 11.01
RF3 2.67 5.21
RF4 4.03 7.86
RF5 6.45 12.58
RO1 7.01 15.85
RO2 3.85 8.76
REACHES
OUTLET 32.42 66.43
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:51:12 PM
BMK USPR0576
Albemarle KM SSP Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Summary Table
Sub-Area Drainage Time of Curve Receiving Sub-Area
Identifier Area Concentration Number Reach Description
(ac) (hr)
--------------------------------------------------------------------------------
RF1 1.93 0.100 71 Outlet
RF2 1.57 0.100 71 Outlet
RF3 .74 0.100 71 Outlet
RF4 1.12 0.100 71 Outlet
RF5 1.79 0.100 71 Outlet
RO1 4.52 0.426 63 Outlet
RO2 1.61 0.100 62 Outlet
Total Area: 13.28 (ac)
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:51:12 PM
BMK USPR0576
Albemarle KM SSP Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Time of Concentration Details
Sub-Area Flow Mannings's End Wetted Travel
Identifier/ Length Slope n Area Perimeter Velocity Time
(ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr)
--------------------------------------------------------------------------------
RF1
SHEET 100 0.2500 0.150 0.056
SHALLOW 43 0.3300 0.050 0.001
CHANNEL 803 0.0520 0.035 10.00 12.00 8.579 0.026
Time of Concentration 0.1
RF2
User-provided 0.100
Time of Concentration 0.100
RF3
User-provided 0.100
Time of Concentration 0.100
RF4
User-provided 0.100
Time of Concentration 0.100
RF5
User-provided 0.100
Time of Concentration 0.100
RO1
SHEET 100 0.0020 0.150 0.385
SHALLOW 396 0.0700 0.050 0.026
CHANNEL 472 0.0520 0.035 10.00 12.00 8.741 0.015
Time of Concentration .426
RO2
User-provided 0.100
Time of Concentration 0.100
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:51:12 PM
BMK USPR0576
Albemarle KM SSP Hydrology
Cleveland NOAA-B County, North Carolina
Sub-Area Land Use and Curve Number Details
Sub-Area Hydrologic Sub-Area Curve
Identifier Land Use Soil Area Number
Group (ac)
--------------------------------------------------------------------------------
RF1 Meadow -cont. grass (non grazed) C 1.93 71
Total Area / Weighted Curve Number 1.93 71
RF2 Meadow -cont. grass (non grazed) C 1.57 71
Total Area / Weighted Curve Number 1.57 71
RF3 Meadow -cont. grass (non grazed) C .74 71
Total Area / Weighted Curve Number .74 71
RF4 Meadow -cont. grass (non grazed) C 1.12 71
Total Area / Weighted Curve Number 1.12 71
RF5 Meadow -cont. grass (non grazed) C 1.79 71
Total Area / Weighted Curve Number 1.79 71
RO1 Woods (good) B 2.25 55
Woods (good) C 2.27 70
Total Area / Weighted Curve Number 4.52 63
RO2 Woods (good) B .805 55
Woods (good) C .805 70
Total Area / Weighted Curve Number 1.61 62
WinTR-55, Version 1.00.10 Page 1 6/24/2024 2:51:12 PM
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Appendices
Appendix E1-13: Channel Design for
the Kings Mountain Mining Project
MH/DH April 2024
TABLE A-3a
FLOW RESULTS FROM HEC-HMS
Albemarle Kings Mountain PFS
Archdale Channel Design Date: 6/25/24
PROJECT NO.:USPR000576 I By:GKH
Chkd:DPH
HMS Run Description 700(Data Range Name:HECHMS_100)
V Copy entire HTML Output from Standard Report(Global results ONLY)and paste in cell below:
From Win TR-55,manually entered
Global Results Summary
Hydrologic Element Drainage Area Peak Discharge(AC) (CFS) Time of Peak Volume(AC-FT)
OFSI NV-DV6 60.9 140.5 na na
OSFI NC-P62 7.3 49.4 na na
OSFI NC-P63 29.58 103.56 na na
OSF2 NC-P64 26.45 150.26 na na
OSF2 NC-P65 9.44 59.07 na na
OSF3 NC-P66a 3.4 21.34 na na
OSF3 NC-P66b 6.83 45.42 na na
OSF3 NC-P67 1.12 7.86 na na
OSF3 NC-P68 0.74 5.21 na na
OSF3 NC-P69 6.45 29.42 na na
Page 1 of 1
SRK Consulting
h[tps://srk.sh..p.int.."siW./NAUSPR000576/Internal/0300_Hydrology/_SSP hydrology/020_Prolect data(m*ing)/Hydraulics/BasiuH&H Woftheet 08F Perim June 2024.,Ism 6/25/2024
Table A-4
Channel Hydraulic Calculations
Albemarle Kings Mountain PFS SSL \ Date: 6/25/24
Archdale Channel Design 0 SSR By:GKH
PROJ NO.:USPR000576 'E 8y,/ 3' Chkd:
Apprvd:
Channel Design Geo etry Channel Roughness Parameters
egmres
Left Right Minimum Channel Hydraulic Mannings'n' Mannings'n'
HEC HMS Channel Bed Side Side Bottom Channel Curvature Jumpllmpact Riprap for Capacity for Stability
Design Storm Element ID Length Slope Slope Slope Width Depth Radius Block Colo Calculation Design Channel (Depth (Velocity
Reach Designation IHMS Run for (ft) (ftlft) (HAV) (H:1V) (ft) (ft) (ft) (Jump/Block) Methodology Lining Calculation) Calculation)
NC-P62 Steep 100 OSF1 NC-P62 290 0.0850 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P62 Mod 100 OSF1 NC-P62 665 0.0490 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P62 Low 100 OSF1 NC-P62 410 0.0100 2.0 2.0 12.0 2.00 0 None G Grass-lined 0.035 0.030
NC-P63 Steep 100 OSF1 NC-P63 150 0.0840 2.0 2.0 12.0 2.00 0 Robinson R Riprap 0.040 0.035
NC-P63 Mod 100 OSF1 NC-P63 730 0.0610 2.0 2.0 12.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P63 Low 100 OSF1 NC-P63 725 0.0100 2.0 2.0 12.0 2.50 0 None G Grass-lined 0.035 0.030
NC-P64 Steep 100 OSF2 NC-P64 370 0.1660 2.0 2.0 12.0 2.50 0 Robinson R Riprap 0.040 0.035
NC-P64 Mod 100 OSF2 NC-P64 805 0.0590 2.0 2.0 12.0 2.50 0 USACE Steep R Riprap 0.040 0.035
NC-P64 Low 100 OSF2 NC-P64 1993 0.0100 2.0 2.0 12.0 3.00 0 None G Grass-lined 0.035 0.030
NC-P65 Steepl 100 OSF2 NC-P65 68 0.1360 2.0 2.0 10.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P65 Steep2 100 OSF2 NC-P65 750 0.0860 2.0 2.0 10.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P65 Mod 100 OSF2 NC-P65 200 0.0360 2.0 2.0 10.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P65 Low 100 OSF2 NC-P65 590 0.0100 2.0 2.0 10.0 2.50 0 None G Grass-lined 0.035 0.030
NC-P66a Steep 100 OSF3 NC-P66a 200 0.0620 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P66a Mod 100 OSF3 NC-P66a 320 0.0310 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P66a Low 100 OSF3 NC-P66a 530 0.0081 2.0 2.0 8.0 2.00 0 None G Grass-lined 0.035 0.030
NC-P67 100 OSF3 NC-P67 425 0.0520 2.0 2.0 0.0 2.00 0 None G Grass-lined 0.035 0.030
NC-P68 Steep 100 OSF3 NC-P68 130 0.0900 2.0 2.0 0.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P68 Mod 100 OSF3 NC-P68 230 0.0450 2.0 2.0 0.0 2.00 0 None G Grass-lined 0.035 0.030
NC-P69 Steep 100 OSF3 NC-P69 190 0.1170 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P69 Mod 100 OSF3 NC-P69 315 0.0690 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P69 Low 100 OSF3 NC-P69 305 0.0170 2.0 2.0 8.0 2.00 0 None G Grass-lined 0.035 0.030
NC-P661b Steep 100 OSF3 NC-P66b 220 0.0810 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P661b Mod 100 OSF3 NC-P66b 90 0.0310 2.0 2.0 8.0 2.00 0 USACE Steep R Riprap 0.040 0.035
NC-P661b Low 100 OSF3 NC-P66b 340 0.0200 2.0 2.0 8.0 2.00 0 None G Grass-lined 0.035 0.030
NC-DV6 Mod 100 OFS1 NV-DV6 565 0.0440 2.0 2.0 0.0 4.00 0 Robinson R Riprap 0.040 0.035
NC-DV6 Low 100 OFS1 NV-DV6 540 0.0080 2.0 2.0 0.0 5.00 0 None G Grass-lined 0.035 0.030
Page 1 of 2
SRK Consulting
hnps://srk.shampdnt.coMsiW.INAUSPR000576/InWe .V0300_Hyd dogy/_SSP hyd dogy/020_Pnge data(w kingYHydraulic fflwinHBH Worksheel OSF Pen,June 2024.As, 6/25/2024
Table A-4
Channel Hydraulic Calculations
Albemarle Kings Mountain PFS Date: 6/25/2024
Archdale Channel Design By:GKH
PROJ NO.:USPR000576 Chkd:
rvd:
Hydraulic Calculations Channel Evaluations
a cu ate y rau is
Maximum Maximum Wave Runup Normal Flow Width Nominal Jump Depth/ Hydraulic
Peak Flow Velocity in Normal Flow at Channel Depth Shear Top Width Top Width at Median Rlprap Size Impact Block Jump/Impact
from HMS Channel Depth Froud Bends Stress (')Available Freeboard of Channel of Flow Depth (2)Channel Is Dsa Width Block Length
Reach Designation (cfs) (ft/sec) (ft) Number (ft) (lbs/sq ft) (ft) (ft) (ft) (ft) Stable? (In) (ft) (ft)
NC-P62 Steep 49.40 8.3 0.7 1.97 0.00 3.7 1.3 16.0 10.8 9.4 See Calc 10
NC-P62 Mod 49.40 6.9 0.8 1.53 0.00 2.5 1.2 16.0 11.3 9.6 See Calc 8
NC-P62 Low 49.40 4.1 1.0 0.83 0.00 0.6 1.0 20.0 15.8 13.9 Stable
NC-P63 Steep 103.56 9.6 0.9 2.04 0.00 4.5 1.1 20.0 15.4 13.7 See Calc 10
NC-P63 Mod 103.56 8.7 0.9 1.76 0.00 3.6 1.1 20.0 15.8 13.9 See Calc 12
NC-P63 Low 103.56 5.3 1.5 0.89 0.00 0.9 1.04 22.0 17.9 14.9 Stable
NC-P64 Steep 150.26 13.7 0.9 2.87 0.00 9.0 1.6 22.0 15.5 13.7 See Calc 16
NC-P64 Mod 150.26 9.7 1.2 1.79 0.00 4.3 1.3 22.0 16.7 14.4 See Calc 14
NC-P64 Low 150.26 5.9 1.8 0.91 0.00 1.1 1.2 24.0 19.2 15.6 Stable
NC-P65 Steepl 59.07 9.7 0.6 2.45 0.00 5.0 1.4 18.0 12.4 11.2 See Calc 14
NC-P65 Steep2 59.07 8.4 0.7 1.99 0.00 3.6 1.3 18.0 12.7 11.4 See Calc 10
NC-P65 Mod 59.07 6.3 0.9 1.33 0.00 2.0 1.1 18.0 13.5 11.7 See Calc 6
NC-P65 Low 59.07 4.5 1.2 0.85 0.00 0.7 1.3 20.0 14.7 12.3 Stable
NC-P66a Steep 21.34 5.6 0.5 1.59 0.00 1.8 1.5 16.0 9.9 8.9 See Calc 6
NC-P66a Mod 21.34 4.5 0.6 1.16 0.00 1.1 1.4 16.0 10.3 9.1 See Calc 6
NC-P66a Low 21.34 3.2 0.8 0.72 0.00 0.4 1.2 16.0 11.1 9.6 Stable
NC-P67 7.86 5.8 0.9 1.69 0.00 2.8 1.1 8.0 3.5 1.7 Stable
NC-P68 Steep 5.21 5.7 0.7 1.84 0.00 4.0 1.3 8.0 2.8 1.4 See Calc 9
NC-P68 Mod 5.21 5.0 0.8 1.53 0.00 2.2 1.2 8.0 3.1 1.5 Stable
NC-P69 Steep 29.42 7.7 0.5 2.18 0.00 3.4 1.5 16.0 9.9 8.9 See Calc 9
NC-P69 Mod 29.42 6.5 0.5 1.72 0.00 2.3 1.5 16.0 10.2 9.1 See Calc 8
NC-P69 Low 29.42 4.5 0.8 1.04 0.00 0.8 1.2 16.0 11.0 9.5 Stable
NC-P66b Steep 45.42 7.9 0.7 1.92 0.00 3.4 1.3 16.0 10.7 9.3 See Calc 10
NC-P66b Mod 45.42 5.8 0.9 1.23 0.00 1.7 1.1 16.0 11.5 9.8 See Calc 6
NC-P66b Low 45.42 5.5 0.9 1.16 0.00 1.2 1.1 16.0 11.7 9.9 Stable
NC-DV6 Mod 140.50 10.0 2.8 1.61 0.00 7.7 1.2 16.0 11.2 5.6 See Calc 12
NC-DV6 Low 140.50 5.9 3.7 0.84 0.00 1.8 1.3 20.0 14.6 7.3 Stable
Page 2 of 2
SRK Consulting
hnps://srk.shampdnlcoMsiW.INAUSPR000576/i.We .V0300_Hyd dogy/_SSP hydrdogy/020_Prge Gala(-khgyHydrauli.M.inHBH Workshe OSF P.H.June 2024.A- 6/25/2024
Table A-5a
Robinson Method Riprap Size Calculation
Albemarle Kings Mountain PFS Date:1 6/25/24
Archdale Channel Design By: GKH
PROJECT NO.: USPR000576 Chkd:
Apprvd:
Robinson Design of Rock Chutes
Riprap Calculations for Steep Riprap(Bed Slopes>2%but<40%)
Calculated
Particle Size Calculated Nominal
Design Flow Unit Width D50 Riprap Size Riprap
Flow Q Concentration Flow q (2) Factor of D50 Size D50
Reach Designation (cros) Factor (cros/m) (mm) Safety (in) (in)
NC-P63 Steep 2.932 1.25 0.877 198 1.20 9.35 10
NC-P64 Steep 4.254 1.25 1.269 324 1.20 15.30 16
NC-DV6 Mod 3.978 1.25 2.925 224 1.20 10.58 12
Design of Rock Chutes(ASAE Paper No.982136 7/98)
Determine unit flow at incipient motion for rock particle size
Unit flow rate is Q/median width,adjusted by a flow concentration factor of
1.25 (USAGE steep riprap method recommends a factor of 1.25)
(2)Bed Slope<10%:
q =9.76x10-7D501.89S-1.50
10%<=Bed Slope—40%:
q=8.07x10-6D501'89S-0.58
1.2 Factor of Safety over incipient motion
Page 1 of 1
SRK Consulting
https://srk.sharepoint.com/sites/NAUSPR000576/Internal/0300_Hydrology/_SSP hydrology/020_Project data(working)/Hydraulics/BasinH&H Worksheet OSF Perim JUne@.ftI2024
Table A-5c
U.S. Corps of Engineers (Steep) Method Riprap Size Calculation
Albemarle Kings Mountain PFS Date: 6/25/24
Archdale Channel Design By: GKH
PROJECT NO.: USPR000576 Chkd:
Apprvd:
USACE Method for flow in Channel Section Only
Riprap Calculations for Steep Riprap (Bed Slopes>2%but<20%)
Normal Calculated, Nominal
Design Flow Flow Depth Flow Unit Flow Particle Riprap Riprap
Reach Designation Q in Channel d Concentration q0) Size D30 Size D50 Size D50
(cfs) (ft) Factor (cfs/ft) (ft) (in) (in)
NC-P62 Steep 49.4 0.69 1.25 6.58 0.64 9.9 10
NC-P62 Mod 49.4 0.81 1.25 6.41 0.46 7.2 8
NC-P63 Mod 103.6 0.94 1.25 9.33 0.67 10.4 12
NC-P64 Mod 150.3 1.18 1.25 13.09 0.82 12.8 14
NC-P65 Steep1 59.1 0.59 1.25 6.60 0.83 12.9 14
NC-P65 Steep2 59.1 0.68 1.25 6.50 0.63 9.9 10
NC-P65 Mod 59.1 0.87 1.25 6.29 0.38 6.0 6
NC-P66a Steep 21.3 0.47 1.25 2.99 0.32 4.9 6
NC-P66a Mod 21.3 0.57 1.25 2.92 0.21 3.3 6
NC-P68 Steep 5.2 0.71 1.25 4.59 0.52 8.1 9
NC-P69 Steep 29.4 0.47 1.25 4.12 0.56 8.7 9
NC-P69 Mod 29.4 0.55 1.25 4.05 0.41 6.4 8
NC-P66b Steep 45.4 0.67 1.25 6.08 0.59 9.2 10
NC-P66b Mod 45.4 0.88 1.25 5.81 0.33 5.2 6
USACE Paper EM 1110-2-1601,6/30/94
1.95So.55sg2/3 Where: D30=Rock size 30%passing,S=bed slope,
D30 1
gee /3 q=unit flow,gee=gravity
Inputs below as determined in EM 1110-2-1601,6/30/94
Unit flow rate is Q/median width,adjusted by a flow concentration factor of
1.25 (USAGE steep riprap method recommends a flow concentration factor of 1.25)
Riprap D50 determined as recommended in EM 1110-2-1601,6/30/94
(D85 1/3 Where: Dx=rock size X%passing,
Dso=D3a
Dis
2.2 Cg: Gradation Coefficient(45015)
�{�Page 1 ofII}2
https://srk.sharepoint.com/sites/NAUSPR000576/Internal/0300_Hydrology/_SSP�proQogS/t}20_%ject data(working)/Hydraulics/BasinH&H Worksheet OSF Perim June
2024.xism 6/25/2024
SRK Consulting(U.S.), Inc.
Erosion and Sediment Control Plan Template—Kings Mountain Appendices
Appendix El -C: Sediment Pond Designs
MH/DH April 2024
Design Criteria,NDEQ Erosion Control Design Manual Practice Standard 6.61-Sediment Basin
Design Criteria Summary: NOTE:Input data are blue text
Primary Spillway: Riser/Barrel Pipe
Maximum Drainage Area: 100 ac
Minimum Sediment Storage Volume: 1800 ft3/ac of disturbed area
Minimum Surface Area: 435 ft2/cfs of Q10 peak inflow
Minimum L/W Ratio: 2 :1
Maximum L/W Ratio: 6 :1
Minimum Depth: 2 ft
Dewatering Mechanism: Skimmer(s)attached at bottom of riser pipe or flashboard riser
Minimum Dewatering Time: 48 hrs
Baffles Required: 3 baffles
(*Note:Basins less than 20 feet in length may use 2 baffles.)
0SF-1 Sediment Basin 62
Contributing Watershed 9.31 acres Check
10_YR Peak flow to Sediment Pond 34.00 cfs
100_YR Peak Channel Design Flow 65.00 cfs
Design Pond Capacity to Spillway: 16,758 ft3
0.38 ac-ft
Surface Area to Spillway: 14,790 sq ft
0.340 acres
Top Dimensions
Pond Top LengthEj
ft
Pond Top Widthft
Pond Depth to Crestft
Pond Depth to Spillwayft 2.00 ft spillway depth
Pond Side SlopesH:1 V
Depth at spillway 2.00 Check
L/W Ratio 3.3 Check
Pond Length at Spillway 240
Pond Width at Spillway 65
Pond Top Area at Spillway 15.600 x 1000 ft2
Pond Top Area at Spillway 0.358 acres Check 105% of Req'd
Pond Bottom Length 230 ft
Pond Bottom Width 55 ft Time to Drain.38 ac-ft pond with 3 in Skimmer Float
Pond Bottom Area 0.29 acres with 3 in orifice
Pond Volume at Spillway 0.65 ac-ft Check 169% of Req'd
7 2.5 0.2
0.291666667 Rymar Marlee Float Size 3 in 0.1
0.267253542 Rymar Marlee Orifice Size 3 in 2.0 w
x 0.1
Initial Depth in Pond 2.0 ft a 3
Dewatered when Depth<= 0.1 ft o 1.5 0.1 0
Peak Outflow 0.146 cfs 0.1 0
66 gpm t 1.0 0.1 v
Time to Dewater 57.0 hrs Check 119% of Req'd o 0.0 E
0.5
0.0
PMP Spillway Width 20 ft 0.0 0.0
PMP Spillway Side Slopes 2.5 H:1 V o 10 20 30 40 50 60 70 80
Weir Coefficient 3.09 Elapsed Time(hours)
Peak Head in Spillway 1.00 ft
100_YR Peak Inflow to Pond 65.0 -Depth in Pond -Skimmer Outflow
Peak Outflow from Spillway 68.0 cfs Check 105% of 100_YR
Freeboard in Spillway 1.00 ft
Design Criteria,NDEQ Erosion Control Design Manual Practice Standard 6.61-Sediment Basin
Design Criteria Summary: NOTE:Input data are blue text
Primary Spillway: Riser/Barrel Pipe
Maximum Drainage Area: 100 ac
Minimum Sediment Storage Volume: 1800 ft3/ac of disturbed area
Minimum Surface Area: 435 ft2/cfs of Q10 peak inflow
Minimum L/W Ratio: 2 :1
Maximum L/W Ratio: 6 :1
Minimum Depth: 2 ft
Dewatering Mechanism: Skimmer(s)attached at bottom of riser pipe or flashboard riser
Minimum Dewatering Time: 48 hrs
Baffles Required: 3 baffles
(*Note:Basins less than 20 feet in length may use 2 baffles.)
0SF-1 Sediment Basin 63
Contributing Watershed 30.58 acres Check
10_YR Peak flow to Sediment Pond 52.00 cfs
100_YR Peak Channel Design Flow 113.00 cfs
Design Pond Capacity to Spillway: 55,044 ft3
1.26 ac-ft
Surface Area to Spillway: 22,620 sq ft
0.519 acres
Top Dimensions
Pond Top Length 300 ft
Pond Top Width 110.0 ft
Pond Depth to Crest 6.00 ft
Pond Depth to Spillway 4.00 ft 2.00 ft spillway depth
Pond Side Slopes 2.5 H:1 V
Depth at spillway 4.00 Check
L/W Ratio 2.7 Check
Pond Length at Spillway 290
Pond Width at Spillway 100
Pond Top Area at Spillway 29.000 x 1000 ft2
Pond Top Area at Spillway 0.666 acres Check 128% of Req'd _
Pond Bottom Length 270 ft
Pond Bottom Width 80 ft Time to Drain 1.26 ac-ft pond with 6 in Skimmer Float
Pond Bottom Area 0.50 acres with 5 in orifice
Pond Volume at Spillway 2.32 ac-ft Check 184% of Req'd
7 5 0.6
0.291666667 Rymar Marlee Float Size 6 in 4
0.267253542 Rymar Marlee Orifice Size 5 in 4 o.s
Initial Depth in Pond 4.0 ft a 3 0.4 3
Dewatered when Depth<= 0.1 ft `0 3
Peak Outflow 0.523
cfs ` 2 0.3 0
235
9pm
Time to Dewater 57.5 hrs Check 120% of Req'd o 2 o.z £
1
0.1
1
PMP Spillway Width 35 ft 0 0.0
il
PMP Spillway Side Slopes 2.5 H:1 V 0 10 20 30 40 so 60 70 80
Weir Coefficient 3.09 Elapsed Time(hours)
Peak Head in Spillway 1.00 ft
100_YR Peak Inflow to Pond 113.0 -Depth in Pond -Skimmer Outflow
Peak Outflow from Spillway 114.3 cfs Check 101% of 100_YR
Freeboard in Spillway 1.00 ft
Design Criteria,NDEQ Erosion Control Design Manual Practice Standard 6.61-Sediment Basin
Design Criteria Summary: NOTE:Input data are blue text
Primary Spillway: Riser/Barrel Pipe
Maximum Drainage Area: 100 ac
Minimum Sediment Storage Volume: 1800 ft3/ac of disturbed area
Minimum Surface Area: 435 ft2/cfs of Q10 peak inflow
Minimum L/W Ratio: 2 :1
Maximum L/W Ratio: 6 :1
Minimum Depth: 2 ft
Dewatering Mechanism: Skimmer(s)attached at bottom of riser pipe or flashboard riser
Minimum Dewatering Time: 48 hrs
Baffles Required: 3 baffles
(*Note:Basins less than 20 feet in length may use 2 baffles.)
0SF-1 Sediment Basin 64
Contributing Watershed 13.30 acres Check
10_YR Peak flow to Sediment Pond 47.00 cfs
100_YR Peak Channel Design Flow 96.00 cfs
Design Pond Capacity to Spillway: 23,940 ft3
0.55 ac-ft
Surface Area to Spillway: 20,445 sq ft
0.469 acres
sio
ns Pond Top Le�gth 220 ft
Pond Top Width 110.0 ft
Pond Depth to Crest 4.00 ft
Pond Depth to Spillway 2.00 ft 2.00 ft spillway depth
Pond Side Slopes 2.5 H:1 V
Depth at spillway 2.00 Check
L/W Ratio 2.0 Check
Pond Length at Spillway 210
Pond Width at Spillway 100
Pond Top Area at Spillway 21.000 x 1000 ft2
Pond Top Area at Spillway 0.482 acres Check 103% of Req'd
Pond Bottom Length 200 ft Time to Drain.55 ac-ft Pond with 6 in Skimmer Float with 3.5 in orifice
Pond Bottom Width 90 ft
Pond Bottom Area 0.41 acres 18000 Time to Drain .55 ac-ft pond with 6 in Skimmer Float
Pond Volume at Spillway 0.90 ac-ft Check 163%of Req'd with 3.5 in orifice
7
0.291666667 Rymar Marlee Float SizeEN
in 3 0.3
0.267253542 Rymar Marlee Orifice Sizein
Initial Depth in Pondft2 0.2
Dewatered when Depth- ft 3
0
2
Peak Outflow 0.2211 cfs 2 0.2 o
9Pm
Time to Dewater 53.0 hrs Check 110% of Req'd a i 0.1
v E
0i o.iy
PMP Spillway Width 30 ft
PMP Spillway Side Slopes 2.5 H:1 V 0 0.0
Weir Coefficient 3.09 0 10 20 30 40 50 60 70 80
Peak Head in Spillway 1.00 ft Elapsed Time(hours)
100_YR Peak Inflow to Pond 96.0
Peak Outflow from Spillway 98.9 cfs Check 103%of 100_Y -Depth in Pond -skimmer outflow
Freeboard in Spillway 1.00 ft