Loading...
HomeMy WebLinkAbout20110677 Ver 3_More Info Received_20240923Homewood, Sue From: Williams, Kim <Kim.Williams@davey.com> Sent: Monday, September 23, 2024 4:40 PM To: Homewood, Sue Cc: Beecher, Gary H CIV USARMY CESAW (USA) Subject: [External] Re: Mid Atlantic mitigation Attachments: Impacts Rev 09-23-24.pdf; Overall Impact Map - 2024-09-23.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Sue Sorry about that. There is no change to Impact W2. Looks like this was just a rounding error. I have corrected the table so that the impact is 2.0 acres, the same as the previous site plans. Total impacts are now 5.67 acres. I have requested an updated credit reservation letter from the LCFUMB. Thanks! Kim On Mon, Sep 23, 2024 at 3:04 PM Homewood, Sue <sue.homewood@deq.nc.gov> wrote: As a follow up, there's one impact that doesn't match up to what I approved last year. W2 doesn't show that it has changed but my numbers from the previous approval isn't the same. Can you check on that. I've attached my updated impact table, can you double check everything else to make sure there are no errors for me. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deq.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Mid -Atlantic Industrial Project Table of Impacts Impact Label 2022 Plan March 2024 Plan Aug 2024 Plan Reason for Change Wetland Impact #1 6.9 6.9 N/A Non -Jurisdictional Wetland Impact #2 2.0 2.0 2.0 Wetland Impact #3 0.54 0.54 0.54 Wetland Impact #4 0.39 0.39 0.39 Wetland Impact #5 1.56 1.56 1.7 Impact extended to include sediment basin & stormwater pipes Wetland Impact #6 0.24 1.04 1.04 EAM footprint Wetland Impact #7 0 2.36 N/A Non -Jurisdictional Open Water Impact #1 0.257 0.257 0.257 Open Water Impact #2 0.30 0.30 0.30 Open Water Impact #3 0.067 0.067 0.067 Open Water Impact #4 0.176 0.176 0.176 Open Water Impact #5 0.075 0.16 0.16 EAM footprint Open Water Impact #6 0.185 0.185 0.2 Impact extended to powerline to accommodate drainage improvements Open Water Impact #7 0.128 0.128 0.128 Open Water Impact #8 0.128 0.128 0.128 Open Water Impact #9 0.11 0.11 0.18 Impact extended to powerline to accommodate drainage improvements Open Water Impact #10 0.11 0.11 0.11 Open Water Impact #11 0.01 0.01 0.11 Site Access & Utility Installation Open Water Impact #12 0.01 0.02 0.27 Road/Drainage Improvements Open Water Impact #13 0.01 0.25 0.27 Road/Drainage Improvements Open Water Impact #14 0.01 0.02 0.08 Original #14 combined with Impact #12; new #14 was previously overlooked. Open Water Impact #15 0 0.03 0.18 Rail/EAM footprint Open Water Impact #16 0.08 Ditch widening and deepening to accommodate off -site drainage Open Water Impact #17 0.09 Ditch widening and deepening to accommodate off -site drainage Open Water Impact #18 0.11 Site Access Improvements Open Water Impact #19 0.07 Site Access Improvements Open Water Impact #20 0.01 Hwy 74/76 Roadway Improvements Open Water Impact #21 0.01 Hwy 74/76 Roadway Improvements Open Water Impact #22 0.09 Hwy 74/76 Roadway Improvements TOTAL 404 WETLAND IMPACTS (AC) 11.7 14.79 5.67 TOTAL OPEN WATER IMPACTS (AC) 1.58 1.95 3.09 Change in Impact (Nov 2022 to March 2024) = Change in Impact (March 2024 to August 2024) _ P' s APPROXIMATE LOCATIONS OF POWER STRUCTURES (TYP) lier511:° allain I EXI 'TING 8" WA ER MAIN OPEN WATER IMPACT #3: I; ,, .11 0.067 AC (745 LF x 4 LF) OPEN WATER IMPACT #14: 0.08 AC (931 LF x 4 LF) OPEN WATER IMPACT #2: 0.30 AC (3,309 LF x 4 LF) WETLAND IMPACT #4: 0.39 AC APPROXIMATE LOCATIONS OF etPOWER STRUCTURES (TYP) • IV 4~w-weal am: EXISTING 16" WATER MAIN FROM COLUMBUS COUNTY D 2ND GAS LINE WETLAND IMPACT #3: 0.54 AC EXISTING 115 KV LINES OPEN WATER IMPACT #4: 0.176 AC (1922 LF x 4 LF) OPEN WATER IMPACT #11 0.11 AC (1,157 LF x 4 LF) OPEN WATER IMPACT #22: 0.09 AC (987 LF x 4 LF) OPEN WATER IMPACT #21: 0.01 AC (101 LF x 4 LF) EXIST N WETLAND IMPACT #2: 2.0 AC IN OTHERS. SHOWN FOR DISCUSSION PURPOSES ONLY OPEN WATER IMPACT #15: 0.18 AC (1,939 LF x 4 LF) 175' DUKE POWER LINE EASEM SXT RAILROAD FUTURE RAIL SPUR OPEN WATER IMPACT #1: 0.26 AC (2,797 LF x 4 LF) OPEN WATER IMPACT #17: 0.09 AC (984 LF x 4 LF) OPEN WATER IMPACT #16: 0.08 AC (884 LF x 4 LF) WETLAND IMPACT #5 1.7 AC STORMWATER BMP till AC TOP: 57.0' WSEL: 52.0' BOP: 99.0' OPEN WATER IMPACT #6 0.20 AC (2,202 LF x 4 LF) OPEN WATER IMPACT #13 0.27 AC (2,960 LF x 4 LF) OPEN WATER IMPACT #10 0.11 AC (1,240 LF x 4 LF) BUILDING I ADMIN. LAB. CAFE. ENTRY BUILDING PAAk KING EA 450 SPACES BUILDIN BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 9 WETLAND IMPACT #6 1.04 AC 115 KV POWER LINE RELOCATE OPEN WATER IMPACT #12 0.27 AC (2,960 LF x 4 LF) OPEN WATER IMPACT #9 0.18 AC (1,982 LF x 4 LF) mmimmin-I__ - --- � � � GAS GAS- GAS GAS GAS GAS GAS GAS GAS OPEN WATER IMPACT #20: 0.01 AC (129 LF x 4 LF) STORMWATER BM P 2 e5.9 AC TOP: 5T.0' WSEL: 52.0' BOP: 44.0' WATER TREATMENT AREA 3 AC BLDG _450SF_ PH 2 ELEC BLDG _ 60,450 SF GRAVEL APRON U G) 0 0 Li 0 CJ TOTAL WETLAND IMPACT: ± 5.67 AC TOTAL OPEN WATER IMPACT: ± 3.09 AC OPEN WATER IMPACT #5 0.16 AC (822 LF x 4 LF) "FM81'FM OPEN WATER IMPACT #19: 0.07 AC (747 LF x 4 LF) WETLANDS (TYP) OPEN WATER IMPACT #18: 0.11 AC (1,219 LF x 4 LF) EXISTING 8" )RCEMAIN EXISTING 30" NATURAL GAS PIPELINE GAS GAS a"�naAI'FM OPEN WATER IMPACT #7 0.128 AC (1,400 LF x 4 LF) OPEN WATER IMPACT #8 0.128 AC (1,398 LF x 4 LF) GAS GAS \ GAS 8"FM DACT -TLA DACT=� =N WAT NO\ DITC RIS-ICTIO GAS GAS GAS -J RAPHI CAL '200 400 800 - - 160 ( IN FEET ) 1 inch = 400 ft. PREPARED FOR: OVERALL WETLAND IMPACT MAP MID -ATLANTIC INDUSTRIAL PROJECT BRUNSWICK COUNTY, NC m THOMAS HUTTON 1020 Euclid Avenue Charlotte, NC 28203 • 980.201.5505 www.thomasandhutton.com 8/7/24 This map illustrates a general plan of the development which is for discussion purposes only, does not limit or bind the owner/developer, and is subject to change and revision without prior written notice to the holder. Dimensions, boundaries and position locations are for illustrative purposes only and are subject to an accurate survey and property description. COPYRIGHT © 2024 THOMAS & HUTTON