Loading...
HomeMy WebLinkAboutSW1240301_Response To Comments_20240923 Genesis Engineering Collaborative September 20,2024 Mr. Jacob Beeker State Stormwater Engineer DEVILRPost-Construction Stormwater Program 512 North Salisbury Street Raleigh,NC 27604 Re: Application for Stormwater Management Permit Response to Stormwater Request for Additional Information Marketplace at Mills River Stormwater Permit No. SW1240301 GEC Project No.21-118 Dear Mr.Beeker, We are in receipt of the DFIVILRPost-Construction Stormwater Program review comments for the above referenced project dated 8/09/2024. The construction plans, stormwater management report,and application forms have been revised to address said comments and below is a summary of the comments received and GEC's response to how each was addressed. DFIVILRcomment is BOLD and GEC response is lTALICIZED. 1. General Comment s a. Deed restrictions could not be found in the current submission of the project package. As a result, comment 2 of the previous request for additional information remains unaddressed. GEC Response:A copy ofthe Deed Restrictions and Conveyances form has been included with this submittal. b. SHWTboring information could not be located within the provided geotechnical report. If this has been missed,please direct reviewer to this information. Otherwise, the previous comment pertaining to this(3g)remains unaddressed.NOTE: The SHWT must be determined within the SCM footprint. GECResponse:Additional borings information and updated SHWTelevation estimate provided as AppendixB3 in the Storm water Management Report. Borings provided in this addendum report were taken within the SCM footprint. 2. Supplemental-EZ Form Comments a. Cover Page i. Line 7—Please include the required vegetated setback width(See 15A NCACO2H.1017(10)). 3360 Martin Farm Road Suite 2001 Suwanee,GA30024 470.375.20011 www.genesiseng.net Genesis Engineering Collaborative Page 12 GEC Response:Required vegetated setback width (30 it)added to Line 7. Please also see the On-Site Stream Determination Report for reference that a vegetated setback should not be required for this site. b. Drainage Area Pages i. Lines 5-7—The amounts given for the Entire Site column do not correspond to what is shown on the Application. Please revise.NOTE: Typically,there are no off-site components to the Entire Site column as off-site areas are not located within the site. GEC Response:Lines 5-7have been revised to only include on-site areas. ii. Line 12—Please provide a breakdown of the new BUAnot on subdivided lots, similar to the breakdown in Section IV, 10 of the Application. GEC Response:Breakdown ofnewBUAnot on subdivided lots have been added.For reference, this breakdown excludes new BUA for Lots 2-5.New BUA for Lots 2-5 is included as newBUA on subdivided lots. iii. Entire Site Column, Lines 19-21 —These items are not necessary for this column. GEC Response:Lines 19 through 21 of the Entire Site Column have been revised. c. Sand Filter Page i. Line 15—Previous comment (5ci)remains unaddressed. GEC Response:Line 15 has been revised. The required OVlplan is included as an attachment to the O&Vlagreement. If you have any questions, comments or need additional information, please feel free to contact me at 678.984.4683 or Jennifer.Losurdo@genesiseng.net. Sincerely, Je er Lo rdo,PE Managing Partner 3360 Martin Farm Road ! Suite 2001 Suwanee,GA30024 470.375.2001 www.genesiseng.net